Heckert Solar ZEUS 1.0 Installation Instruction

Solar modules

Advertisement

Quick Links

Installation instruction solarmodules
www.heckert-solar.com
Status: 06/2024

Advertisement

loading
Need help?

Need help?

Do you have a question about the ZEUS 1.0 and is the answer not in the manual?

Questions and answers

Summary of Contents for Heckert Solar ZEUS 1.0

  • Page 1 Installation instruction solarmodules www.heckert-solar.com Status: 06/2024...
  • Page 2 This installation manual should form part of the plant documentation, and should be available to the plant operator at any given time. Heckert Solar reserves the right to amend the present document at any time without prior notice. Please use the most current copy, which can be found on our homepage at https://www.heckertsolar.com/service/...
  • Page 3: Rear Ventilation

    Risk of death by electric arc! A deadly electric arc can result when opening a closed section (e.g. when separating the DC cable from the inverter under load): Never separate the solar generator from the invertor if the latter is connected to the grid! •...
  • Page 4 3. Delivery & handling of the modules The goods must be checked immediately upon delivery to ensure completeness and integrity. Only damage that is noted on the driver’s delivery receipt and are immediately communicated in written form to Heckert Solar can be recognised as transport damages.
  • Page 5 First remove the foil and all tensioning straps. • • Open the cover and remove the outer packaging. Loosen the inner tensioning straps. Attention, the modules must be secured by a second person! • The modules are secured with additional adhesive tape. Do not remove it from the first module until you are •...
  • Page 6 place any objects on the modules. Never stand on the modules! Do not allow the modules to fall or use hard or pointed objects on them. • Special care must be taken to connect the modules in accordance with the instructions and should not be forced.
  • Page 7 (Tested with Heckert Solar rails and a support spacing of max. 1m) Ensure that the maximum mechanical load is not exceeded, in particular while also taking into account the site- dependent loads, e.g.
  • Page 8 6. Connecting the modules The solar modules from Heckert Solar are equipped with Original MC4 EVO 2A connectors (Stäubli – MultiContact). Only connectors in accordance with DIN EN 62852 (VDE 0126-300) may be used. In addition, only plug connectors from the original MC4 plug family may be connected with one another.
  • Page 9 The two outer connection boxes are each equipped with a cable (length 1200 mm) and Stäubli MC4-EVO2A connectors. The connectors are each designed in such a way as not to create confusion. Figure 4: Arrangement of connection boxes using the example of ZEUS 1.0...
  • Page 10 The individual solar modules in a string can be interconnected effortlessly in this way. Please ensure the correct connection of the plugs and sockets! It is essential to follow the manufacturer’s instructions (PV_MA298): Connect the cable couplings until there is an audible “click”. Check correct engagement pulling cable...
  • Page 11: Electrical Installation

    Cable routing Per string, 2 cables are required that connect the solar generator to the inverter. Please use solar cables that comply with the standard EN 50618 class 5 and the respective requirements. The minimum cross-section is 4mm². Cable losses should be <...
  • Page 12 This installation and operating manual applies to standard installations. All information is supplied without guarantee. Heckert Solar GmbH shall assume no liability for the usability and functionality of the system if there are deviations from the instructions contained in this user information. Given that neither compliance with this user information, nor the...

This manual is also suitable for:

Zeus 1.1