Advertisement

HUMIDIFIER
HU-25/45/85/245
USER MANUAL
01-03-2016 version 1.7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HU-45 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Introduction to Ultrasonic Humidification
Principle of Ultrasonic Air Humidification
Explains how minute water droplets are ejected by high-frequency vibrations for humidification.
Continuously-Variable Air Humidity Control
Details the CVH system for regulating humidity and external control options.
Humidifier Capacity and Modular Expansion
Discusses the unlimited modular expansion and quick evaporation of fine water droplets.
Water Quality Recommendations
Recommends demineralised water for minimum maintenance and extended transducer life.
Disinfection Options
Mentions the option to connect an ozone generator for bacterial purity in food industry.
Electrical Connections and Control
Supply Voltage and Connections
Details the 230V mains connection and parallel connection to external ventilators.
Sensor Connection Procedure
Explains mounting the sensor and connecting the DIN plug for measuring.
External Control Voltage Setup
Covers using 0-10 Volt external control via HK-01 cable and essential signal requirements.
Water Connections and Flushing Cycle
Water Supply Requirements
Specifies water pressure (1-6 bar), demineralised water, and float/solenoid valve control.
Water Discharge Configuration
Details the discharge hose connection, outlet requirements, and importance of an unblocked channel.
Flushing Cycle Settings
Explains the standard hourly flushing cycle and modification options.
Air Connections
Air Supply Requirements
Ensures a clean air supply without water droplets and free from obstructions.
Air Outlet Configuration
Details the 75 cm pipe for larger droplets, sloping towards the humidifier, and pipe restrictions.
Switching On and Functional Test
Initial Switching On Checklist
Checks for correct positioning, connections, voltage, and water lines before powering on.
Start-up and Functional Test Procedure
Step-by-step guide for testing water flow, mist production, and draining.
Overheating Warning and Causes
Explains automatic shut-off on overheating and lists common causes like blocked inlets/outlets.
Maintenance
Pre-Maintenance Checks
Ensures disconnection from power, water supply closure, and removal of sensor plug.
Cleaning Instructions
Details cleaning the reservoir, filter, and water discharge with appropriate solutions.

Table of Contents