eta SH 40P Installation Manual

eta SH 40P Installation Manual

Twin pellet burner 40-50 kw

Advertisement

Quick Links

2020-07-21
EN
0000000371
V.012
2503
939023-004
TWIN pellet burner
40-50 kW
Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SH 40P and is the answer not in the manual?

Questions and answers

Summarization of Contents

General Information
Preface and Manual Overview
Introduction and overview of the manual's purpose and content.
General Information and Symbols
Details copyright, technical changes, and symbols used in the manual.
Technical Data
TWIN Pellet Burner Specifications
Detailed specs: capacity, efficiency, emissions, power consumption, and operating parameters.
Installation
Qualified Specialist Installation
Emphasizes that assembly and installation must be performed by qualified professionals only.
Adjusting the Log Boiler
Steps for adjusting the log boiler, including removing panels and insulation for access.
Detaching Side Panel
Changing Actuator Mounting Side
Procedure to change the mounting side of air valve actuators if necessary for installation.
Mounting the Pellet Burner
Attaching the Log Boiler Panel
Instructions for mounting the side panel supplied with the pellet burner onto the log boiler.
Attaching Pellet Burner to Boiler
Steps for physically attaching the pellet burner to the log boiler and aligning it correctly.
Mounting Fastening Brackets
Instructions for mounting fastening brackets for the pellet burner and its covers.
Mounting Pellet Burner Side Panel
Procedure for mounting the side panel of the pellet burner assembly.
Fastening Bottom Side Panel
Securing the side panel to the bottom of the unit.
Mounting Rear Panel
Installing the panel on the rear side of the unit.
Mounting Pellet Nozzle Panel
Attaching the panel for the pellet nozzles with correct spacing.
Attaching Pellet Hoses
Pellet Hose Laying Instructions
Reminder to follow specific guidelines for laying pellet hoses for optimal performance.
Mounting Fire Protection Sleeves
Instructions for fitting fire protection sleeves onto pellet hoses, if required.
Connecting Pellet Hoses to Boiler
Connecting the pellet hoses to the boiler and securing them with hose clamps.
Network Connection
Boiler Network Connectivity
Information on the pre-installed network cable and requirements for on-site extension.
Electrical Connections
Electrical Connection Requirements
General requirements for electrical connection, safety precautions, and component specifications.
SH and TWIN Connection
Concluding Activities
Steps to finalize the installation, including reattaching panels.
Installing Boiler Panels
Instructions for reattaching the boiler panels after electrical connections are made.
Mounting Top Panel
Instructions for mounting the top panel of the unit.
Mounting Heat Exchanger Cover
Attaching the cover for the automatic heat exchanger cleaning system.
Removing Protective Film
Guidance on removing protective film from covers without damaging the paint.
Pellet Store
General Pellet Store Information
Information on pellet delivery, storeroom placement, and burn-back protection during filling.
Pellet Store Structural Requirements
Defines structural requirements for pellet store walls and conditions for dry pellet storage.
Regular Pellet Store Dust Removal
Recommendations for regular cleaning and emptying of pellet stores to prevent dust accumulation.
Filling Nozzles
Installing Filling Nozzles (Narrow Side)
Instructions for installing filling and return air nozzles on the narrow side of the pellet store.
Anchoring Filling Nozzles
Guidelines for securely anchoring filling nozzles to the wall at the correct height.
No Cables/Pipes in Pellet Store
Aluminium Piping for Filling System
Requirements for using aluminium piping for filling systems and proper earthing.
Prohibition of Water Pipes and Cables
Prohibits water pipes and electrical cables in pellet stores to prevent hazards.
Tilted Floor
Necessity of a 40° Tilted Floor
Explanation of the necessity for a 40° tilted floor for complete pellet extraction.
Tilted Floor Construction
Details on materials and methods for constructing the tilted floor for the pellet store.
Tilted Floor Wall Clearance
Instruction to leave a gap between the tilted floor and wall to prevent noise transfer.
Pellet Hose Information
Suitable Pellet Hose Specifications
Specification of required DN50 pellet hoses with copper litz wire for suction and return air.
Pellet Hose Installation Tips
Advice on unrolling, bending, and routing pellet hoses for optimal performance and longevity.
Fire Safety Regulations
Austrian Fire Safety Regulations
Overview of Austrian regulations and standards for fire safety in buildings and fuel storage.
Fire Safety for Fuel Storage Rooms
Fire resistance requirements for walls, doors, and openings in fuel storage rooms.
Outdoor Fuel Store Clearances
Regulations regarding clearances for outdoor pellet storage containers from buildings.
Fuel Store Temperature Monitoring
Requirements for temperature monitoring systems in fuel stores.
German Fire Safety Regulations
Summary of German regulations for combustion equipment and pellet stores.
Ventilation
Pellet Store Ventilation Requirements
Guidelines for pellet store ventilation to prevent dangerous CO concentrations, referencing standards.
Ventilating Pellet Store Examples
Visual examples illustrating different scenarios for ventilating pellet stores.

Table of Contents