Daikin RXLS25M2V1B Installation Manual

Daikin RXLS25M2V1B Installation Manual

Outdoor unit

Advertisement

MODEL
RXL25M2V1B
RXL35M2V1B
RXL25M3V1B
RXL35M3V1B
RXLG25M2V1B
RXLG35M2V1B

OUTDOOR UNIT

INSTALLATION MANUAL

RXLS25M2V1B
RXLS35M2V1B
ARXL25M2V1B
ARXL35M2V1B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RXLS25M2V1B and is the answer not in the manual?

Questions and answers

Summarization of Contents

Outdoor Unit Installation Procedures
Outdoor Unit Mounting
Guidance on correctly installing the outdoor unit, referring to location precautions and drawings.
Pipe Flaring Procedure
Step-by-step guide for preparing pipe ends for refrigerant connections, including flaring.
Refrigerant Pipe Connections
Instructions on applying oil and tightening flare nuts for refrigerant pipe connections.
System Air Purging and Leak Check
Procedure for removing air from the system and checking for refrigerant leaks.
Refrigerant Refill Procedure
Procedure for adding refrigerant, including precautions for R410A.
Refrigerant Piping Handling and Insulation
Handling of pipes and selection of insulation materials for refrigerant piping.
Refrigerant Pump Down Procedure
Pump Down via Indoor Unit Button
Steps to initiate pump down using the indoor unit's physical button.
Pump Down via Remote Controller
Steps to initiate pump down using the remote controller for forced cooling operation.
Post-Installation Checks and Testing
Trial Operation and System Testing
Procedures for conducting trial operation and testing the system after installation.
Installation and Functionality Checklist
Checklist for verifying proper installation and system functionality.

Table of Contents