Page 1
B2S Series Series HIGH-VOLTAGE BATTERY USER MANUAL B2-(5.0-25.0)-HV1-S B2-(5.0-25.0)-HV5-S...
Page 2
We make constant improvements on the products and their documentation. This manual is subject to change without notice; these changes will be incorporated in new editions of the publication. To access the latest documentation, visit the SAJ website at https://www.saj-electric.com/.
B2S Series TABLE OF CONTENTS 1. SAFETY PRECAUTIONS ..........................................1 1.1. About This Document ....................................2 1.1.1. Overview ......................................2 1.1.2. Target audience ....................................2 1.2. Safety ..........................................2 1.2.1. Safety Levels ...................................... 2 1.2.2. Symbol Explanation ..................................3 1.2.3.
Page 4
B2S Series 2.4.2. Battery Module ......................................12 2.5. Ports, switches, and LED on the Battery Control Unit ........................13 2.6. Ports on the Battery Module .................................. 14 2.7. LED Indicators on the Battery Control Unit ............................15 2.8. Datasheet ........................................16 2.8.1.
Page 5
B2S Series 5.6. Installing Side Covers ....................................48 5.6.1. Battery control unit ..................................48 5.6.2. Battery module ....................................48 6. Startup and Shutdown ..........................................49 6.1. Startup ......................................... 50 6.2. Shutdown ........................................50 7. Commissioning ..............................................51 7.1. About the Elekeeper App ..................................52 7.2.
User Manual provides introductions and instructions of installing, operating, maintaining, and troubleshooting of the B2S series battery, as listed in section 2.2 "Models”. Read the user manual carefully before any installation, operation and maintenance and follow the instructions during installation and operation. Keep this manual all time available in case of emergency.
B2S Series 1.2.2. Symbol Explanation Symbol Description Danger: Electrical shock hazard This device is directly connected to public grid, thus all work to the battery shall only be carried out by qualified personnel. WARNING: No open flames Do not place or install near flammable or explosive materials.
• SAJ electric shall not be liable for any loss or warranty claims arising from any unauthorized change of product which may cause fatal injury to the operator, third party or equipment performance.
⚫ Operate and use the battery properly according to the user manual. Any attempts to modify battery without the permission from SAJ will void the limit warranty for the battery. ⚫ The battery must be installed at a suitable location with sufficient ventilation.
Page 11
B2S Series area where the battery pack is installed. Wear a gas mask and avoid inhaling toxic gases and harmful substances produced by the fire. ⚫ Use an ABC fire extinguisher, if the fire is not caused by battery and not spread to it yet.
B2S battery is a high voltage battery system. The battery employs modular design for easy installation and wiring. The battery B2S can only be used as a set with SAJ's H2 high voltage series storage inverter, otherwise it cannot be used normally.
B2S Series 2.2. Models 2.2.1. Product Models The B2S series includes the following SAJ products: B2-5.0-HV1-S B2-10.0-HV1-S B2-15.0-HV1-S B2-20.0-HV1-S B2-25.0-HV1-S B2-5.0-HV5-S B2-10.0-HV5-S B2-15.0-HV5-S B2-20.0-HV5-S B2-25.0-HV5-S 2.2.2. Model Description B2: Batter model series : Rated energy x kWh of the battery. For example, 5.0 indicates the rated energy of this battery is 5.0 kW/h.
B2S Series 2.3.3. Base for Ground Mounting (Optional) Base *1 Base foot *4 M4*10 screw *2 2.3.4. Bracket for Wall Mounting (Optional) Top plate *1 Left foot *1 Right foot *1 M6*12 screw *6 M10*80 expansion bolt *6 M4*10 screw *1 2.3.5.
B2S Series 2.5. Ports, switches, and LED on the Battery Control Unit Figure 2.4. Ports, switches, and LED on the battery control unit Callout Silkscreen Description B+ and B- For connection to the battery module BATTERY SWITCH ON/OFF Circuit breaker...
B2S Series 2.6. Ports on the Battery Module Figure 2.5. Ports on the battery module Callout Silkscreen Description LINK Port0 Link port 0, for battery communication connection LINK Port1 Link port 1, for battery communication connection Grounding point B – port, for battery negative power connection B +port, for battery positive power connection Table 2.2.
