Installation Instructions:
1. Put the generator in stop mode.
2. Disconnect the positive battery terminal.
(Do not reconnect the positive battery
terminal until step 19.)
3. Using the magnetic mounts, mount the
One Link inside of the generator enclosure
close to the controller. (Be sure the
mounting location is away from weather
exposure.)
4. Connect the ring connector on the bare
red
wire of the battery wiring harness to the
positive (+) battery terminal.
5. Connect the ring connector on the bare
black
wire of the battery wiring harness to
the negative (-) battery terminal.
6. Route the
brown
blue
wire from the One Link I/O cable to the
battery wiring harness installed in steps 4
and 5.
7. Using one of the included lever wire
connectors, connect the bare
from the battery wiring harness to the
wire and
orange
cable.
8. Using one of the included lever wire
connectors, connect the bare
the battery wiring harness to the
from the One Link I/O cable.
wire,
orange
black
wire from the One Link I/O
red
1 (888) 366-7886
wire, and
wire
blue
wire from
brown
wire
Cummins PCC2100 GTS
Installation Guide
One Link v3/v3b
Panel:
Parts List:
OLM003B
OLSC005

Advertisement

loading
Need help?

Need help?

Do you have a question about the Cummins PCC2100 GTS and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for One Link Cummins PCC2100 GTS

  • Page 1 6. Route the brown wire, orange wire, and blue wire from the One Link I/O cable to the battery wiring harness installed in steps 4 and 5. 7. Using one of the included lever wire connectors, connect the bare black...
  • Page 2 13. Route the brown wire with white stripe from the One Link I/O cable to J8-V1 (Pin 4). 14. Route the red wire with the white stripe from the One Link I/O cable to J8-V3 (Pin 20).
  • Page 3 flathead screwdriver. 19. Reconnect the positive battery terminal to the battery. At this time the One Link will power up and begin communicating with the generator. Please allow 5-10 minutes for the One Link to establish a connection to the internet, and...
  • Page 4 Cummins PCC2100 GTS Installation Guide One Link v3/v3b GTS Installation 1. Connect the wire from the OneLink I/O cable to the Normally Closed contact on the LOCP relay. 2. Connect the Common terminal on the relay to the negative terminal on the battery.