Page 1
HANGING BRACKET Installation manual SF-32WF-HB SF-43WF-HB SF-49WF-HB SF-55WF-HB SF-65WF-HB SF-75WF-HB SF-86WF-HB Before installation and use, please read this manual carefully to ensure proper use. recommended keep this manual for future use. The pictures in this manual are for reference only.
- Drill the M8 expansion screw holes according to the corresponding expansion screw hole. Size of the center distance between expansion screw holes for SF-32WF-HB Size of the center distance between expansion screw holes for SF-43WF-HB Size of the center distance...
Page 3
Installation Steps Step 2: Install the square frame and power cable. - Insert the power cable into the bore and slide it to the end. - Install and fix the square frame to the monitor with M6 screws. Step 3: Install base beams. - Insert the power cable into the beam base through the square tube.
Page 4
Installation Steps - Route the power cable through the bore and connected to the quick connector. - Fix the top cover to the square with M6 screws. Step 5: Install the monitor. - Secure the monitor with M8 expansion screws and nuts Into the hole in the ceiling.
Page 5
Installation Steps Step 6: Install hanger cover box. - Secure the cover box with M3 screws.
Need help?
Do you have a question about the SF-32WF-HB and is the answer not in the manual?
Questions and answers