Download Print this page
HP ML110 - ProLiant G5 2TB Storage Server NAS Installation Instructions

HP ML110 - ProLiant G5 2TB Storage Server NAS Installation Instructions

Hp rack rail kit installation instructions (464164-001, february 2008)
Hide thumbs Also See for ML110 - ProLiant G5 2TB Storage Server NAS:

Advertisement

Quick Links

HP Rack Rail Kit installation
instructions
© Copyright 1999, 2008 Hewlett-Packard Development Company,
L.P.
First edition: February 2008
The information in this document is subject to change without notice.
www.hp.com
*464164-001*
Overview
This document contains instructions for installing HP rack rails into square
and round hole racks for HP 1U and 2U servers.
NOTE:
For more information on preparing the server for installation,
see the user guide that ships with the server.

Kit contents

Two rack rails (left and right)
Mounting hardware for square and round hole racks
Two tie wraps
NOTE:
If mounting the server into threaded hole or telco racks, please
see
www.racksolutions.com
Important safety information
See the Important Safety Information document included with the server.
CAUTION:
Electrostatic discharge (ESD) can damage electronic
components. Be sure you are properly grounded (earthed)
before beginning any installation procedure.

Installation guidelines

This installation is to be performed by qualified individuals who have
knowledge of the procedures, precautions, and hazards associated with
equipment containing hazardous electrical circuits.
WARNING!
These rails, when installed, form only a shelf for the server to
rest on. The server is not attached to the rail by any other means.
Use extreme caution when pulling the server out from the rack;
it can slip and fall, causing damage to the server or injury. HP
is not responsible for any damage or injury caused by the
mishandling of the server.
Page 1
to purchase mounting hardware.

Advertisement

loading

Summary of Contents for HP ML110 - ProLiant G5 2TB Storage Server NAS

  • Page 1: Kit Contents

    If mounting the server into threaded hole or telco racks, please www.racksolutions.com to purchase mounting hardware. Important safety information See the Important Safety Information document included with the server. © Copyright 1999, 2008 Hewlett-Packard Development Company, CAUTION: L.P. Electrostatic discharge (ESD) can damage electronic First edition: February 2008 components.
  • Page 2 WARNING! NOTE: Ensure that the rack is level and stable before working on the If installing rails into a square hole rack, use rack. Be sure the leveling jacks (feet) extend to the floor and larger-sized shoulder screws and pins for mounting. that the full weight of the rack rests firmly on the floor.
  • Page 3 Figure 2 Insert the 1U server into the rack Figure 5 Secure the 1U server to the rack Figure 3 Insert the 2U server into the rack Figure 6 Secure the 2U server to the rack Using the holes provided in the rear rack rails, install tie wraps and route external cable as required (Figure 7).

This manual is also suitable for:

Ml110 g5 2tb