Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
NetApp Manuals
Enclosure
3040
Installation manual
NetApp 3040 Installation Manual
40u cabinet
Hide thumbs
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
page
of
24
Go
/
24
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
Overview and Specifications
Cabinet Features
Power Requirements and Heat Dissipation
Maximum Number of Trays
Install the Cabinet
Gather Required Tools and Equipment
Prepare to Move Cabinet
Estimate Cabinet Weight
Acclimate Cabinet
Remove Packing Materials
Checking Shipping Contents
Remove Heavy Components from Cabinet
Move Cabinet to Its Permanent Location
Complete Cabinet Installation
Lower Leveling Feet and Stability Foot
Reinstall Trays
Install Cable Spools and Tie Wraps
Install Additional Trays
Install Additional Mounting Rails
Connect the Cabinet to Power
To Complete the Cabinet Installation, Power on the Cabinet Components
Copyright Information
Trademark Information
How to Send Comments about Documentation and Receive Update Notifications
Advertisement
Quick Links
Download this manual
E-Series
Installing E-Series 3040 40U
Cabinet
September 2018 | 215-13048_A0
doccomments@netapp.com
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the 3040 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for NetApp 3040
Enclosure NetApp E Series Installation Manual
40u cabinet (24 pages)
Enclosure NetApp E2660 Replacement Manual
Replacing a drive drawer in a 60-drive tray (10 pages)
Summarization of Contents
Overview and specifications
Cabinet features
Details the standard features of the 3040 40U cabinet.
Power requirements and heat dissipation
Details the power ratings, distribution units, and heat dissipation specifications for operational planning.
Maximum number of trays
Specifies the maximum number of trays installable based on rack unit height for configuration.
Install the cabinet
Gather required tools and equipment
Lists the necessary tools and equipment required for a successful cabinet installation.
Prepare to move cabinet
Outlines steps for preparing the cabinet for relocation, including weight estimation and environmental acclimation.
Move cabinet to its permanent location
Provides guidance on safely moving the cabinet using its casters to the designated installation site.
Complete cabinet installation
Lower leveling feet and stability foot
Details how to adjust the cabinet's leveling feet and stability foot for secure placement.
Reinstall trays
Instructions for reinstalling drive and controller trays into their original locations post-relocation.
Install cable spools and tie wraps
Procedure for installing cable management accessories like spools and tie wraps.
Install additional trays
Guidance on installing extra trays and covering empty spaces to maintain proper cabinet airflow.
Install additional mounting rails
Instructions for installing extra mounting rails required for specific tray configurations.
Connect the cabinet to power
Steps for connecting the cabinet to external power sources and powering on its components.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the 3040 and is the answer not in the manual?
Questions and answers