Electrical Requirements; Safety Notices And Decals - Central Hydraulics 94780 Installation, Operation And Maintenance Manual

10000lbs 2-post lift
Table of Contents

Advertisement

Floor should be level within 3/8 inch over the installation area. No anchors should be installed within 8
inches of any crack, edge, or expansion joint. If these conditions cannot be met, pads can be poured to
accommodate the lift.
Check with local building inspectors and/or permits office for any special instructions or approvals
required for your installation.
Always wear ANSI approved safety goggles when installing and using this product.
E
LECTRICAL REQUIREMENTS
For lift installation and operation for single phase units, it is necessary to have a dedicated circuit with a
25 amp circuit breaker or time delay fuse.
S
AFETY NOTICES AND DECALS
For your safety, and the safety of others, read and understand all of the safety notices and decals
included here.
READ ENTIRE MANUAL BEFORE ASSEMBLING, INSTALLING, OPERATING, OR
SERVICING THIS EQUIPMENT.
PROPER MAINTENANCE AND INSPECTION IS NECESSARY FOR SAFE OPERATION.
DO NOT OPERATE A DAMAGED LIFT.
Safety decals similar to those shown here are found on a properly installed lift. Be sure that all safety
decals have been correctly installed on the Power Unit reservoir. Verify that all authorized operators
know the location of these decals and fully understand their meaning. Replace worn, faded, or damaged
decals promptly.
Failure by purchaser to provide the recommended mounting
surface could result in unsatisfactory lift performance, property
damage, or personal injury.

Advertisement

Table of Contents
loading

Table of Contents