Download Print this page

Advertisement

Quick Links

Zen SS316L
Bathroom Accessories
Versions:202405
Finish & SKU

Advertisement

loading
Need help?

Need help?

Do you have a question about the Zen SS316L and is the answer not in the manual?

Questions and answers

Summary of Contents for Nero Zen SS316L

  • Page 1 Zen SS316L Bathroom Accessories Versions:202405 Finish & SKU...
  • Page 2 Zen SS316L Bathroom Accessories Zen SS316L SINGLE TOWEL RAIL 600MM Zen SS316L HAND TOWEL RING NR1624BN / NR1624BG NR1680BN / NR1680BG NR1624BZ / NR1624GR NR1680BZ / NR1680GR Zen SS316L DOUBLE TOWEL RAIL 600MM Zen SS316L ROBE HOOK NR1624dBN / NR1624dBG...
  • Page 3 Zen SS316L DOUBLE TOWEL RAIL 800MM Zen SS316L TOILET ROLL HOLDER NR1630dBN / NR1630dBG NR1686BN / NR1686BG NR1630dBZ / NR1630dGR NR1686BZ / NR1686GR Ø6 Zen SS316L SOAP DISH HOLDER Zen SS316L METAL SHOWER SHELF NR1681BN / NR1681BG NR1687aBN / NR1687aBG...
  • Page 4: Installation Instruction

    Installation Instruction Towel Rail Installation 1. Place the towel rail in the desired installation 2. Position the fixing blocks at the marked spots. position. Mark the drilling points through the fixing block Use a level to ensure it is horizontal. holes.
  • Page 5 OPTIONAL CUSTOMIZATION: If required, the right side of the towel rail can be shortened to fit your bathroom. 2. Use a hacksaw or pipe cutter to cut the towel rail 1. Detach the end cap from the right side of to the desired length, then deburr the end with a file the towel rail.
  • Page 6 Toilet Roll Holder Installation (Right Hand) Note: Our toilet paper holder is designed for versatility, allowing the rod to be installed with either left-hand or right-hand opening. 1. Unscrew the cover from the toilet roll holder. 2. Use an electric drill with a 6mm drill bit to drill Place the toilet roll holder in the desired installation holes at the marked points.
  • Page 7 Toilet Roll Holder Installation (Left Hand) 1. Place the toilet roll holder in the desired 2. Position the fixing blocks at the marked spots. installation position. Mark the drilling points through the fixing block Use a level to ensure the towel roll holder is holes.
  • Page 8 Soap Dish Holder/Metal Shower Shelf Installation ∅ 1. Place the soap dish holder/metal shower shelf in 2. Position the fixing blocks at the marked spots. the desired installation position. Mark the drilling points through the fixing block Use a level to ensure it is horizontal. holes.
  • Page 9 Hand Towel Ring Installation ∅ 1. Place the towel ring in the desired installation 2. Use an electric drill with a 6mm drill bit to position. drill holes at the marked points. Use a level to ensure it is horizontal. Mark the positions directly below the bases with a marking pen.
  • Page 10 Robe Hook Installation 1. Use the mounting bracket to mark the drilling 2. Use an electric drill with a 6mm drill bit to drill points on the wall. holes at the marked points. 3. Insert the expansion plugs into the drilled holes 4.