Download Print this page

Advertisement

Quick Links

COLOURLINE
LAZER WET — INSTALLATION INSTRUCTIONS
CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF.
GENERAL:
1. Before starting the installation, make sure all electricity has been turned off
and electrical breaker has been locked out and tagged out.
2. To ensure the success of the installation, be sure to read these instructions
and review the diagrams thoroughly before beginning.
3. All electrical connections must be in accordance with local codes,
ordinances, or the National Electrical Code.
NOTE: The important safeguards and instructions appearing in this manual are
not meant to cover all possible conditions and situations that may occur.
INSTALLATION:
1) Verify Physical Layout Plan.
a) Ensure all hardware is present.
b) Ensure all electrical feeds are correctly positioned with all hardware and any
other active components.
c) Confirm DMX Addressing Plan.
i. SSL recommends pre-addressing luminaires before
mounting installation.
ii. Ensure that addressing is documented for future upgrading,
configuring or troubleshooting.
iii. Create an addressing table to document all luminaire IDs and
their physical location.
HARDWARE: May include RDM Controller, Exterior Rated Data Line, AC Power
Feed, PDX/S box, PDX2 box, Starter Cords, Terminator Caps, Extension Cables
and luminaires.
NOTE: Use Extension Cable when necessary, for corners and extending
luminaire runs.
IMPORTANT: Max Run Length: see Chart A.
REQUIRED: Starter Cable (SC05/10/25/50LZWET or SC10LZWETL) and
Terminator Cap (TCAPDCLZWET) are required for every run.
© SOLID STATE LUMINARIES.
DETAILED ILLUSTRATION
CLZWET — Single Segment Configuration
RDM
Controller
AC Input
(120V)
DMX
Data Line
Controller
(Belden 3105A - Exterior)
ColourLine Select
Pharos Controller
Nicolaudie
Starter Cable
SCxxLZWET
xx = 5', 10', 25' or 50'
PDX2
AC Input
(120 - 277 VAC)
www.solidstateluminaires.com
3609 Swenson Ave.
St. Charles, IL 60174
Max Run Length:
See Chart A
End Runs with
Terminator Cap
End-to-End Connection (or)
Extension Cable
(ECxxLZWET)
xx = 24", 60", 120" or 240"
Chart A
Maximum Run Length
120V
277V
5W/FT
160 FT
360 FT
10W/FT
80 FT
180 FT
CLZWETii
TG-DM-041425

Advertisement

loading
Need help?

Need help?

Do you have a question about the COLOURLINE LAZER WET and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ssl COLOURLINE LAZER WET

  • Page 1 Starter Cable other active components. SCxxLZWET c) Confirm DMX Addressing Plan. xx = 5', 10', 25' or 50' i. SSL recommends pre-addressing luminaires before End Runs with mounting installation. Data Line ii. Ensure that addressing is documented for future upgrading,...
  • Page 2 COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 CLZWET — Multiple Segment Configuration Chart A Maximum Run Length 120V 277V...
  • Page 3 COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 CLZWET — Extended Segment Configuration Chart A Maximum Run Length 120V 277V...
  • Page 4: Installation

    COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 GENERAL: 1. Before starting the installation, make sure all electricity has been turned off and electrical breaker has been locked out and tagged out.
  • Page 5 COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 PDX2 — Power / Data Box GENERAL: 1.
  • Page 6 COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 PDX2 — Wiring GENERAL: 1. Before starting the installation, make sure all electricity has been turned off and electrical breaker has been locked out and tagged out.
  • Page 7 COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 Standard Dimensions & Cables Corners & Cord Bending 2 inch 0.75 inch Output...
  • Page 8 COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 Bracket Mounting Bracket Footprint Tighten Set Screw Input Using 3/32 Hex Tool (Torque: 1.5 FT/LBS)
  • Page 9 COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 4" CAUTION: BEFORE ASSEMBLING, APPLY CLWFA Bracket Mounting CLWFA Bracket Footprint LOCTITE 242 (PROVIDED) TO THREADS.
  • Page 10 COLOURLINE LAZER WET — INSTALLATION INSTRUCTIONS ™ CAUTION: BEFORE CONNECTING THE LUMINAIRE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF. www.solidstateluminaires.com 3609 Swenson Ave. DETAILED ILLUSTRATION St. Charles, IL 60174 LCLZWL-1 Louver Placement LOUVER INSTALLATION — LCLZWL-1: 1.

This manual is also suitable for:

Clzwet