Metered cc valve residential water conditioner (29 pages)
Summary of Contents for MARLO GT 60M
Page 1
MGT 60M – 600M SYSTEM 14 – DEMAND 2” NXT2 SERIES Standard Photograph Equipment appearance may differ. Twin system shown with skid mount option. COMMERCIAL WATER CONDITIONER INSTALLATION, OPERATION, AND MAINTENANCE MANUAL COMPLETE FOR FUTURE REFERENCE: MODEL NO: SERIAL NO: DATE INSTALLED: DEALER: 8-635 R1...
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND AFTER PRIOR TO Inspection Requirement Media Loading Media Loading Prior to Loading Media 1. Inspect condition of upper distributor piping. Verify fittings are tight and positioned as shown. 2. Inspect condition of strainers, laterals and hub through top or side access ports.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND TABLE OF CONTENTS SYSTEM INFORMATION Product Warranty ................................1 General Arrangement Drawings ............................2 Dimension Chart ................................6 Specification Chart ...............................7 INSTALLATION General Information ...............................8 Loading Softener ................................9 Mounting Control Valve ..............................9 Brine Tank Installation ..............................10 Mounting Water Meter ..............................
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND SYSTEM INFORMATION COMMERCIAL AND INDUSTRIAL PRODUCT WARRANTY Manufacturer warrants all commercial and industrial water treatment products manufactured and/or distributed by it to be free from defects in materials and workmanship for a period of one (1) year after installation or eighteen (18) months from the date of shipment, whichever comes first.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND INSTALLATION INSTALLATION INSTRUCTIONS WATER SOFTENERS GENERAL INFORMATION 1. Operating pressure range is 30-100 psi. If pressures over 100 psi are encountered, a regulator must be installed. NOTE: The control valve will not operate correctly if feeding into an atmospheric tank. A pressure control device must be added to the outlet to maintain the minimum pressure.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND INSTALLATION LOAD SOFTENER TANK IMPORTANT: Be sure to visually inspect the lower laterals prior to loading the media. Check to make sure each lateral is firmly threaded into the hub. 1. Fill a tank approximately 1/3 full of water using a hose, bucket, etc. Plug the PVC distributor manifold pipe using a plastic cap, cork, rag, etc.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND INSTALLATION BRINE TANK INSTALLATION The brine tank should be installed on a smooth level surface. If none is available, the tank should be placed on a smooth piece of exterior plywood and leveled by placing shims underneath the plywood. Make sure that the salt shelf inside the tank is level and that the brine well is near to vertical as possible.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND INSTALLATION MOUNTING WATER METER ASSEMBLY (IF UNIT IS NOT SKID MOUNTED) 1. Locate the meter. The meter may or many not have the cable attached. If not, locate the cable as well. 2. For twin/triple parallel/progressive systems, the meter must be installed in the common outlet of the softeners. Refer to the General Arrangement drawing on page two (2).
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND INSTALLATION POWER SUPPLY INSTALLATION NOTE: POWER SUPPLY INCLUDES A HARNESS WITH 2 BLACK WIRES THAT CONNECT TO THE CIRCUIT BOARD. 1. Insert black and black transformer wires into 24VDC input of control. 2510/2750/2815/2850/2900 Valves: Communication Cables Hinge Mount: mount per valve model noted Wire Harness...
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION TIMER DISPLAY FEATURES System Network Status Master Valve Flow Time Number Indicator State Indicator LEDs Indicator of Day Display Screen Blue LED Alternates between On - Unit in Service Date, Flow Rate, and Blinking - Regeneration Queued Volume Remaining (If a regeneration is...
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION SYSTEM OPERATION System 14 (2-8 Units) Demand Recall Meter input is required on each tank. Unit #1 will begin In Service with #2, #3, and #4 (if installed) will begin in Stand- by.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION SYSTEM OPERATION IN SERVICE • The system operates as part of a multi-valve regeneration system. • Each valve in the system will have an active flow meter input, even in stand by. •...
