ColourLine
LazerLine Wet - INSTALLATION and OPERATION INSTRUCTIONS
™
CAUTION: BEFORE CONNECTING THE FIXTURE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF.
GENERAL:
1. Before starting the installation, make sure all electricity has been turned off and electrical breaker has been locked out and tagged out.
2. To ensure the success of the installation, be sure to read these instructions and review the diagrams thoroughly before beginning.
3. All electrical connections must be in accordance with local codes, ordinances, or the National Electrical Code.
NOTE: The important safeguards and instructions appearing in this manual are not meant to cover all possible conditions and situations that may occur.
INSTALLATION:
1) Verify Physical Layout Plan.
a) Ensure all hardware is present.
b) Ensure all electrical feeds are correctly positioned with all hardware and any other active components.
c) Confirm DMX Addressing Plan.
i. SSL recommends pre-addressing fixtures before mounting installation.
ii. Ensure that addressing is documented for future upgrading, configuring or troubleshooting.
iii. Create an addressing table to document all fixture IDs and their physical location.
HARDWARE: May include RDM Controller, Exterior Rated Data Line, AC Power Feed, PDX/S box, PDX2 box, Starter Cords, Terminator Caps, Extension Cables and fixtures.
NOTE: Use Extension Cable when necessary, for corners and extending fixture runs.
IMPORTANT: Max Run Length: see Chart A.
REQUIRED: Starter Cable (SC05/10/25/50LZWET or SC10LZWETL) and Terminator Cap (TCAP DCLZWET) are required for every run.
CONFIDENTIAL THIS DOCUMENT IS THE PROPRIETARY PROPERTY OF SOLID STATE LUMINAIRES. ANY UNAUTHORIZED TRANSFER, USE OR REPRODUCTION IS STRICLY PROHIBITED. ©SOLID STATE LUMINAIRES.
1
CLZWET
t 800.900.1730
3609 Swenson Ave.
St. Charles, IL 60174
CLZWETii
TG-DM-071823
Need help?
Do you have a question about the ColourLine LazerLine Wet and is the answer not in the manual?
Questions and answers