Advertisement

Quick Links

IQ Combiner 2 EU 3P
Quick install guide
Scan the QR code for the latest
quick install guide
Scansione della Guida all'installazione
rapida più recente
Recherchez le dernier guide d'installation
rapide
Scannen voor de nieuwste Quick Install
Guide
Procurar o Guia de Instalação Rápida
mais recente
Buscar la última Guía de instalación
rápida
Σάρωση για τον πιο πρόσφατο Οδηγό
γρήγορης εγκατάστασης
Scannen Sie den QR-Code für die
neueste Schnellinstallationsanleitung
M O D E L N U M BER :
X - I Q- EU RO - 230- 3P-4 -2
VE R S I O N 2. 0
J ULY 2 02 4
1
E NG LISH
IQ Combiner 2 EU 3P quick install guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IQ Combiner 2 EU 3P and is the answer not in the manual?

Questions and answers

Summary of Contents for enphase IQ Combiner 2 EU 3P

  • Page 1 M O D E L N U M BER : X - I Q- EU RO - 230- 3P-4 -2 VE R S I O N 2. 0 J ULY 2 02 4 IQ Combiner 2 EU 3P quick install guide...
  • Page 2: Introduction

    IQ Battery 5P with FlexPhase. The IQ Combiner 2 EU 3P enables the grid-tied operation of the IQ Battery 5P. To install the IQ Combiner 2 EU 3P, read and follow all warnings and instructions in this guide and documents at enphase.com/support.
  • Page 3: Table Of Contents

    Instructions for field wiring....................................11 Control wiring guidance for installing IQ Battery 5P(s) with a Communications Kit 2 INT..............11 Wiring the Communications Kit 2 INT (inside the IQ Combiner 2 EU 3P)....................12 Control (CTRL) wiring between system components..........................13 Section D - Commissioning..........................14 Appendix................................14...
  • Page 4: Section A - Preparation And Installation

    Wall plug/universal dowel (at least 8 mm in length) Provided by installer Wall fixings (M4 × 40 mm minimum) Provided by installer As per the conductor Ferrules Provided by installer size and quantity Ferrule crimping tool Provided by installer IQ Combiner 2 EU 3P quick install guide...
  • Page 5: Section A - Preparation And Installation

    For 13 DIN spaces Cable glands (3 × M25, 4 × M32) Quick install guide (EN) (this document) Current transformers (CTs) for Cable glands consumption metering IQ Combiner 2 EU 3P Quick install guide IQ Combiner 2 EU 3P quick install guide...
  • Page 6: Preparation

    Appendix section for drilling dimensions. C) The IQ Combiner 2 EU 3P is designed for top-side cable entry. Install suitable cable glands and tighten them when feeding the cables through. Follow the instructions provided in sections B and C for wiring the IQ Combiner for your application.
  • Page 7: Section B - System Configuration

    Consumption CT wires to the CT terminal block. solid lines lines Field Field color Black Blue Neutral Yellow cable details circuit breaker (20 A, B-curve) circuit breaker (16 A, B-curve) circuit breaker (20 A, B-curve) IQ Combiner 2 EU 3P quick install guide...
  • Page 8: Pv Only System

    (20 A, B-curve) circuit breaker (16 A, B-curve) circuit breaker (20 A, B-curve) NOTE: Production CTs moved to the L1, L2, and L3 of cable assembly from the circuit breakers to the RCD. IQ Combiner 2 EU 3P quick install guide...
  • Page 9: Iq Battery Only System (With String Inverters On The Main Electrical Panel)

    NOTE: Re-label PV circuit breaker and IQ Relay as storage circuit breaker and storage IQ Relay. solid lines lines Field Field color Black Neutral Blue Yellow cable details Storage circuit breaker (20 A, B-curve) circuit breaker (16 A, B-curve) circuit breaker (20 A, B-curve) IQ Combiner 2 EU 3P quick install guide...
  • Page 10: Iq Battery And String Inverter

    Consumption CT wires to the CT terminal block. solid lines Field lines Field Wire color codes Black Blue Yellow cable details circuit breaker (20 A, B-curve) circuit breaker (16 A, B-curve) circuit breaker (20 A, B-curve) IQ Combiner 2 EU 3P quick install guide...
  • Page 11: Section C - Wiring

    The drain wire should only be terminated on one end of the control wiring between system components. • It is recommended that the drain wire be terminated at the component from which the control wiring for the section is initiated. IQ Combiner 2 EU 3P quick install guide...
  • Page 12: Wiring The Communications Kit 2 Int (Inside The Iq Combiner 2 Eu 3P)

    IQ Combiner 2 EU 3P) The IQ Combiner 2 EU 3P supports only wired control connections. NOTE: Use Enphase recommended cables, headers, and refer to local codes for any specific local requirements. * For Enphase-recommended Control cables, refer to https:/ /link.enphase.com/control-cable-table-eu.
  • Page 13: Control (Ctrl) Wiring Between System Components

    *Earth connection is needed only if the Control cable drain wire is connected to the terminal. The terminal can accept wire sizes between 0.14 mm to 2.5 mm Sequence 2: IQ Battery 5P - Communications Kit 2 INT (inside the IQ Combiner 2 EU 3P) - IQ Battery 5P IQ Battery 5P IQ Battery 5P *Earth connection is needed only if the Control cable drain wire is connected to the terminal.
  • Page 14: Section D - Commissioning

    NOTE: If using an Ethernet cable for an internet connection, ensure it has sufficient strain relief when connecting to the IQ Gateway. NOTE: The IQ Combiner 2 EU 3P is certified for use with the Mobile Connect. The plug-and-play Mobile Connect can be purchased and connected to a USB port on the IQ Gateway and installed inside the IQ Combiner.
  • Page 15: Iq Gateway Leds And Buttons

    E V E N T Flashing green Connecting to EIP or the Wi-Fi router. Green IQ Gateway is connected to Enphase Installer Platform (EIP). Connected to the local network only, that is, without internet. No network is available. AP MODE LED...
  • Page 16: Communications Kit 02

    L E D S TAT E E V E N T ERROR (control or BUS error) Blinking green Communications Kit firmware update Green The Communications Kit is operational Blue No USB communication IQ Combiner 2 EU 3P quick install guide...
  • Page 17: Program Iq Relay For Single-Phase Operation (For Single-Phase Sites)

    Test contactor and RED (solid) RED (solid) RED (solid) RED (solid) The TEST button is being pushed. auto config phase Toggle state assignments Corrupted FLASH FAULT OPEN (flashing) (flashing) (flashing) (flashing) IQ Combiner 2 EU 3P quick install guide...
  • Page 18: Safety

    Always install CT wires in the terminal blocks before energizing the sensed circuit. Environmental protection DANGER: Risk of electric shock. Do not use Enphase equipment in a manner not specified by the manufacturer. Doing so may cause ELECTRONIC DEVICE: DO NOT THROW AWAY. Waste electrical death or injury to persons or damage to equipment.
  • Page 19: Revision History

    R E V I S I O N D AT E D E S C R I P T I O N 140-00392-02 July 2024 Editorial updates. 140-00392-01 July 2024 Initial release. IQ Combiner 2 EU 3P quick install guide...
  • Page 20 IQC-2-EU-3P-00392-01-EN-INT-2024-07-25 © 2024 Enphase Energy. All rights reserved. Enphase, the e and CC logos, IQ, and certain other marks listed at https://enphase.com/trademark-usage-guidelines are trademarks of Enphase Energy, Inc. in the U.S. and other countries. Data subject to change. IQ Combiner 2 EU 3P quick install guide...