Smarten Your Energy Copyright Statement This manual is under the copy right of Alpha ESS Co., Ltd., with all rights reserved. Please keep the manual properly and operate in strict accordance with all safety and operating instructions in this manual. Please do not operate the system without reading through the manual.
1.1 System Introduction Storion OF5 is an energy storage system specifically developed for off-grid applications by AlphaESS. Storion OF5 is designed to be applied in DC coupling system with connection port available for generator as backup power source. Figure 1. Storage OF5 connection diagram 1.2 General Precautions...
•Failure to follow any/all of the user manual, the installation guide and the maintenance regulations; •Improper use or misuse of the device; •Insufficient ventilation of the device; • The maintenance procedures relating to the product have not been followed to an Alpha ESS Co., Ltd.
Page 10
Take out the holder from the cabinet and assemble the holder to the Step3: inverter. Figure 13. Assemble the holder to the cabinet Assemble the holder in the cabinet and the holder to the cabinet. Step4: screw Alpha ESS Co., Ltd.
Connect theOUTPUT, GEN(if have),Battery,and MC4 PV plugs. Step5: Notice:Storion OF5 is a off grid system, so GRID INPUT can not be connect. Figure 15. Screw the front panel back on Connect all the cable plugs from the cable box and Step6:...
Plug it into the ethernet port at the backside of the system. Note: OF5 system do not connect the meter. 3. Switch on the System Switch on System shall be turned on in the correct sequence to avoid any damage. Alpha ESS Co., Ltd.
Page 13
Step 1 Turn off all the battery modules and restart them; Step 2 Open the front door and remove the front panel; Caution, do not touch any metal parts of the inverter to avoid potential electrical shock. Alpha ESS Co., Ltd.
(2) shows already system on or off. Please make sure solved errors and warnings. The error your system is connecting the information can be saved by pressing the internet. button „Save in the USB or SD card. Alpha ESS Co., Ltd.
Page 15
When the EMS start first, you will set up the basic configuration and system. Click the info button to set up the basic configuration. Step1: Press “Country” to set the Step2: Press “Language” to set the country of the installation site. language. Alpha ESS Co., Ltd.
If you select Static IP, please make sure the following information is filled: IP address, subnet Mask, Gateway, DNS address. Step5: Click "License" to set the license. 4.3 System set up Step1: Press “System” and input the password to enter the system display. Alpha ESS Co., Ltd.
Generator Output Power: if you need this model, generator for the load first. 5. Online Monitoring Before you have access to the online monitoring data, you must obtain an account from your installer. More detailed information can be obtained in Online Monitoring Webserver installation Manual. Alpha ESS Co., Ltd.
Need help?
Do you have a question about the Storion OF5 and is the answer not in the manual?
Questions and answers