Installation Instructions:
1. Put the generator in stop mode.
2. Disconnect the positive battery terminal.
(Do not reconnect the positive battery
terminal until step 19.)
3. Using the magnetic mounts, mount the
One Link inside of the generator enclosure
close to the controller. (Be sure the
mounting location is away from weather
exposure.)
4. Connect the ring connector on the bare
red
wire of the battery wiring harness to the
positive (+) battery terminal.
5. Connect the ring connector on the bare
black
wire of the battery wiring harness to
the negative (-) battery terminal.
6. Route the
red
stripe, and
black
cable to the battery wiring harness installed
in steps 4 and 5.
7. Using one of the included lever wire
connectors, connect the bare
from the battery wiring harness to the
wire and
red
wire with white stripe from the
One Link I/O cable.
8. Using one of the included lever wire
connectors, connect the bare
the battery wiring harness to the
from the One Link I/O cable.
wire,
red
wire with white
wire from the One Link I/O
black
red
1 (888) 366-7886
wire
black
wire from
red
wire
Cummins PCC2100
Installation Guide
One Link v2
Panel:
Parts List:
OLM002
Lever Connectors(2)
Need help?
Do you have a question about the Cummins PCC2100 and is the answer not in the manual?
Questions and answers