Download Print this page
August AT-9 Manual

August AT-9 Manual

Wastewater treatment plants

Advertisement

Quick Links

WASTEWATER TREATMENT
P L A N T T E C H N I C A L PA S S
AT SYSTEM
S O LU T I O N S F O R H U M A N A N D N AT U R E
WASTEWATER TREATMENT
PLANT MODEL AT6 - AT50

Advertisement

loading
Need help?

Need help?

Do you have a question about the AT-9 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation Guidelines for Wastewater Treatment Units
Selection of Installation Location
Guide on choosing the optimal site for the wastewater treatment unit, considering flow and regulations.
Preparation for Construction
Steps for preparing the construction site, including pipe laying and depth considerations.
Construction Process Details
Detailed steps for excavating the pit, installing the unit, backfilling, and ensuring proper alignment.
Blower and Air Supply Pipe Installation
Instructions for locating, connecting, and mounting the blower and its air supply tubing.
AUGUST BASIC Controller Installation
Guidance on installing and connecting the AUGUST BASIC control unit, including air circulation needs.
Unit Diagram and Technical Data
Technical Parameters of Wastewater Treatment Plants
Table detailing technical specifications and performance data for various unit models.
Treatment Process and Components Overview
Treatment Process Explanation
Explanation of the biological treatment stages and the unit's multi-compartment design.
Mechanical and Electrical Devices
Description of key components like solids bag, air distribution manifold, and airlifts.
AUGUST BASIC Controller Operation
Controller Setup and Initial Run
Instructions for the first-time setup, language, date, and time configuration.
Mode and Program Selection
Guide on changing operating modes and selecting pre-set treatment programs.
Additional Settings and GSM Module
Information on other settings, such as time setup, logs, and the GSM module functionality.
Operation and Maintenance Instructions
Unit Launching and Shutdown Procedures
Procedures for starting up and shutting down the wastewater treatment unit.
Key Control and Monitoring Points
Essential checks and observations for the owner during unit operation.
Controller Error Messages and Alarms
Explanation of controller alarms, their meanings, and troubleshooting steps.
Scheduled Maintenance and Service Intervals
Maintenance Notifications and Intervals
Information on controller warnings and recommended maintenance schedules.
Removal of Excess Sludge
Measurement of Settled Sludge Content
Method for measuring sludge concentration and determining removal needs.
Unit Maintenance Manual Procedures
Sludge Removal Procedures
Detailed steps for removing excess sludge from the biological reactor.
Maintenance Record Keeping Guidelines
Guidelines for recording all maintenance activities and service visits.
Security and Safety Precautions
Personal Protective Equipment (PPE)
Recommended personal protective equipment for handling the unit and wastewater.
Certificates and Declarations
Performance Certificate Details
Document confirming the performance results of the wastewater treatment system.
EC Declaration of Performance
Declaration of conformity with European standards for the product.