Cisco NCS 5502 Hardware Installation Manual

Cisco NCS 5502 Hardware Installation Manual

Ncs 5500 series fixed-port routers
Table of Contents

Advertisement

Hardware Installation Guide for Cisco NCS 5500 Series Fixed-Port
Routers
First Published: 2017-09-15
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NCS 5502 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Preface
Changes to This Document
Lists the technical changes made to this document since its first release.
Obtaining Documentation and Submitting a Service Request
Information on obtaining documentation, using the Bug Search Tool, and submitting service requests.
NCS 5500 Series Fixed-Port Router Overview
NCS 5500 Series Fixed-Port Routers
Overview of the Cisco NCS 5500 series fixed-port routers, including chassis types and capabilities.
Prepare for Installation
Review Installation Roadmap
Outlines the steps and workflow for installing the Cisco NCS 5500 Series fixed-port chassis and components.
Review Safety Guidelines
Provides essential safety precautions and guidelines to prevent injury and equipment damage during installation.
Review Installation Guidelines
Details site preparation, environmental, and rack mounting requirements for chassis installation.
Procure Tools and Equipment
Lists the necessary tools and equipment required for installing the Cisco NCS 5500 Series chassis.
Prepare Your Location
Illustrates how the building housing the chassis must be properly grounded to the earth ground.
Prepare Yourself
Explains how to prepare yourself, specifically regarding ESD precautions, before handling the chassis.
Prepare Rack for Chassis Installation
Provides instructions on preparing a four-post 19-inch standard rack for chassis installation.
Install the Chassis
Rack-Mount the Chassis on a 4-Post Rack
Step-by-step guide on how to install the NCS 5500 Series chassis into a four-post 19-inch standard rack.
Rack-Mount the Chassis on a 2-Post Rack
Detailed instructions for installing the NCS 5500 Series chassis into a two-post rack.
Install the Air Filter
Procedures for installing air filters on the port side inlet and exhaust of the chassis.
Ground the Chassis
Essential steps and warnings for properly grounding the chassis for safety and compliance.
Connect AC Power to the Chassis
Instructions for connecting AC power to the chassis, including safety precautions and power ratings.
Wiring a DC Power Connector
Guidance on wiring DC power connectors, including breaker ratings and cable sizes.
Connect DC Power to the Chassis
Steps for connecting DC power to the chassis, including fuse panel and connector details.
Connect Router to the Network
Guidelines for Connecting Ports
Best practices for connecting ports using QSFP+, QSFP28, SFP, SFP+, and RJ-45 connectors for network connectivity.
Connect to the Console Port
Procedure for connecting a data terminal to the console port for initial router configuration and management.
Connect to the Management Ethernet Port
Steps to connect to the management Ethernet port for out-of-band management via CLI.
Creating the Initial Router Configuration
Guide on powering up the router and performing the initial configuration, including setting username and password.
Installing and Removing Transceiver Modules
Detailed instructions for installing and removing SFP, SFP+, QSFP+, and QSFP28 transceiver modules.
Connecting Interface Ports
General guidance on connecting optical interface ports on line cards for network connectivity.
Maintaining Transceivers and Optical Cables
Maintenance guidelines for transceivers and optical cables, focusing on cleaning and ESD prevention.
Verify Chassis Installation
show inventory
Command to display field replaceable unit (FRU) information, including product IDs and serial numbers.
show environment
Command to display comprehensive environment-related information for the router.
show environment temperature
Command to display temperature readings and thresholds for system sensors.
System Specifications
Environmental and Physical Specifications
Detailed environmental ranges and physical dimensions for NCS 5501 and NCS 55A1 series routers.
Clearance Requirements
Specifies the required front and rear clearances for air intake/exhaust and module installation.
Weight, Quantity and Power Consumption
Provides weight, quantity, and power consumption details for NCS 5501, NCS 55A1, and NCS 5502 series.
Airflow Direction
Explains the importance of airflow direction and positioning for proper cooling in the data center.
Transceivers, Connectors, and Cables
Information on supported transceivers, connectors, and cables for the NCS 5500 series.
RJ-45 Connectors
Details on RJ-45 connectors and their use for connecting network cables to the router.
Replace Modules, Fan Trays, and Power Supplies
Replace NCS 55A1-24H, NCS 55A1-36H-S, NCS 5501 and NCS 5501-SE Fan Modules
Procedure for replacing fan modules in specified NCS 5500 series fixed-port routers.
Replace NCS 5502 and NCS 5502 SE Fans
Instructions for replacing fan modules in NCS 5502 and NCS 5502 SE models.
Replace Power Supply
Steps to replace AC and DC power supply units in various NCS 5500 series chassis.
LEDs
Chassis LEDs
Descriptions of Attention, Status, Alarm, and Sync LEDs on the front of various NCS 5500 chassis.
Fan Tray LED
Information on the Status LED for fan tray modules in NCS 5500 series routers.
Power Supply LEDs
Explanation of the OK/FAIL or Status LEDs for power supply modules in NCS 5500 series routers.