Download Print this page

Advertisement

Quick Links

コンポ−ネント
BKM-101C
コンポ−ネント
BKM-102
Installation Manual for Dealers
特約店様用取付説明書
Monitors Available for BKM-101C and 102
BKM-101C
PVM-14M2U/14M2E/14M2A/14M4U/14M4E/14M4J/14M4A/14M4B
PVM-20M2U/20M2E/20M4U/20M4E/20M4J/20M4A
PVM-20S1WU/20S1WE/20S1WA(英文のみ/English only
BVM-14M4E/20M4E
Monitors Available for BKM-102
BKM-102
に対応するモニター
BVM-14M4DE/14M4DJ/20M4DE
WARNING!
When installing the kit, to prevent shock hazard,
do the following:
• Turn off the whole system connected to the
monitor.
• Unplug all cables, the power cable etc., con-
nected to the monitor.
取り付けの際は、感電を防ぐため、次の項目を必
ず守ってください。
モニターと接続しているシステムの電源をすべ
て切ってください。
モニターに接続されている電源ケーブルなど、
すべてのケーブルを外してください。
 1997 by Sony Corporation
SDI
<VIDEO>
キット
SDI
<AUDIO>
キット
102
および
に対応するモニター
3-859-887-06 (1)
)

Advertisement

loading
Need help?

Need help?

Do you have a question about the PVM-20M4J and is the answer not in the manual?

Questions and answers

Summarization of Contents

Product Information and Safety
Product Identification and Compatibility
Lists monitors compatible with BKM-101C and BKM-102 SDI kits.
Installation Safety Warning
Critical safety precautions to prevent shock hazard during installation.
Parts List
BKM-101C Components
Details the parts included with the BKM-101C component SDI kit.
BKM-102 Components
Details the parts included with the BKM-102 component SDI kit.
Installation Guide
Monitor Preparation for Installation
Steps 1-4: Removing rear cover, G board, connector panel, and installing adaptor.
Install BKM-102 (BA Board)
Steps 5-6: Install BKM-102 BA board into SDI module and connect cables.
Connect SDI Module and BB Board
Step 7: Connect SDI module, BB board to monitor and power boards.
Mount SDI Module in Monitor
Step 8: Physically install the SDI module into the monitor chassis.
Final Wiring and Cable Management
Steps 9-10: Connect ground wires and secure all installed cables.
Reassemble Monitor and Finish
Steps 11-14: Reinstall G board, connector panel, and manage cables.
Final Cover and Connector Access
Steps 15-16: Create connector holes, apply label, and replace rear cover.