  • Page 1 Transport & Installation Manual IRP800 FL Version 2, Rev b X-Y Linear Axis Sept 2024...
  • Page 2: Table Of Contents

    Connecting the polishing fluid drain hose ................17 Connecting the compressed air supply ..................17 Electrical connection ........................ 17 Operation at startup ........................ 18 Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 3: Preface

    Transport and Installation manual, the user documentation is comprised of the following: ◼ Operation manual. ◼ Software manuals. ◼ Maintenance manual. Zeeko LTD Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 4: Instructions For This Manual

    NOTE: Identifies application instructions and other useful and important information. TIP: Specifies information that could be useful and save you unnecessary time and effort. Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 5: Installation Requirement

    Please observe your local COSHH and health & safety regulations before using any chemicals. Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 6: Electromagnetic Influence

    The overall height of the machine is 3000 mm. 2700 mm 2700 mm 750 mm Figure 1 - Machine dimensions Slurry 750 mm delivery system Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 7: Accessibility

    Air filter Compressed air IN X-axis linear motor & H-axis chiller Chiller flow gauge Figure 2 Chiller flow gauge power Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 8: Power Supply

    The return hose is connected to the machine via a 32 mm hose connection at mid-height at the left-hand side of the machine. see Figure 2 Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 9: Delivery

    Pallet is constructed from ISPM-15 Heat Treated plywood. ATTENTION: Please observe all instructions for transport of the machine if you are responsible for unloading. Immediately notify the carrier or Railroad Company and Zeeko Ltd of any damages and other defects, e.g. missing items. Transport ATTENTION: The Transport and Installation of the machine must strictly be carried out only in the presence of Zeeko personnel.
  • Page 10 Figure 3 - Centre of gravity ATTENTION: The pallet must be lifted in the forklift zones marked in Figure Risk of Tipping Over! Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 11: Lifting The Machine On/From The Pallet

    Lifting the machine from the pallet onto the floor. Lifting the machine from the floor onto the pallet ATTENTION: Do not use other pallets than provided by Zeeko. Risk of Tipping Over! The machine MUST ONLY be lifted, NOT TRANSPORTED without the pallet.
  • Page 12: Lifting The Machine From The Pallet Onto The Floor

    To eliminate side movement when transported, fit wooden blocks on the sides of the machine. Lifting the machine from the pallet onto the Floor Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 13: Installation

    NOTE: The installation area must be clean and level (see section - Floor requirements). ◼ Place the machine with the three leveling elements on the planned position. Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 14: Opening The Doors In Case The Machine Is Not Electrically Connected

    Figure 6 - Manual access points to door interlocks Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 15: Removing The Transit Brackets

    1. Remove the QTY 6 M10 x 25 mm cap head screws from the bottom of the bracket to the C-axis table. C-axis table Figure 8 Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 16 3. Remove the QTY 2 M12 x 55 mm cap head screws from the top of each side of the bracket. Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 17: Connection

    Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 18: Operation At Startup

    ◼ The power, compressed air and coolant supply connections required by the machine must be connected. Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...
  • Page 19 Fill the polishing fluid (lubricant) supply unit and connect it to the machine. ◼ Connect the compressed air supply Connect the machine to the power supply. Version 2 – Rev b - Copyright © Zeeko Limited 2024 IRP800 FL X-Y Linear Axis- Transport & Installation Manual...