eta SH 50P Installation Manual

eta SH 50P Installation Manual

Twin pellet burner 40-50 kw

Advertisement

Quick Links

2020-07-21
EN
0000000371
V.012
2503
939023-004
TWIN pellet burner
40-50 kW
Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SH 50P and is the answer not in the manual?

Questions and answers

Summarization of Contents

General
Preface
Introduction to the user manual and importance of proper installation for safe operation.
General Information
Covers copyright, technical changes, and explanation of symbols used in the manual.
Warranty, Guarantee, and Liability
Details conditions for warranty, guarantee, and liability, including installation requirements.
Dismantling and Disposal
Provides instructions for safe dismantling and environmentally friendly disposal of components.
Technical Data
Energy Labelling
Presents detailed energy efficiency classes, emissions data, and performance metrics for various models.
CE Conformity
CE Declaration of Conformity
Manufacturer's formal declaration of compliance with relevant EU directives and standards.
Installation
Adjusting the Log Boiler
Step-by-step guide for adjusting log boiler components prior to pellet burner installation.
Mounting the Heat Exchanger Cleaner
Instructions for installing the heat exchanger cleaning mechanism onto the boiler unit.
Installing the Actuators
Procedures for correctly mounting and connecting the air valve actuators.
Mounting the Pellet Burner
Comprehensive steps for attaching the pellet burner unit to the log boiler.
Attaching Pellet Hoses
Guidance on connecting pellet delivery and return hoses, including safety measures.
Network Connection
Information regarding the network cable installation for remote operation or monitoring.
Electrical Connections
Electrical Connection Requirements
Outlines essential safety and technical requirements for electrical installations by qualified personnel.
Circuit Board PE-C4 Twin Overview
Details the terminals and functions of the PE-C4 Twin circuit board for wiring.
SH and TWIN Connection Diagram
Illustrates the wiring diagram for connecting the SH and TWIN boiler components.
Concluding Installation Activities
Final steps for reattaching panels and covers after electrical work is completed.
Pellet Store Information
Pellet Store General Information
Provides guidelines for pellet delivery, storage room placement, and general operational considerations.
Pellet Store Structural Requirements
Specifies structural, dry storage, and dust removal requirements for the pellet storage area.
Calculating Pellet Supply and Store Size
Explains how to calculate annual pellet consumption and determine required storage dimensions.
Pellet Store Filling Nozzle Installation
Details the installation of pellet filling nozzles, including placement and protection measures.
Prohibited Items in Pellet Store
Prohibits water pipes or electrical cables in the pellet store to prevent hazards like swelling or explosion.
Tilted Floor Design for Pellet Store
Outlines the necessity and design specifications for a tilted floor to ensure full pellet extraction.
Pellet Hose Installation and Maintenance
Offers guidance on selecting, installing, and maintaining pellet hoses, including earthing requirements.
Fire Safety Regulations for Pellet Stores
Lists fire safety regulations for wood and fuel storage rooms in Austria and Germany.
Pellet Store Ventilation Requirements
Specifies ventilation requirements for pellet stores to prevent dangerous carbon monoxide concentrations.

Table of Contents