Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Watermill Manuals
Water Pump
BP65D
Manual
Watermill BP65D Manual
Heavy duty brass shower pumps
Hide thumbs
1
2
3
4
5
6
7
8
9
10
Table Of Contents
11
page
of
11
Go
/
11
Contents
Table of Contents
Bookmarks
Advertisement
Table of Contents
1
Important Instructions
2
Positioning Pump
3
Hot Water Cylinder Connections
4
Cold Water Supply
5
Connecting Pump
6
Electrical Connections
7
Before Using
8
Fault Finding
9
Technical Data
Download this manual
HEAVY DUTY
BRASS SHOWER PUMPS
YOUR GUARANTEE IS AT RISK
IF PUMP NOT INSTALLED CORRECTLY.
SEE SECTION 2 IMPORTANT INSTRUCTIONS
Performance Shower Products
SERVICE HELPLINE TEL:
01883 730339
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the BP65D and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Watermill BP65D
Water Pump Watermill BP65S Manual
Heavy duty brass shower pumps (11 pages)
Water Pump Watermill BP100D Manual
Heavy duty brass shower pumps (11 pages)
Water Pump Watermill PC25DLV Installation Instructions Manual
Low voltage shower pumps (12 pages)
Water Pump Watermill PC50DLV Installation Instructions Manual
Low voltage shower pumps (12 pages)
Summarization of Contents
GENERAL INFORMATION
IMPORTANT INSTALLATION INSTRUCTIONS
Foreign Particles and Pump Integrity
Prevent foreign particles entering pump outlets to avoid malfunction and impeller damage.
Water Supply & Head Requirements
Do not connect to mains pressure; minimum 2m head recommended; avoid air locks.
Pump Location and Sealing
Position for access, mitigate water damage from leaks, ensure correct sealing.
Pipework & Connection Guidelines
No non-return valves on inlet; use supplied push-fit hoses, inserted to red line.
Hose Disconnection & Solder Flux Rules
Disconnect hoses by pushing retaining ring; keep solder flux from plastic parts.
Pre-Use Purging & System Testing
Do not run pump dry; purge thoroughly; test system after installation.
Hot Water Temperature Limit
Maximum hot water temperature must not exceed 60°C (140°F).
PUMP POSITIONING GUIDELINES
HOT WATER CYLINDER CONNECTIONS
Jointing Compounds & Surrey Flange
Do not use jointing compounds; Surrey Flange recommended for air-free supply.
COLD WATER SUPPLY REQUIREMENTS
Mains Connection & Jointing Compound Prohibition
Do not connect to water mains; do not use jointing compounds.
PUMP CONNECTION PROCEDURE
Pump Connection Jointing Compound Rule
Do not use any jointing compounds when connecting the pump.
ELECTRICAL CONNECTIONS
Earthing and Power Cord Safety
Pump must be earthed; use correct cable for replacement, ensuring secure connections.
PRE-USE CHECKS AND OPERATION
Dry Running Warning & System Purging
Warning against dry running; thoroughly purge water before electrical supply.
Initial Start-up & Leak Checks
Turn on water, check leaks, purge system, switch on power, run for 2 minutes.
FAULT FINDING GUIDE
Pump Fails to Start Checks
Checklist for initial start-up failures including power, valves, filters, and orientation.
Pump Operation Issues: Off/Pulsing
Address not turning off, pulsing, or unstable temp; check backflow, air, flow switches.
TECHNICAL DATA
PRODUCT GUARANTEE INFORMATION
Guarantee Terms and Registration
Two-year guarantee with registration within 10 days of purchase.
GUARANTEE CLAIM PROCEDURE
Pump Removal & Site Visit Policy
Do not remove pump; site visits require adult presence and may be chargeable.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the BP65D and is the answer not in the manual?
Questions and answers