Table of Contents

Advertisement

Contents
Product overview·························································································································································· 1
Regulatory model identification number ·························································································································1
Chassis overview·······························································································································································1
Switch and FRU aliases ····················································································································································2
Preparing for installation ············································································································································· 5
Safety recommendations ··················································································································································5
General safety recommendations ···························································································································5
Electricity safety ························································································································································5
Handling safety ························································································································································5
ESD prevention ·························································································································································5
Laser safety································································································································································6
Examining the installation site ·········································································································································6
Floor loading·····························································································································································6
Temperature ······························································································································································6
Humidity ····································································································································································6
Cleanness ··································································································································································7
EMI·············································································································································································7
Grounding·································································································································································8
Power·········································································································································································8
Cooling······································································································································································8
Space·········································································································································································9
Tools and equipment ····················································································································································· 10
Installing the switch ····················································································································································11
Check before installation··············································································································································· 11
Installing slide rails and cage nuts to the rack············································································································ 12
Installing slide rails ················································································································································ 12
Installing cage nuts for mounting brackets ········································································································· 16
Installing accessories to the chassis ····························································································································· 17
Installing mounting brackets and cable management brackets········································································ 17
Mounting the switch to the rack···································································································································· 20
Grounding the switch ···················································································································································· 21
Grounding the switch with a grounding strip····································································································· 21
Grounding the switch through the PE wire of an AC power supply ································································ 22
Installing modules·······················································································································································23
Attaching an ESD-preventive wrist strap······················································································································ 23
Installing a card······························································································································································ 24
Installing a power supply ·············································································································································· 25
Installing a power supply ····································································································································· 26
Connecting the power cable································································································································ 28
Installing a transceiver module (optional)···················································································································· 29
Installing an XFP/SFP+/SFP module···················································································································· 29
Connecting an SFP+ cable ··································································································································· 30
Setting up an IRF fabric ·············································································································································31
IRF fabric setup flowchart ·············································································································································· 31
Planning IRF fabric setup ··············································································································································· 31
Preparing for IRF fabric setup ······························································································································ 31
Planning the IRF network ······································································································································ 32
i

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the JC612A and is the answer not in the manual?

