Page 1
MOLNAR TWO-POST HOIST MF 1705-85A/3T 0124 MANUF ACTURED MOLNAR ENGINEERING PTY . LTD. A.B.N. 16-20 Coglin Street, Brompton, S.A. 5007 AUSTRALIA INSTALLATION, OPERATION 1-11 W ood A venue, Brompton, S.A. 5007 AUSTRALIA T elephone: (08) 8346 6893, (08) 8346 6894,...
Page 2
Purchaser latest standards AS/NZS 3000, installations outside Australia & Zealand refer local 1705-85A/3T Model standards/regulations. Serial Circuit Breakers should “D” curve type (motor start, high inrush current) Ratings given maximum Date circuit &...
INSTALLATION REQUIREMENTS INST ALLER MUST CHECK FOLLOWING LIST WHEN INST ALLING person should permitted operate MOLNAR TWO-POST HOIST MOLNAR TWO-POST HOIST without first studying operating instructions page suitable floor where hoist bolted down must have level safety precautions page sur face to ensure the hoist base frames lie flat. When the hoist is bolted down...
DOOR PROTECTOR INSTALLATION PROCEDURE INSTALLATION PROCEDURE MF 1705-85A/3T Place door protector into position as shown in above drawing. Make sure the door protector ends flush with edge. Push protector bend, until holes bracket carriage line MF 1705-85A/3T complies fully with...
Safe, strong, simply built to give years of trouble-free service. The MOLNAR TWO-POST HOIST embodies many features that makes it the most up-to-date equipment for quicker and more profitable service. SAFE EFFICIENT OPERA TION electro...
Page 7
INSTALLATION INSTRUCTION INTRODUCTION Position hoist installation position. SPEEDIER SERVICE Remove wooden box. With MOLNAR TWO-POST HOIST maximum accessibility assured. straps holding posts together . cumbersome beams or cross-sections impede the operator in any way, giving the Undo packing legs securing bolts side).
FLOOR REQUIREMENTS FOR HOIST BASE HYDRAULIC CIRCUIT DIAGRAM correct installation Hoist floor must flat level. level tolerance between post of 10mm is allowable. Check with straight edge and spirit level. situationss where floor soft reinforced concrete slab, 3850 2200 120mm should be laid (Cement 1, Sand 3, Metal 6). If the floor is solid but not quite level, compensated with...
WIRING DIAGRAM OPERATING INSTRUCTIONS Drive centred. Place four pads under edge fore jack points. Press starter button raise required height. under until load rests safety. When reaches maximum height limit switch will come into operation stop hoist. When hoist stopped, pull release lever...
MAINTENANCE FAULT CHART CHECK DAIL Y Check safety mechanism that functions properly. F AULT PROBABLE CAUSE REMEDY CHECK MONTHL Y Leakage of oil at joints. Loose joints in the high pressure Inspect the piping and tighten pipes. joints. Safety mechanism operation.
LUBRICATION PROCEDURES FOR MOLNAR 2 POST HOISTS turn mains power while hoist operating. Hoist Owner’s responsibility Duty Care maintain Hoist Maintenance Schedule Hoist Owner’s...
REPLACEMENT PARTS LIST HYDRAULIC CYLINDER REPLACEMENT 85A-AA Basemember floor plate assembly Procedure 85A-A-218 Floorplate Disconnect power . 85A-BB Right hand post assembly 85A-B-14 Cover 85A-B-16 Base plate anchoring bolt Lower carrier . 85A-B-81 T op plate 85A-B-83 Large power unit carrier bracket Remove...
Page 13
ACCESSORIES AVAILABLE FROM MOLNAR ENGINEERING REPLACEMENT PARTS LIST 85A-H-94 Limit Switch 85A-H-153 Junction 85A-H-155 Saddles Optional 85A-H-157 Starter EP02 Elevated Extension Pads enables 85A-JJ Lifting assembly easy pickup vans 85A-J-49 Locking pivot 4-wheel drives. 85A-J-50 Lifting ar m pivot Optional...
Need help?
Do you have a question about the 1705-85A/3T and is the answer not in the manual?
Questions and answers