Ecoer TDi Pro 2 AHU IM
Installation Manual
High Efficiency Air Handlers
2-5Ton Capacity
R-454B EEV Inside
Contents
7. Ductwork--------------------------------------------
This document is customer's property and is to remain with this unit. Please return it to
All phases of this installation must comply with National, State and Local Codes.
customer with service information upon completion of work.
These instructions are intended as an assist to qualified and licensed personnel for proper
installation, adjustment and operation of ECM air handler units. Read it thoroughly before
attempting installation or service work. Failure to follow these instructions may result in fire,
electrical shock, property damage, personal injury or death.
The instructions do not cover all variations in systems or provide for every possible contingency
to be met in connection with the installation.
Manufacturer reserves the right to change specifications or designs without notice.
1 of 37
2
14
16
21
29
NOTE: Appearance of unit may vary.
31
Installation must be performed in
accordance with the requirements of
32
NEC and CEC by authorized
33
personnel only.
37
ECOER INC.
Dec. 2024
Need help?
Do you have a question about the TDi Pro 2 AHU IM and is the answer not in the manual?
Questions and answers