Questions and answers

Summarization of Contents

Product overview
Regulatory model identification number
Lists regulatory model numbers for HP A10500 series products.
Chassis overview
Describes the chassis views of the A10500 switches and their sections.
Preparing for installation
Safety recommendations
General and specific safety guidelines for installation.
ESD prevention
Measures to prevent electrostatic discharge damage to components.
Laser safety
Warnings and precautions related to laser safety.
Examining the installation site
Requirements for the installation site to ensure proper operation.
Floor loading
Ensuring the floor can support the equipment's weight and expansion.
Temperature
Specifies operating and storage temperature requirements for the switch.
Humidity
Details required humidity levels for optimal equipment performance.
Cleanness
Importance of a clean environment to prevent performance issues.
EMI
Explains electromagnetic interference and how to prevent it.
Grounding
Importance of a grounding system for reliability and lightning protection.
Power
Tasks to meet power requirements for the switch.
Cooling
Planning for adequate ventilation and cooling for the switch.
Space
Guidelines for maintaining sufficient clearance around the equipment.
Tools and equipment
Lists necessary tools and equipment for installation.
Installing the switch
Check before installation
Verifies readiness and site requirements before installing the switch.
Installing slide rails and cage nuts to the rack
Steps for installing slide rails and cage nuts into the rack.
Installing accessories to the chassis
Procedures for attaching mounting and cable management brackets to the chassis.
Mounting the switch to the rack
Steps to physically mount the switch into the installed rack.
Grounding the switch
Instructions for properly grounding the installed switch.
Installing modules
Attaching an ESD-preventive wrist strap
How to properly wear and use an ESD-preventive wrist strap.
Installing a card
Step-by-step guide for installing various types of cards into the switch.
Installing a power supply
Procedures for installing power supply units into the chassis.
Connecting the power cable
Instructions for connecting the power cable to the power supply.
Installing a transceiver module (optional)
Guide for installing optical transceiver modules into the switch.
Connecting an SFP+ cable
Steps to connect an SFP+ cable to the switch's SFP+ ports.
Setting up an IRF fabric
IRF fabric setup flowchart
Visual representation of the steps involved in setting up an IRF fabric.
Planning IRF fabric setup
Preparation steps before configuring an IRF fabric.
Preparing for IRF fabric setup
Tasks to complete before initiating IRF fabric setup.
Planning the IRF network
Planning network aspects of the IRF fabric.
Identifying the master switch
Determining which switch will act as the master in the IRF fabric.
Planning member IDs
Assigning unique IDs to member switches in the IRF fabric.
Identifying the physical IRF ports on the member switches
Selecting ports for IRF connection based on requirements.
Installing IRF member switches
Steps to install switches that will be part of an IRF fabric.
Configuring basic IRF settings
Initial configuration steps for IRF member switches.
Connecting the physical IRF ports
How to connect the IRF member switches using physical ports.
Accessing the IRF fabric to verify the configuration
Procedures to verify the IRF fabric setup and functionality.
Connecting your switch to the network
Common methods of logging in to a switch
Overview of accessing the switch via console, Telnet, or SSH.
Accessing the switch for the first time
Initial steps to connect to the switch using a console cable.
Setting up the configuration environment
Connecting a terminal (PC) to the switch for configuration.
Setting terminal parameters
Configuring terminal emulator settings for switch management.
Switch startup and initial configuration
Verification before power-on
Checks to perform before powering on the switch.
Powering on the switch
Steps to turn on the switch and observe initial boot output.
Switch configuration
Initially configuring the switch
Default security settings and remote management configuration.
Configuring authentication on a user interface
Setting up authentication methods for user access.
Configuring the basic access function
Basic network settings for data forwarding.
Configuration example
Example of configuring Telnet service and basic network settings.
Connecting the switch to the network
Network connection overview
Verifying settings before connecting the switch to the network.
Connecting your switch to the network through optical fibers
How to connect using optical fibers and transceiver modules.
Testing connectivity
Testing the connectivity
Using ping or tracert commands to test network connectivity.
Troubleshooting
Troubleshooting methods
Ways to troubleshoot switch failures using CLI and LEDs.
Troubleshooting the system
Diagnosing and resolving system-level issues.
Troubleshooting the switch during the operation
Using CLI commands to diagnose operational issues.
Power supply system failure
Troubleshooting steps for power supply issues.
Fan failure
Steps to diagnose and resolve fan tray failures.
MPU failure
Troubleshooting steps for Main Processing Unit (MPU) failures.
LPU and switching fabric module failure
Diagnosing failures in Line Processing Units (LPUs) and fabric modules.
Interface failure
Troubleshooting steps for network interface issues.
Replacement procedures
Replacing a power supply
Detailed steps for replacing a power supply unit.
Replacing a card
Instructions for replacing MPU, LPU, or fabric modules.
Replacing a fan tray
Procedure for replacing a faulty fan tray.
Support and other resources
Contacting HP support
Information on how to contact HP support.
HP subscription service
Information on registering for HP product updates.
Related documentation and websites
Links to related documents and useful HP websites.
Conventions
Explanation of conventions used in the documentation.
Appendix A Technical specifications
Weights and dimensions
Details the weights and dimensions of chassis and cards.
Module power consumption and system power consumption
Information on power consumption for modules and the system.
Card power consumption
Power consumption details for various card models.
Fan tray power consumption
Power consumption figures for different fan trays.
System power consumption
Calculation of overall system power consumption.
Heat dissipation
Information on heat dissipation calculations and units.
Environmental specifications
Operating and non-operating environmental parameters.
Noise
Sound pressure levels for different switch models.
Appendix B FRUs and compatibility matrixes
MPUs
Specifications for the Main Processing Unit (MPU).
LPUs
Specifications for Line Processing Units (LPUs).
Switching fabric modules
Details on the switching fabric modules.
Power supplies
Specifications for the 2500W AC Power Supply.
Fan trays
Specifications for the A10500 fan trays.
Mounting accessories
Transceiver modules
List and specifications of supported transceiver modules.
Appendix C LEDs
MPU LEDs
Explains the LEDs on the MPU for status monitoring.
LPU LEDs
Details on LEDs for LPU ports.
XFP port LEDs
Explains the LINK and ACT LEDs for XFP ports.
Switching fabric module LEDs
Describes the RUN and ALM LEDs for fabric modules.
Fan tray status LEDs
Explains the OK and FAIL LEDs for fan trays.
Power supply LEDs
Details the AC and DC LEDs on the power supply.
MPU active/standby status LED
Indicates the active or standby status of the MPU.
Appendix D Cables
Ethernet twisted pair cable
Details about Ethernet twisted pair cables.
Cable type
Classification of Ethernet cables by performance and pinouts.
Pin assignments
Pinout details for RJ-45 MDI and MDI-X interfaces.
Making an Ethernet twisted pair cable
Step-by-step guide to creating an Ethernet cable.
Optical fiber
Overview of optical fibers and their types.
Fiber optic precautions
Important precautions when working with fiber optics.
SFP+ cable details
Information on using SFP+ cables for interconnecting interfaces.
Appendix E Cabling recommendations
General cabling requirements
Guidelines for cable curvature radii.
Correct use of labels
Proper labeling practices for cables.
Cable management requirements
Guidelines for organizing and routing cables.
Appendix F Repackaging the switch
Removing cables from the switch
Steps to disconnect various cables from the switch.
Removing network cables
Instructions for removing twisted pair and optical fiber cables.
Repackaging switch accessories
Procedures for packing switch accessories.
Repackaging power supply
Procedures for packing a removed power supply.
Repackaging card
Procedures for packing a removed card.
Repackaging switch chassis
Procedures for packing the switch chassis.
Removing chassis from rack
Steps to remove the chassis from the rack.
Removing mounting brackets
Steps to remove mounting brackets from the chassis.

Table of Contents