This instrument must meet Factory Test Limits before it leaves Manufacturing;
therefore, it must be possible to inspect to these limits.
Because of normal
variations in test equipment and plug-in scopes, addition of side panels, etc,
this procedure may require that some checks and adjustments be made so that
performance is better than that required by Factory Test Limits.
1.
PRELIMINARY INSPECTION
8.
NORM-INVERT SHIFT
Install current modifications
+ldiv max
2.
PRESET TYPE 3A74
9,
LINE-VOLTAGE TRACE DRIFT
a.
Front panel controls
Check vertical drift due to changing
b.
DC BAL,
GAIN ADJ,
all other internal
line voltage 105VAC to 125VAC:
adjustments should be centered
less than 0.5div
3.
RESISTANCE CHECKS
'10.
OUTPUT AMPLIFIER
a.
Check interconnecting plug resistances---
a.
Setup
negative meter lead to gnd
"b.
Adjust CAL for 20:1 gain
b.
Check protection diodes
c.
Check amplifier balance: within 5%
11.
CH 1, 2,
3, 4 INPUT GRID CURRENT
-Set up equipment;
allow 5 minutes for
.
warmup
Check CH 1,
2,
3,
4 input grid
currents:
less
than 0.2div trace
shift
5.
ZENER VOLTAGE
Check +50V +5V (D494)
12.
MICROPHONICS
)
Check microphonics
(ringing-type):
6.
DC BALANCE
less than 0.5div
Adjust CH 1,
2,
3,
4 DC BAL:
less
than 1 minor div trace shift when
13.
ALTERNATE DISPLAY
setting of VAR GAIN is changed
Check for alternate display with
2 or more channels
7.
POSITION RANGE
a.
Locate CRT electrical center
b.
Adjust Position Range (R449):
all
14.
CHOPPED DISPLAY
traces less
than ldiv from CRT
electrical center with POSITION
a.
Adjust chopped blanking signal
controls
centered
amplitude:
35V P-P
c.
Check Output balance:
within 0.2div
Check CH 1 ONLY trigger noise:
300mV or less
b.
Check CRT CATHODE SELECTOR switch:
switching transients blanked out
in CHOPPED BALNKING position
July 1969
3A74
5
Need help?