Parts section drop-down. If you have questions, please feel free to call or email us. You can visit us on-line at www.ashlandind.com. Ashland Industries hours of operation are 8:00 a.m. to 5:00 p.m. CST. We can be reached toll free at: 877-634-4622.
Bowl Item Part Number Description 600875 Pin: 2-1/2“ x 10-1/4” w/ Square Head 400057 Bushing: Spring 2-1/2" x 3" AFN-00033 Nut: 2"-12 Nylon Insert Jam 502202 Washer: 2" x 3-5/8" x 3/16" 501894 Pin: 1-3/4" x 6-1/4" AFB-00002 HHCS: 5/8"-11 x 4" AFN-00050 Nut: 5/8"-11 502661...
Apron Item Part Number Description 600604 Arm: Apron Link 501895 Pin: 2-1/2" x 14" AFB-00046 HHCS: 5/8"-11 x 5" AFN-00050 Nut: 5/8"-11 502197 Pin: 2-1/2" x 10" 400175 Bushing: Spring 2-1/2" x 3" PH: 715-682-4622 www.ashlandind.com...
Page 9
Apron Pivot Item Part Number Description 600850 Pin: 2-1/2" x 12” w/ Round Head A125159-35 Bushing: 2-1/2" ID Spherical 502202 Washer: 2" x 3-5/8" x 3/16" AFN-00033 Nut: 2"-12 Nylon Insert Jam AFB-00027 HHCS: 3/8"-16 x 1-1/2" AFW-00010 Washer: 3/8" 502369 Tab: 1-1/2”...
Front Section Item Part Number Description 501894 Pin: 1-3/4" x 6-1/4" AFB-00002 HHCS: 5/8"-11 x 4" 502369 Tab: 1-1/2” x 4” Apron Pin Keeper 400058 Bushing: Spring 2-1/2" x 3" w/ Grease Hole 502353 Pin: 2-1/2" x 7" AFB-00046 HHCS: 5/8"-11 x 5" AFN-00050 Nut: 5/8"-11 600875...
Page 11
Front Section Guards Item Part Number Description 502569/502570 Guard: Front Left/Front Right (6 Bolts Required) 502561 Guard: Left/Right Front Cap (4 Bolts Required) 502606/502607 Guard: Trailing Arm Left Side/Right Side (11 Bolts Required) 503809/503810 Guard: Left/Right Arm Side Cap (4 Bolts Required) 502597 Guard: Rubber Wiper 502596...
Page 16
Apron/Lift Cylinder – 400258 Item Part Number Description 201910P Barrel: for 6-1/2" x 15-7/8" Cylinder 301580P Rod: 2-1/2", Nitro Bar A125159-35 Bushing: 2-1/2" ID Spherical 500870P Head: Ass'y 6-1/2" x 2-1/2" IT 400714P Piston: Ass'y 6-1/2" x 2-3/8"-12 UN CT Seal Kit 432067P Kit: Seal for 400258 PH: 715-682-4622...
Page 17
Apron Cylinder Pins Item Part Number Description 400258 Cylinder: 6-1/2" x 15-7/8" x 2-1/2" 501895 Pin: 2-1/2" x 14" AFB-00046 HHCS: 5/8"-11 x 5" AFN-00050 Nut: 5/8"-11 502197 Pin: 2-1/2" x 10" PH: 715-682-4622 www.ashlandind.com...
Lift Cylinder Pins Item Part Number Description 400258 Cylinder: 6-1/2" x 15-7/8" x 2-1/2" 502353 Pin: 2-1/2" x 7" AFB-00046 HHCS: 5/8"-11 x 5" AFN-00050 Nut: 5/8"-11 PH: 715-682-4622 www.ashlandind.com...
Page 19
Dump Cylinder – 400228 Item Part Number Description 201876P Barrel: for 3-1/2" x 31-7/8" Cylinder 301544P Rod: 2.00", Nitro Bar A125454-35 Bushing: 1-3/4" ID Spherical 500854P Head: Ass'y 3-1/2" x 2" IT 400698P Piston: Ass'y 3-1/2" x 1-1/8" CT Seal Kit 432022P Kit: Seal for 400228 PH: 715-682-4622 www.ashlandind.com...
