Thank you for purchasing this Samsung product.
DVM S WATER-GEO
AM✴✴✴MXWA Series
AM✴✴✴KXWA Series

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DVM S WATER-GEO and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety Precautions
Severe Warning Signs
Critical warnings regarding installation hazards and unqualified installers.
Preparing for Installation
Outdoor Unit Classification
Details on different types of outdoor units and their classifications.
Module or Continuous Installation
Double Installation
Specific installation requirements for double unit setups.
Accessories
Optional Accessories
Details on optional accessories required for connecting indoor and outdoor units.
Refrigerant Pipe Installation
Selecting Refrigerant Pipe
Guide to selecting appropriate refrigerant pipe sizes based on capacity.
Size of the Pipe Between the Branch Joint and Indoor Unit
Branch Joint
Details on different types of branch joints and their specifications.
Refrigerant Pipe Installation
Basic Amount of Refrigerant Inside the Outdoor Unit (kg)
Basic refrigerant charge amounts for different outdoor unit models.
Amount of Additional Refrigerant Depends on the Pipe Size (ⓐ)
Calculation method for additional refrigerant based on liquid pipe size.
Refrigerant Pipe Welding and Safety Information
Nitrogen Flushing Welding
Procedure and importance of nitrogen flushing during welding.
Installing the MCU
MCU Specification
Technical specifications for different MCU models.
Installing the Indoor Units
Examples of indoor unit connections to the MCU.
Electrical Wiring Work
Installing Indoor Units
Guide for installing indoor units with MCUs, including Y-connector usage.
Examples of How to Use the Cable Striper
Fixing the Power Cable
Instructions for securely fixing power cables within the unit.
Fixing the Ground Cable
Withdrawing the Power Cable
Steps for withdrawing power cables through the unit's knock-out holes.
Grounding Work
Grounding the Power Cable
Table detailing grounding methods based on voltage and humidity.
Pipe Insulation
Selecting the Refrigerant Pipe Insulator
Criteria for selecting appropriate pipe insulators based on size and humidity.
Insulating Pipes
Insulating Pipes Connected Behind the EEV Kit
Specific insulation guidelines for pipes connected to the EEV kit.
Insulate the Distribution Header
Insulating the Branch Joint
Procedure for insulating branch joints with appropriate materials.
Charging Refrigerant
Single Installation
Procedure for charging refrigerant in a single outdoor unit installation.
Module Installation
Procedure for charging refrigerant in a module installation.
Using Service Valve for Gas
Basic Segment Display
Understanding the segment display for communication and addressing.
Setting Outdoor Unit Option Switch and Key Function
Setting Outdoor Install Option
Step-by-step guide to setting outdoor unit installation options.
Setting Outdoor Unit Key Function
Emergency Operation for Compressor Malfunction
Configuring emergency operation settings for compressor malfunction.
Cooling Capacity Correction
Adjusting cooling capacity based on target evaporation temperature.
Current Restriction Rate
Setting High-Head Condition
Configuring settings for high-head conditions based on height differences.
Energy Saving/Rapid Cooling Setting
Channel Address
Setting channel addresses for product classification.
Water Pipe Installation
Design Condition
Design conditions for water pipe systems, including temperature and water quality.
External Contact Connection
Flow Switch Connection (Mandatory Connection)
Mandatory connection procedures for the flow switch.
Pump Out Connection
Instructions for connecting the pump for pump out operations.
Explanation of Optional Functions
2Way Solenoid Valve
Function and connection of the 2-way solenoid valve for water supply control.
Flow Control
How to connect and configure variable flow control valves.
Things to Check After Completing the Installation
Installation Work
Checks for outdoor and indoor units after installation.
Refrigerant Pipe Work
Verification steps for refrigerant pipe installation and connections.
Drain Pipe Work
Electrical Wiring Work
Verification steps for power, communication cables, and earthing.
Setting Address
Confirmation of indoor and outdoor unit address settings.
Checklist Before Auto Trial Operation
Guaranteed Range of Auto Trial Operation
Temperature conditions for precise auto trial operation judgment.
Inspection and Test Operation
Auto Trial Operation
Detailed steps and precautions for performing auto trial operation.
Automatic Refrigerant Amount Checking Function
Actions to Take After the Detection Result
Actions based on the refrigerant amount detection results (excessive, insufficient).
Precaution Before Trial Operation
Precautions before trial operation, including water quality and flow management.
Maintenance
Recommended Number of Inspection for Normal Operation
Recommended inspection frequency and standards for normal operation.
Cooling Water Management
Operation Range of Water
Guidelines on the operational flow rate range for cooling water.
Ground Heat Exchanger Circulation Water (Anti-freeze) Usage Standard
Standards for using anti-freeze in ground heat exchanger systems.