Page 1
Operation Manual WARNING Be sure to read this Operation Manual before use. Bromley Incorporated in conjunction with Universal Space. 420-Crossen Avenue Elk Grove IL 60007 847-427-0639 Service Dept.
Page 2
Operation Manual Before using the product, be sure to read the follow: To maintain the safety: To ensure the safe usage of the product, be sure to read the following before using the product. The following instructions are intended for the users, operators and the personnel in charge of the operation of the product.
Page 3
Operation Manual CONTENTS The company………………………………………3 Specifications………….………………….……….4 Package Contents………………………………...5 Installation…………………….……………………6 Connecting the power cord and grounding…….8 Game Description…………….……………….….9 Switch…………..……………………………..…..9 Adjustment.……………………………….………10 Maintenance and inspections..………..……..12 Troubleshooting………………………………….14 Overall Construction...…………………………..15 Addendum I/O chart Wiring Diagram - 3 -...
Page 4
Operation Manual 1. The company Thank you for purchasing the amusement Machine our company produce. Our company was found in 1993,it developed on and on and now it has rich human and material resources, been become multiple-producing corporation that combine development, production, sale, management, service after selling.
Operation Manual 2. Specifications Specifications 1 Rated power supply: AC110V 50/60Hz 2 Power Consumption: Min power consumption 75W Max power consumption 225W 3 Dimensions: W836×D1203×H1448(mm) 4 Weight: About 200 Kg 5 Environment Condition: Temperature(indoor):-10 ~+40 Humidity: ≤90% Atmospheric pressure:86Pa~106Pa Note: Game parameters are subject change without notice. - 5 -...
Page 6
Operation Manual 3. Package contents 3.1 Body Assembly: 1 unit ● Make sure that all the parts shown below are included in product package. ● If any parts are missing, contact your distributor. 3.2 Accessories NO Component Specification Q'ty Illustration Note 10A/250V Power wire...
Operation Manual 4. Installation WARNING This product is an indoor game machine. Do not install it outside. Even indoors, Avoid installing in places mentioned below so as not to cause a fire, electric shock , injury and or malfunctioning. ● Place subject to rain or water leakage, or places subject to high humidity in the proximity of an indoor swimming pool and or shower, etc.
Page 8
Operation Manual Location to avoid installing WARNING Do not leave the machine on a slope, otherwise the machine may topple or cause unforeseen accidents. Play zone Space for Operation and Maintenance This machine requires space for playing the game (play zone) and for maintenance (maintenance zone) as shown below.
Operation Manual 5. Connecting the power cord and grounding The connection: 1. Insert the plug of power cord into the power socket of the machine. 2. Insert the power cord plug into a service outlet. WARNING Be sure to connect the ground wire before turn on the machine. Failure to connect the ground wire could result in electric shock if power occurs.
Operation Manual 6.Game description The instruction of how to play 1. Inset coin(s) 2. Press button for color you think ball will stop in 3. Pick color while“Press button” light is flashing. 4. Pick additional colors to increase chances of winning. 7.
Page 11
Operation Manual 8. Adjustment 8.1 Group of score Adjust it to set the group of score. There are 8 options for user to select. It controlled by SW11~SW13. Group of score Option SW11 SW12 SW13 Note SW11~SW13 Green Blue Yellow White 8.2 Credit Time Options...
Page 12
Operation Manual 8.3 Time (for stop the wheel) Adjust it to set the time to stop the wheel. There are 4 options for user to select. It controlled by SW17~SW18. Time Options SW17 SW18 Note SW17 SW18 8.4 Time (Credit) : Adjust it to set the time for chip in of this game.
Page 13
Operation Manual 8.7 Mercy Ticket: Adjust it to set the Mercy Ticket of this game. There are 4 options for user to select. It controlled by SW25~SW26. Mercy Option SW25 SW26 Note Ticket (second) SW25 SW26 8.5 Fault display 1. When starting the game machine or entering the test condition, the related contents show wrong the below information.
Operation Manual 2. The following form represent that the related output signed in the below list should be checked when any devices of the machine couldn’t work. Output Content Output Content Output Content Out1 Coins Out11 Ticket driver2# Out31 Out2 Payout Out12 Lamp(red) 1#...
Operation Manual WARNING 1. Before performing work, be sure to turn power off. Performing the work without turning power off can cause an electric shock or short circuit. In the case work should be performed in the status of power on, this manual always states to that effect.
Operation Manual ★ Always turn off the power first to protect other personnel from electric shock, accidents and injury, and to prevent damage to electrical circuits. ★ If a fault occurs, first check that all the connectors are firmly connected. Contact your distributor if none of the cases below applies to the problem, or if the action listed does not appear to resolve the problem.
Page 17
Operation Manual 11. Overall construction 11.1 Body shell - 17 -...
Page 28
Operation Manual 11.10 Graphic list: Test board: 1. coin counter: record the number of coins. 2. Ticket counter: record the number of tickets. 3. Ticket reset: If the game experiences a ticket jam. After the jam is cleared and the reset button is pressed the game will resume the ticket payout.
Need help?
Do you have a question about the Colorama II and is the answer not in the manual?
Questions and answers