B2S Series 2.7. LED Indicators on the Battery Control Unit Figure 2.6. LED indicators on the battery control unit LED indicator Status Description Solid on The battery is working properly. Breathing 6s The battery is in initialization or standby state.
The battery cannot be disposed of as household refuse. When the service life of the battery reaches ⚫ to the limit, it is not required to return it to the dealer or SAJ, but it must be recycled to the special waste lithium battery recycling station in the area...
B2S Series 4.1. Precautions For safety, be sure to read all the safety instructions carefully prior to any works and observe the appropriate rules and regulations of the country or region where you installed the energy storage system. DANGER •...
B2S Series ⚫ Keep the device from water sources such as taps, sewer pipes and sprinklers to prevent water seepage. ⚫ It is recommended that the device be installed in an area where its status can be easily checked and maintained in case of failure or emergency.
Page 29
B2S Series ⚫ Choose a solid and smooth wall to ensure that the device can be installed securely on the wall. Make sure that the wall can bear the weight of the device and accessories. Reserve enough clearance around the device to ensure a good air circulation at the installation area, ⚫...
B2S Series 4.3. Preparing Installation Tools The tools illustrations are for your reference. Installation tools include but are not limited to the following recommended ones. Use other auxiliary tools based on site requirements. Multimeter Measurement Utility knife Marker Measuring tape...
4.4. Unpacking 4.4.1. Checking the Outer Packing Although SAJ’s products have thoroughly tested and checked before delivery, there is possibility that the products may suffer damages during transportation. Check the outer packing package for any damage, such as holes and cracks.
Page 32
B2S Series Step 2. Place the base on the ground. Make sure the distance between the base and the wall is 28-34mm. Place the battery module onto the base and secure it with screws (M4*10). M4*10 1.2 N· m Figure 4.6. Securing the battery to the wall...
Page 33
B2S Series Step 3. Place the second battery module onto the first battery module. On each side of the battery, rotate the locking bracket clockwise and secure it. Repeat the same operations until all required battery modules are installed. M4*10 1.2 N·...
Page 34
B2S Series Step 4. Place the battery control unit onto the top of the battery pack. Install the locking brackets on each side of the battery control unit and mark the U-shaped hole of the locking brackets on the wall.
Page 35
B2S Series Step 5. Drill holes (13mm in diameter, 65mm in depth) at the positions marked in step 4. Figure 4.9. Drilling holes on the wall...
Page 36
B2S Series Step 6. Place the battery control unit back to the top of the battery pack. To secure the battery control unit to the wall, use a rubber hammer to drive the M10*80 screws into the drilled holes and then use the wrench to tighten the screws.
B2S Series 4.5.2. Wall mounting Before you start Make sure that the wall can bear the weight of the device and accessories. Procedure Step 1. Assemble the bracket. Figure 4.11. Assembling the bracket...
Page 38
B2S Series Step 2. Place the Mark the proper positions of locking bracket and drill holes on those positions (13mm in diameter, 65mm in depth) by using the locking bracket as a template, and then use a rubber hammer to drive the screw fixing seat into the holes to fix the bracket.
Page 39
B2S Series Step 3. Place the battery module on the bracket and tighten the screws to secure it to the wall. Place the second battery module onto the first battery module. On each side of the battery, rotate the locking bracket clockwise and secure it.
Page 40
B2S Series Step 4. Place the battery control unit onto the top of the battery pack. Install the locking brackets on each side of the battery control unit and mark the U-shaped hole of the locking brackets on the wall. Then, remove the battery control unit.
Page 41
B2S Series Step 5. Drill holes (13mm in diameter, 65mm in depth) at the positions marked in step 4. Figure 4.15. Drilling holes on the wall...
Page 42
B2S Series Step 6. Place the battery control unit back to the top of the battery pack. To secure the battery control unit to the wall, use a rubber hammer to drive the M10*80 screws into the drilled holes and then use the wrench to tighten the screws.
