Rigging & assembly instructions
BAC PCC Series Rigging & Assembly Instructions
Closed circuit cooling towers and evaporative condensers, counterflow induced draft
Hide thumbs
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
page
of
48
Go
/
48
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
Introduction
Safety
Shipping
Pre-Rigging Checks
Cold Weather Operation
Location
Warranties
Unit Operation
Unit Rigging & Assembly
Rigging
Section Assembly of Two-Piece Cells
Section Assembly of Optional Three-Piece Cells
Rigging of Containerized Units
Multi-Cell Unit Installation
Motor Installation for External Motors
Fan Guard Installation
Optional Accessory Installation
Bottom Water Outlet
PCD Hood Assembly (Pfi Only)
Discharge Sound Attenuation (Pfi Only)
Fan Cowl Extensions
Motor Removal Davit
Inclined Access Ladder
Mechanical Access Platform
Mechanical Access Platform for Multi-Cell Units
Mechanical Access Platform Side Ladder
Mechanical Access Platform End Ladder
Fill Access Platform (Pfi Only)
Fill Access Platform for Multi-Cell Units
Fill Access Platform Side Ladder
Fill Access Platform End Ladder
Top Perimeter Guardrails
Top Perimeter Guardrail Ladder to Unit Base
Top Perimeter Guardrail Ladder to Fill Platform
Ladder Safety Cage
Automatic Bearing Greasers
Basin Accessories
Heater Control Panel
Advertisement
Quick Links
Download this manual
PFi
PCC
Counterflow Induced Draft
Coil Products
RIGGING & ASSEMBLY INSTRUCTIONS
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the PCC Series and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for BAC PCC Series
Accessories BAC PFi Series Rigging & Assembly Instructions
Closed circuit cooling towers and evaporative condensers, counterflow induced draft (48 pages)
Accessories BAC PT2 Operation & Maintenance Manual
Cooling tower (36 pages)
Accessories BAC SP2B series Rigging And Installation Instructions
Adiabatic cooler (26 pages)
Accessories BAC TrilliumSeries DFCV Series Rigging And Installation Instructions
Dry & adiabatic cooler (32 pages)
Accessories BAC Trillium Series Operating And Maintenance Instructions Manual
Adiabatic cooler (34 pages)
Accessories BAC FXV Rigging & Assembly Instructions
Crossflow coil products (26 pages)
Accessories BAC NEXUS NXF-0403N-CS2TS-H1 Operation & Maintenance Manual
Modular hybrid cooler (66 pages)
Accessories BAC Nexus Quick Start Manual
Modular hybrid cooler. ipilot control system (10 pages)
Accessories BAC TrilliumSeries TRF-1010N-C80GX17E Rigging & Assembly Instructions
(24 pages)
Accessories BAC FXVT 288 Series Operating And Maintenance Instructions Manual
Closed circuit cooling towers (44 pages)
Summarization of Contents
Introduction to PFi and PCC Units
Safety Guidelines
Essential safety precautions for installation and operation, including lifting and general safety.
Shipping and Pre-Rigging Checks
Information on unit shipping configurations and crucial pre-rigging inspection procedures.
Unit Specifications and Environment
Details on unit weight, anchoring, nitrogen charge, cold weather, and location considerations.
Unit Operation and Warranties
Guidance on unit operation and reference to warranty limitations.
Unit Rigging and Assembly
Rigging Procedures
Guidelines for lifting units, including vertical dimensions and spreader bar requirements.
Two-Piece Cell Assembly
Procedure for assembling units shipped in two sections, focusing on alignment and sealing.
Containerized Unit Rigging
Steps for rigging and assembling units that are shipped within a container.
Motor Installation for External Motors
Steps for installing external motor assemblies, including lifting, securing, and power band tensioning.
Fan Guard Installation
Instructions for mounting fan guards securely onto the unit for safety.
Optional Accessory Installation
Bottom Water Outlet & PCD Hood Assembly
Installation of optional bottom water outlets and PCD hoods for PFi units.
Inclined Access Ladder Installation
Detailed steps for installing inclined access ladders for various unit configurations.
Mechanical Access Platform Installation
Instructions for installing mechanical access platforms, including securing modules to the unit.
Top Perimeter Guardrails
Installation of safety guardrails around the top perimeter of the unit.
Ladder Safety Cage Installation
Steps to reassemble and securely bolt safety cages onto ladders for enhanced safety.
Heater Control Panel Installation
Guidance on locating, mounting, and wiring the heater control panel for the unit.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the PCC Series and is the answer not in the manual?
Questions and answers