Advertisement

6720220330 Revised 05-12
ES SERIES

Table of Contents

Model Nomenclature ....................................................................................................................................1
Initial Inspection .............................................................................................................................................2
General Description.......................................................................................................................................2
Moving and Storage......................................................................................................................................2
Safety Considerations ...................................................................................................................................2
Location .............................................................................................................................................................2
Installation.........................................................................................................................................................2
Condensate Drain...........................................................................................................................................3
Duct System .....................................................................................................................................................3
Piping..................................................................................................................................................................3
Electrical.............................................................................................................................................................4
Thermostat Connections .............................................................................................................................4
Safety Devices & the UPM Controller......................................................................................................5
Sequence of Operation Single Stage Units ..........................................................................................8
Electric Heater Package Option ................................................................................................................8
Sequence of Operation Two-Stage Units..............................................................................................9
Well Water Systems .......................................................................................................................................9
Installation of Pressure Regulating Valves ............................................................................................9
Cooling Tower / Boiler Application .........................................................................................................9
Earth Coupled Systems..............................................................................................................................10
System Checkout .........................................................................................................................................10
Unit Start-Up..................................................................................................................................................10
Maintenance ..................................................................................................................................................10
Wiring Diagrams...........................................................................................................................................14
Trouble Shooting .........................................................................................................................................16
Unit Check Out..............................................................................................................................................17
Operating Pressures & Temperatures ..................................................................................................18

MODEL NOMENCLATURE

E S
0 4 8 - 1
SERIES:
ES-ENVIROSAVER
AU-AQUARIUS
NOMINAL CAPACITY:
VOLTAGE DESIGNATION:
1 - 208/1/60 & 230/1/60
3 - 208/3/60 & 230/3/60 (SINGLE STEP ONLY)
CABINET CONFIGURATION:
VT - VERTICAL
HZ - HORIZONTAL
CF - COUNTERFLOW
HEAT EXCHANGER MATERIAL:
C - COPPER
N - CUPRO-NICKEL
V T
C - F
L
T
SUPPLY AIR LOCATION:
T - TOP (VT ONLY)
E - END BLOW (HZ ONLY)
B - BOTTOM (CF ONLY)
RETURN AIR LOCATION:
L - LEFT
R - RIGHT
B - BACK
F - FRONT
WATER CONNECTION
LOCATION
F - FRONT

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FHP ES030 Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety Considerations
Mounting Vertical Units
Instructions for mounting vertical units, including vibration isolation and size considerations.
Mounting Horizontal Units
Guidelines for suspending horizontal units, including bracket use and drain pan requirements.
Electrical Connections
Thermostat Wiring
Explains thermostat wiring to the ECM interface board for unit operation control.
UPM Controller and Safety Devices
UPM Controller Features
Outlines the functions and safety features of the Unit Protection Module (UPM) controller.
Unit Status LED Indicators
Describes the meaning of red and green LED indicators for unit status and fault indication.
Single Stage Unit Operation
Heating Mode Sequence
Explains the heating sequence for single-stage units, including auxiliary heat and compressor interaction.
Two Stage Unit Operation
Cooling Mode Sequence
Details the cooling sequence for two-stage units, covering fan and compressor staging.

Table of Contents

Save PDF