Advertisement

SW10 (Full Power) & SW19 (Low Energy)
TUCKER AUTO-MATION
INSTALLATION GUIDE
Surface Mounted Applications
920.1020.15
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SW19 and is the answer not in the manual?

Questions and answers

Summarization of Contents

IMPORTANT SAFETY GUIDELINES
LOW ENERGY APPLICATION NOTE
Specific recommendations for low energy use of SW10/19.
KP EVO CONTROLLER
INSTALLATION AND CONNECTIONS
Steps for physically installing and connecting the KP EVO controller.
DIAGNOSTICS
LED STATUS CHECK
Interpretation of LED indicators on I/O and logic boards.
PUTTING INTO SERVICE
FINAL CHECKS
Verification steps for door forces and object detection.
FINAL OPERATIONS
Completing the installation and handover procedures.
MAINTENANCE
INSERTING / REPLACING THE BATTERY
Steps for battery replacement on the logic board.
REPLACING THE FUSE
Procedure for replacing the I/O board power supply fuse.
INTERCOM SYSTEM
INTERCOM DESCRIPTION
Modes of operation for the intercom network.
CONNECTION AND ADDRESSING
Wiring and assigning unique IDs for network units.

Table of Contents

Save PDF