Page 19
FLOW IN A FOUR-UNIT SYTEM MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND (SYSTEM 14-DEMAND RECALL) OPERATION Steady Flow: FLOW IN A FOUR-UNIT SYSTEM (SYSTEM 14 DEMAND RECALL) In Service In Service Standby Standby Volume Volume Remaining = 0 Remaining = 0 Flow Stays Steady: Regeneration Standby...
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION TIMER OPERATION SETTING THE TIME OF DAY NOTE: Set Time of Day on any unit and the rest of the units in the system will update the Time of Day automatically. 1. Press and hold the Up button for 2 seconds. The “Time” value is displayed. Press the Up or Down buttons to adjust as desired. 2.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION START-UP PROCEDURES Again, make sure all plumbing is complete and tight, including drain line and brine line. Make sure all electrical components, including the communication cables (multi tank systems only) are properly installed and connected. 1.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION USER MODE PROGRAMMING FLOW CHART 1. To navigate, press the Extra Cycle button to advance to the next value. Press the Left button to retreat to the previous value. 2. Where applicable, use the Up and Down buttons to adjust a value as desired. 3.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION BATCH SIZE CALCULATION Batch size is the term used for the amount of water being softened by the water softener between regenerations. The NXT2 controller calculates this value automatically based on the values in the program. This is a simple calculation provided two pieces of information are known: Capacity of the water softener in grains (gr.) (i.e.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION DIAGNOSTIC MODE FLOW CHART Entering Diagnostic Mode: 1. Press and hold the Left button to enter Diagnostic Programming mode. Example: 2. To navigate, press the Extra Cycle button to advance to the next ERROR LOG ERROR LOG EMPTY Record of error events chronologically.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION MASTER PROGRAMMING MODE FLOW CHART NOTE: Depending on current option settings, some displays cannot be viewed or set. Master Programming Mode: 1. Press and hold the Left and Down buttons simultaneously for 3 seconds to enter Master Programming mode.
Page 26
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION MASTER PROGRAMMING MODE FLOW CHART Example: LOCK WINDOW #1 Start Lock Window End Lock Window BACKWASH Example: 10 M Range: 0 - 240 M DRAW Example: 60 M Range: 0 - 240 M RAPID RINSE Example: 10 M...
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION SERVICE POSITION BRINE VALVE FLOW CONTROL DRAIN DRAIN INLET BRINE OUTLET LEVEL RESIN BRINE TANK TANK Hard water enters unit at valve inlet and flows down thru the mineral in the mineral tank. Conditioned water enters center tube thru the bottom distributor —...
Page 29
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION BACKWASH POSITION BRINE VALVE FLOW CONTROL DRAIN INLET OUTLET BRINE LEVEL RESIN BRINE TANK TANK Hard water enters unit at valve inlet — flows to the front passage and up through the front passage to regenerating valve —...
Page 30
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION BRINE POSITION BRINE VALVE FLOW CONTROL INLET OUTLET BRINE LEVEL RESIN BRINE TANK TANK Hard water enters unit at valve inlet — flows up into injector housing and down thru nozzle and orifice to draw brine from the brine tank —...
Page 31
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION SLOW RINSE POSITION BRINE VALVE FLOW CONTROL DRAIN INLET OUTLET BRINE LEVEL BRINE RESIN TANK TANK Hard water enters unit at valve inlet — flows up into injector housing and down thru nozzle and orifice — around the piston —...
Page 32
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION RAPID RINSE POSITION BRINE VALVE FLOW CONTROL DRAIN INLET OUTLET BRINE LEVEL BRINE RESIN TANK TANK Hard water flows thru the regenerating valve directly down thru the mineral into the bottom distributor and up thru the center tube —...
Page 33
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND OPERATION BRINE TANK FILL POSITION BRINE VALVE FLOW CONTROL DRAIN INLET INLET OUTLET BRINE LEVEL BRINE RESIN TANK TANK Hard water flows thru the service valve and down thru the mineral. Conditioned water enters the bottom distributor — flows up the center tube around the piston to the outlet.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE NXT2 WIRING DIAGRAM FLOW METER (FM) WIRING GROUND ( - ) POWER ( + ) SIGNAL FLECK BLACK GREEN SIGNET SHIELD BLACK CLACK BLACK WHITE AUTOTROL CLEAR BLACK...
