MyLight MG3 Installation Manual

MyLight MG3 Installation Manual

Smart meter for energy monitoring and management solutions

Advertisement

Quick Links

Installation manual
Smart Master G3 (MG3)
ENGLISH
MAI-0005- MG3 Installation manual-V1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MG3 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Legal
MyLight Systems SAS Warranty
Downloadable warranty conditions from the website www.mylight-systems.com.
Registered Trademark
Recognition of all registered trademarks; absence of logo doesn't imply unconditional sale.
Reference Documents
List of related documents like datasheets; encourages checking for latest versions online.
Safety of Goods and Persons
Correct Use
Smart Master G3 usage guidelines, protection requirements, and indoor use only.
Country Certification and Authorisation
Product must be used in approved countries and according to documentation and local standards.
Qualified Technicians
Specifies required qualifications for personnel installing and commissioning the device.
Product Markings
Explanation of symbols and their meanings for safe and correct identification of the product.
Internet Connectivity Options
Ethernet Cable Connection
Direct internet connection using an Ethernet LAN port on the device and router.
PLC Plug Connection
Connecting via electrical wiring using a PLC plug. Includes steps for connecting the plug to the router.
Wi-Fi Connection on the Internet Router
Using a Wi-Fi repeater to establish internet connectivity for the Smart Master G3.
Connection Over an Existing PLC Circuit
Adding the MG3 to an existing home PLC network for communication.
Connection Through a Cellular Modem
Adding a cellular modem for internet access when no other network is available.
Electrical Connections
Power Supply Connection
Guidelines for connecting and protecting the device's power supply.
Relay Connection
Information on the switching relay, its capacity, control, and indicator light.
Extension and Current Transformer Connections
Connecting extensions and current transformers for measurement.
Current Transformer Connections
Procedure for installing current transformers to measure energy flow.
Connection of the RS485 Accessory
Connecting up to 10 RS485 devices for enhanced measurement and control.
Ethernet Connection
Using LAN and AUX Ethernet ports for additional device connectivity.
Example of Final Connections
Diagrams illustrating typical single-phase and three-phase connection setups.
Commissioning
Prerequisites
Essential checks before activating the Smart Master G3.
Switching on the Smart Master G3
Procedure for powering up the device and verifying its startup status.
Power Line Communication (PLC) Connection
Details on connecting the Smart Master G3 to PLC devices, including MyLight and external types.
Registration of the System
Process for registering users and the system via the MyProPortal interface.
De-commissioning
Disassembly
Step-by-step guide to safely dismantle and detach the Smart Master G3 from its mounting.
Recycling
Information on the proper disposal and recycling of the electronic device.

Table of Contents