Advertisement

Display Panel
BAT 100 LSN
en
Operation Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BAT 100 LSN and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Bosch BAT 100 LSN

  • Page 1 Display Panel BAT 100 LSN Operation Guide...
  • Page 3: Table Of Contents

    Display Panel Table of Contents | en Table of contents Safety Short information System overview Installation Connection Maintenance Technical data Bosch Sicherheitssysteme GmbH Operation Guide 2015.12 | 6.0 | 4.998.148.492...
  • Page 4: Safety

    The BAT 100 LSN Display Panel handles the display of faults and/or alarms for detectors or detector zones. Up to three ATG 420 LSNi can be installed in the BAT 100 LSN housing. An ATG 420 LSNi has 32 indicator points supporting three colors (red, green, yellow) and three states (off, continuously on, flashing).
  • Page 5: System Overview

    FPA-1200 BAT 100 LSN Figure 3.1: LSN loop with BAT 100 LSN The BAT 100 LSN display panel can be integrated in an LSN loop or stub at any position. Bosch Sicherheitssysteme GmbH Operation Guide 2015.12 | 6.0 | 4.998.148.492...
  • Page 6: Installation

    | Safety Display Panel Figure 3.2: BAT 100 LSN overview Position Description Housing base ATG with 32 LEDs Button for “LED display test” or “Buzzer OFF” Tamper contact Installation Installation space and cable routing 270 mm 75 mm Figure 4.1: Required space 2015.12 | 6.0 | 4.998.148.492...
  • Page 7 Loosen housing screws, and remove housing cap (see Figure 4.3): – Turn cap in the lower area approx. 1 cm forwards (1). – Lift cap a bit upwards (2). – Pull cap off forwards (3). Bosch Sicherheitssysteme GmbH Operation Guide 2015.12 | 6.0 | 4.998.148.492...
  • Page 8 (5). Turn in the two lower screws (6) and tighten the top screw. Attach the ATG to the spacers of the BAT 100 LSN (always attach from left to right) next to the preassembled ATG. Figure 4.4 shows the spacers for the first ATG (7).
  • Page 9 A dot file (Print_BAT100LSN.dot) is included on the CD supplied with the MPC Panel Controller. Insert the printed labeling strips into the slots on the rear side of the housing cap (see Figure 4.7 (12)). Bosch Sicherheitssysteme GmbH Operation Guide 2015.12 | 6.0 | 4.998.148.492...
  • Page 10 Figure 4.7: Inserting the labeling strips 12. Switch on supply voltage from the control panel. Test the functions of the BAT 100 LSN. 13. Attach grounding cable to the rear side of the housing cap (14) (see also Figure 4.5 (9)).
  • Page 11: Connection

    Display Panel Safety | en Connection ATE2 SUA2/0V SUA1 bLSN2 aLSN2 bLSN1 aLSN1 ATE1 ATE2 SUA2/0V SUA1 bLSN2 aLSN2 bLSN1 aLSN1 ATE1 ATE2 SUA2/0V SUA1 bLSN2 aLSN2 bLSN1 aLSN1 ATE1 Bosch Sicherheitssysteme GmbH Operation Guide 2015.12 | 6.0 | 4.998.148.492...
  • Page 12: Maintenance

    Notice! Have maintenance and inspection work carried out regularly by trained, qualified personnel. Bosch Sicherheitssysteme GmbH recommends a functional and visual inspection at least once a year. Warranty Defective modules/devices are exchanged free of charge in the case of a claim under the warranty.
  • Page 13: Technical Data

    15 mA@ 8 V DC - all 32 LEDs on: max. 25 mA@ 24 V DC or max. 60 mA@ 8 V DC Mechanics BAT 100 LSN housing Dimensions (H x W x D) 270 x 270 x 75 mm...
  • Page 16 Bosch Sicherheitssysteme GmbH Robert-Bosch-Ring 5 85630 Grasbrunn Germany www.boschsecurity.com © Bosch Sicherheitssysteme GmbH, 2015...

Table of Contents