Desa SB350D Owner's Manual page 11

High pressure portable forced air heaters
Hide thumbs Also See for SB350D:
Table of Contents

Advertisement

SERVICE
PROCEDURES
Continued
Pump Pressure Adjustment
1. Remove pressure gage plug from fuel
pump port marked "GAGE."
2. Install accessory pressure gage (part
number M4574) to fuel pump port
marked "GAGE" (see Figure 10).
3.
Start heater (see Operation, page 5).
Allow motor to reach full speed.
4.
Adjust pressure. Use small flat blade
screwdriver to turn slotted screw at fuel
pump port marked "PRESS ADJ." Turn
screw clockwise to increase pressure.
Turn screw counterclockwise to de-
crease pressure. See specifications at
right for correct pressure for each model.
5. Stop heater (see page 5).
6. Remove pressure gage. Replace pres-
sure gage plug in fuel pump port
marked "GAGE."
106029
Pressure
Gage
Fuel Pump Port
Marked "GAGE"
Model
Pump Pressure
350,000 Btu/Hr
600,000 Btu/Hr
Figure 10 - Adjusting Pump Pressure
11
OWNER'S MANUAL
Pump
(Procedure if Pump is Binding)
1.
Remove upper shell (see page 10).
2.
Loosen hex screw on flange clamp at
rear of motor with
5/16" nut-driver (see Figure 11).
3.
Turn fan with hand (see Figure 12).
4.
If fan turns freely, tighten screw on
flange clamp.
5.
If fan does not turn freely, replace
pump.
6.
Replace upper shell.
Fuel Pump Port
Marked "PRESS
ADJ"
100 PSI
110 PSI
Figure 11 - Location of Screw on Flange
Clamp
Figure 12 - Turning Fan with Hand
Hex Screw
On Flange
Clamp
Continued

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb600dArl sb350dArl sb600d

Table of Contents