Advertisement

Quick Links

Monitor Service Manual
Model: MB16ACV series
Version no.: 0
Release date: 2023/12/08
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MB16ACV Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Asus MB16ACV Series

  • Page 1 Monitor Service Manual Model: MB16ACV series Version no.: 0 Release date: 2023/12/08...
  • Page 2: Copyright Information

    ASUS will only be responsible for or indemnify you for loss, damages or claims based in contract, tort or infringement under this Warranty Statement. This limit also applies to ASUS’ suppliers and its reseller. It is the maximum for which ASUS, its suppliers, and your reseller are collectively responsible.
  • Page 3: Table Of Contents

    Table of Contents 1. Safety Precautions ......................4 2. Exploded View ........................5 3. Disassembly and Assembly Procedures................ 6 3.1 Disassembly SOP ....................6 3.2 Assembly SOP ....................9 4. Trouble Shooting ......................11...
  • Page 4: Safety Precautions

    1. Safety Precautions FOR PRODUCTS CONTAINING LASER: DANGER- Invisible laser radiation when open. AVOID DIRECT EXPOSURE TO BEAM. CAUTION- Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure. CAUTION- The use of optical instruments with this product will increase eye hazard. TO ENSURE THE CONTINUED RELIABILITY OF THIS PRODUCT, USE ONLY ORIGINAL MANUFACTURER'S REPLACEMENT PARTS, WHICH ARE LISTED WITH THEIR PART NUMBERS IN THE PARTS LIST SECTION OF THIS SERVICE MANUAL...
  • Page 5: Exploded View

    2. Exploded View Item Description Q'ty PANEL MAIN BOARD KEY BOARD1 KEY BOARD2 FRONT CASE REAR CASE EDP CABLE...
  • Page 6: Disassembly And Assembly Procedures

    3. Disassembly and Assembly Procedures 3.1 Disassembly SOP Preparation before disassemble 1. Clean the room for disassemble 2. Identify the area for monitor 3. Check the position that the monitors be placed and the quantity of the monitor; prepare the area for material flow; according to the actual condition plan the disassemble layout 4.
  • Page 7 Remove the Front Case. MAIN BD Disassemble Panel FFC wire to Main Board. Disassemble 2 Key Board to Rear Case by screw *2 pcs. Screw MAIN BD (#SCRW TP-B FPH Torque: Screw M2*2.4L ZN) 1.2±0.5 driver Kg-cm Disassemble 2 Key Board FFC wire to Main Board.
  • Page 8 1. Disassemble Main Board on shielding by screw *6pcs. MAIN BD Screw: Torque: (NUT HEX M2.5*2L Screw 4.5±0.5 D5 ) driver Kg-cm...
  • Page 9: Assembly Sop

    3.2 Assembly SOP Preparation before assemble 1. Clean the room for work 2. Identify the area for material 3. Prepare the implement, equipment and materials as bellow: 1) Working table 2) Screw-driver 3) Glove 4) Cleaning cloth 5) ESD protection After unplugging the power cord, the power Board still have power energe.
  • Page 10 MAIN BD 1. Assemble Panel FFC wire to Main Board. 1. Place panel. Align the top side ribs first. 1. Tear Off the releasing paper of the new Front Case then assemble the Front Case.
  • Page 11: Trouble Shooting

    4. Trouble Shooting...

Table of Contents