Table of Contents

Advertisement

H3C S5170-EI & S5570S-EI Switch Series
Installation Guide
New H3C Technologies Co., Ltd.
http://www.h3c.com
Document version: 6W101-20221011

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S5570S-54S-PWR-EI-A and is the answer not in the manual?

Questions and answers

Summarization of Contents

Preface
Audience
Identifies the intended readers for this documentation.
Conventions
Details the text and GUI conventions used throughout the manual.
Documentation feedback
Provides contact information for submitting comments on the product documentation.
Symbols
Network topology icons
Illustrates icons used to represent network devices and connections in diagrams.
Examples provided in this document
Informs users that examples may differ from their specific device configurations.
Safety recommendations
Examining the installation environment
Details requirements for the installation environment, including ventilation, anti-moisture, and temperature.
Laser safety
Provides safety precautions related to laser emissions from the switch.
Installing the switch in a 19-inch rack
Installation methods
Describes the methods for mounting switches in a 19-inch rack.
Installing and removing a power supply
Installing/removing a power supply (1)
Details the procedure for installing and removing specific power supply models (CA-70A12, PSR75-12A, PSR150-D1).
Connecting the power cord
Connecting the power cord for a built-in power supply
Provides steps to connect the power cord to a built-in power supply.
Accessing the switch for the first time
Connecting the switch to a configuration terminal
Explains how to connect the switch to a terminal for configuration using the serial console port.
Starting the switch
Pre-start checklist
Lists essential checks before powering on the switch to ensure proper operation.
Setting up an IRF fabric
IRF fabric setup flowchart
Provides a visual flowchart outlining the steps for setting up an IRF fabric.
Plan IRF fabric setup
Covers planning aspects like site, size, master election, and member IDs for IRF fabric.
Planning IRF fabric setup
Planning IRF fabric size and the installation site
Guides on determining IRF fabric size and selecting appropriate installation locations.
Identifying the master switch and planning IRF member IDs
Details how to select a master switch and assign unique IDs to IRF members.
Maintenance and troubleshooting
Power supply failure
Addresses issues arising from power supply malfunctions in the switch.
Fan tray failure
Guides on diagnosing and resolving fan tray malfunctions indicated by the system status LED.
Configuration terminal display issues
No display
Troubleshoots the scenario where the configuration terminal shows no display after switch power-on.
Garbled display
Provides steps to resolve issues with garbled text or characters on the configuration terminal.

Table of Contents