Dump Cylinder Pins Item Part Number Description 400228 Cylinder: 3-1/2" x 31-7/8" x 2" 501894 Pin: 1-3/4" x 6-1/4" AFB-00002 HHCS: 5/8"-11 x 4" AFN-00050 Nut: 5/8"-11 PH: 715-682-4622 www.ashlandind.com...
Operation & Maintenance Your Ashland scraper is a durable piece of equipment and with proper care will yield many years of trouble-free operation. However, the life of your scraper can be severely shortened by poor maintenance. You must follow consistent maintenance practices and use superior quality grease and hydraulic oil (compatible with the power unit’s hydraulic system) to...
Page 30
Operation & Maintenance Scraper damage can occur if: 1. The scraper is running over the haul road with the bowl fully raised. On scrapers that have factory installed nitrogen over hydraulic accumulators, the lift cylinders should be lowered 3 to 4 inches to allow the cushioned ride to work properly. 2.
Page 31
Operation & Maintenance Transport the scraper safely: 1. Always empty the scraper. 2. Clean all material from the exterior of the scraper. 3. Make sure all road rules are followed. 4. Use proper lighting and flagging. 5. Lower scraper bowl to provide just enough clearance over obstacles. 6.
Safety Guidelines Safety Signal Words: Please note the use of signal words such as DANGER, WARNING, and CAUTION paired with the safety messages on your scraper. The appropriate signal word for each safety message has been selected using the following guidelines: •...
175XL2 20.5-25 16Ply 29.5-25 28Ply 175XL2 (Big Tire) 23.5-25 20Ply 29.5-25 28Ply 2012CS 20.5-25 20Ply 2014CS 20.5-25 20Ply 215TS2 29.5-25 28Ply 220TS4 20.5-25 20Ply On new machines, wheel hardware must be retorqued after the first 2 hours of operation. Check tires daily to ensure correct inflation levels with an accurate gauge having 6.9 kPa [(0.07 bar) 1 PSI] gradations.
Tire Service The task of servicing tires and wheels can be extremely dangerous and should be performed by trained personnel only, using the correct tools and following best- practice. Do not attempt to mount, demount, or inflate a tire if you do not have the proper equipment and experience to perform the job.
The bearings within the hubs of the scraper are fully greased with a Mobilith SHC™ 460 grease at the factory. Ashland uses a special bearing grease packer to ensure the bearing is effectively and evenly lubricated. Generous amounts of additional grease are added on both sides of the bearing prior to install within the hub.
Page 36
Pass-Thru Hub Assembly 1. Lubricate bearing cones (item 7, x2). 2. Install (1) bearing cones onto axle. 3. Install new O-rings (item 3, x2) onto axle. 4. Install bearing spacer against lubricated bearing. 5. Install (1) lock washer against bearing spacer with internal tab positioned in keyway of axle.
Page 37
Pass-Thru Hub Disassembly Disengage lock tab on “pre-load” side of axle lock washer (item 2). Remove axle locknut (item 1) and lock washer (item 2). Remove seal retaining rings (item 5, x2). Remove hub seals (item 6, x4). Remove axle (item 8) out “fixed” end of hub. Remove bearing spacers (item 3, x2).
Troubleshooting With proper care and maintenance, your Ashland Scraper will give many years of reliable service. When a situation arises where the earthmover performance is not satisfactory, this section will give some pointers on finding and correcting the problem. Grease zerk will not take grease: Grease zerk plugged.
This warranty is applicable only for the normal service life expectancy of the product or components, not to exceed one year from the date of delivery of the new Ashland Industries product to the original purchaser, or the date the product is first put into service via a rental agreement or other means, whichever occurs first.
Page 40
• Warranty Labor Reimbursement for labor expense to the dealer is made by payment of the established hourly shop rate. • Repair times will be reviewed by Ashland Industries and may be adjusted to average repair time required by other dealers to make similar repairs. Labor is not paid on the warranty associated with repair parts purchased by the retail customer that are used on a product that is not currently in warranty time frame.
30 day period. In these cases, the dealer must notify Ashland Industries in writing of the extenuating circumstance and advise that the continued use of the product will not enlarge the warranty claim.
30 days from the date of failure to Ashland Industries, Inc. routed through the dealer and distributor from whom the purchase was made, transportation charges prepaid.
Need help?
Do you have a question about the 2014CS and is the answer not in the manual?
Questions and answers