MGT 60M–600M NXT 2” METERED MAINTENANCE MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE 2” Plastic Paddle Meter 2” PLASTIC PADDLE METER Item No. Quantity Part No. Description 1 ....1 ....17689 ....Body, Meter, 2” Plastic w/Impeller Shaft Seat 2 ....
Page 44
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE 2” STAINLESS STEEL METER ASSEMBLY Item No. Part No. Description Item No. Part No. Description 1....1 ..62048-01 ....Service Kit, 2 inch Meter, 4....1 ..19791 ....Meter Cable Assembly, Standard Range ..19791-02 ....Meter Cable Assembly, 1 ..
Page 45
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE 2536 SIGNET FLOW SENSOR Galvanized Iron Threaded Tee with NPT Threads PVDF Insert Iron Strap-on Saddle with PVDF Insert K-FACTOR TABLE - SIGNET 2536 (Pulses per Gallon) GENERIC FLOW METER SETTINGS PIPE SIZE SADDLE (inches)
Page 46
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE AUTOTROL 2” TURBINE METER K-FACTOR TABLE AUTO TURBINE METER (Pulses per Gallon) METER SIZE K-FACTOR ITEM NUMBER PART NUMBER DESCRIPTION A2100019 2” Meter With Stainless Steel Adapter A2100004 2” Meter With Pvc Adapter A2100005 2”...
Page 47
The V3118-03 has a groove to line up with the V3501 WS1.5/2 Turbine Clip. K-FACTOR TABLE - CLACK METER (Pulses per Gallon) METER SIZE K-FACTOR 1-1/2 ITEM NUMBER MARLO DESCRIPTION QUANTITY CLACK PART NUMBER PART NUMBER A2360061 WS Remote Meter Asy 15 Ft Cord (includes V3118-03, V3501 and V3105)
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE BRINE SYSTEM - MGT 60M-90M TUBING KIT Item Part Description Number Number Brine Tank 18”x40” Black Molded Cover - MGT 60 - 90M A2042028 Brine Valve Assembly 474 w/ Aircheck - MGT 60M - 90M B1179005 5”...
Page 49
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE BRINE SYSTEM - MGT 120M-300M Item Description Part Number Number Brine Tank 24” x 41” w/ Holes - MGT 120M B1002039 Brine Tank 24”x50” w/ Holes - MGT 150M-300M B1002016 24” Diameter 5BW Plastic Grid Plate A2284007 Brine Valve (474) for MGT 120 B1180014...
Page 50
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE BRINE SYSTEM - 450M Item Description Part Number Number Brine Tank 30” x 50” w/ Holes - MGT 450M B1002041 5” x 48” Drilled Brine Well B1015005 Brine Valve Assembly 16-1/4” x 24” B1042007 5”...
Page 51
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE BRINE SYSTEM - MGT 600M 4&5 Item Description Part Number Number Tank Brine 39 X 60 Black Mld Cvr B1002010 Brine Valve Assy 10-1/4 X 30 B1042006 Grid Support Set 39 Dia 22” A2800039 Salt Screen 39 Dia.
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE TROUBLESHOOTING DETECTED ERRORS NOTE: It can take up to 30 seconds for an error to be detected and displayed. All errors on each timer in the system must be displayed before the errors can be corrected. If a communication error is detected, an Error Screen will appear.
Page 54
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE TROUBLESHOOTING 2900 VALVE PROBLEM CAUSE CORRECTION Softener Fails To Regenerate. A. Electrical Service To Unit Has A. Assure Permanent Electrical Ser- Been Interrupted. vice (Check Fuse, Plug, Pull Chain or Switch). B. Timer Is Defective. B.
Page 55
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND MAINTENANCE TROUBLESHOOTING 2900 VALVE (CONTINUED) PROBLEM CAUSE CORRECTION 7. Excessive Water In Brine Tank. A. Plugged Drain Line Flow Control. A. Clean Flow Control. B. Plugged Injector System. B. Clean Injector and Screen. C.
Need help?
Do you have a question about the GT 60M and is the answer not in the manual?
Questions and answers