B2S Series 5.1. Safety Instructions Electrical connection must only be operated on by professional technicians. Operators must be aware that the inverter is a bi-power supply equipment. Before connection, necessary protective equipment must be employed by technicians including insulating gloves, insulating shoes, and safety helmet.
B2S Series Step 2. Connect the grounding cable on the battery control unit and the battery modules. Remove the M4*10 screw from the grounding port on the battery control unit. Connect and secure the grounding cable. Use M4*10 screws to connect and secure the grounding cables on the battery modules.
Page 47
B2S Series Procedure Step 1. Connect LINK Port0 on the battery control unit to Link Port 1 on battery 5. Step 2. Connect Link Port 0 on Battery 5 to Link Port 1 of Battery 4. Repeat the same operations on Batteries 3, 2, and 1 until all five batteries are connected.
B2S Series 5.4. Connecting Power Cables among Batteries WARNING • Power off the battery system before connecting the power cable to avoid high voltage danger • The electrical connection of high voltage battery systems must be operated by qualified technicians in accordance with local and national power grid standards and regulations.
B2S Series 5.5. Connecting the Battery to the Inverter Use the 1.5m communication cable (standard network cable) provided in the battery control unit package. 5.5.1. Single-Cluster Battery Connection Before you start Make sure that the vertical height between the inverter and the battery control unit is less than 0.7m.
Page 50
B2S Series Figure 5.6. Single-cluster connection Step 3: For the communication cable, use an open-ended wrench to secure the RJ45 connector to the CAN1 port on the inverter. Tighten the seal and the sealing nut to the connector body. Figure 5.7. Securing the RJ45 connector to the CAN1 port...
B2S Series 5.5.2. Multi-cluster Battery Connection About this task If two or more clusters of batteries are installed, install the inverter in a location adjacent to the first cluster of batteries. Use the 4m negative power cable (refer to section 2.3.5 “Accessory Package for Multi-cluster Battery Connection (Optional)"), instead of the 1.5m negative power cable provided in the battery control...
Page 52
B2S Series Figure 5.8. Multi-cluster battery connection...
B2S Series 5.6. Installing Side Covers 5.6.1. Battery control unit Push the side covers inwards. Press the cover downwards. Tighten the screws on the cover. Figure 5.9. Installing the side covers on the battery control unit 5.6.2. Battery module Push the side covers inwards. Push the side covers forwards. Secure it with screws (M4*25).
B2S Series 6.1. Startup Step 1. Turn on the circuit breaker. Step 2. Press and hold the main switch for two to three seconds, until the LED indicator on the battery control unit is on. Figure 6.1. Switches on the left side of the inverter 6.2.
User Manual SAJ Configuration To perform commissioning operations on the App, refer to the inverter Guide Notes: ⚫ The detailed operations on the App might vary, depending on the version you are using. ⚫ During battery brand selection, select SAJ battery.
Page 59
B2S Series For any errors reported as below, contact the after-sales for service support. The operations and maintenance must be performed by authorized technicians. Error Possible cause Solution Error message code 1. Communication error between battery control unit and battery module 1.
Page 60
B2S Series Error Possible cause Solution Error message code temperature. The battery temperature is higher than Charging temperature high Wait until battery temperature the maximum battery protection protection decreased and the error is clear temperature. The battery temperature is lower than...
Page 61
B2S Series Error Possible cause Solution Error message code Temperature difference is too 1. Temperature sensor error Check if temperature sensor wide 2. Battery life span cable is in poor contact 1. Check if voltage sensor cable Voltage difference is too wide 1.
Check the product warranty conditions and terms on the SAJ website: https://www.saj-electric.com/ 9.3. Contacting Support Guangzhou Sanjing Electric Co., Ltd. Address: SAJ Innovation Park, No.9, Lizhishan Road, Guangzhou Science City, Guangdong, P.R.China. Postcode: 510663 Website: https://www.saj-electric.com/ Technical Support & Service...
Page 64
B2S Series GUANGZHOU SANJING ELECTRIC CO.,LTD Tel: (86)20 66608588 Fax: (86)20 66608589 Web: www.saj-electric.com Add: SAJ Innovation Park,No.9, Lizhishan Road, Science City, Guangzhou High-tech Zone , Guangdong, P.R.China V0.1...