Page 1
DRUM SET INSTRUCTION MANUA MODEL: SH-002-BL, SH-002-BK We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us.
Page 2
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
Page 3
DRUM SSET ASSEMBLY INTRODUTIONS Use these instructions to help in the assembly of your new Union drum set. Drum sets vary, but all share these basic set-up procedures. Remember to have a large open area where you can spread out the parts before you begin.
Page 4
BASS DRUM ASSEMBLY When installing front (logo) drum head,center logo Front of bass drum is between the top two drum lugs. determined by forward bass position of(1) drum spur leg) mounts and, (2) tom mount. Tension rod FRONT REAR Front/Logo Hoop Use the same tension rod...
Page 5
DRUM KIT ASSEMBLY FRONT REAR Memory lock shown in place. Remember.When installing drums,the top of the drum Install cymbals is determined by the name tag reading upright. BOTTOM Install floor tom legs as shown and sot to desired height. ROCK AND ROLL Note: emphasize quarter note pulse on loose hi-hat throughout.
Page 6
Manufacturer: Shanghaimuxinmuyeyouxiangongsi Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Imported to AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australia Imported to USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main. YH CONSULTING LIMITED.
Page 8
Technical Support and E-Warranty Certificate www.vevor.com/support...
BATTERIE D'INSTRUCTIONS MANUEL MODÈLE : SH-002-BL, SH-002-BK We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us.
Page 10
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
Page 11
DRUM SSET ASSEMBLY INTRODUTIONS Utilisez ces instructions pour vous aider à assembler votre nouveau tambour Union ensemble. Les batteries varient, mais toutes partagent ces procédures de configuration de base. N'oubliez pas de disposer d'un grand espace ouvert où vous pourrez étaler les pièces avant de commencer. Il y a de nombreuses parties sur une batterie, mais ne le faites pas ne vous inquiétez pas, une fois que vous avez commencé, le processus est très intuitif et amusant.
Page 12
ASSEMBLAGE DE GROSSE CAISSE When installing front (logo) drum head,center logo Front of bass drum is between the top two drum lugs. determined by forward bass position of(1) drum spur leg) mounts and, (2) tom mount. Tension rod FRONT REAR Front/Logo Hoop Use the same...
Page 13
Tension rod For all tom drums, Including floor tom. Follow the procedure shown when installing the drum heads. First finger-tighten alt the tension rods.Then with drum key, give each tension roll a Washers few turns until the wrinkles in the head disappear.
Page 14
REAR Memory lock shown in place. Remember.When installing drums,the top of the drum Install cymbals is determined by the name tag reading upright. BOTTOM Install floor tom legs as shown and sot to desired height. ROCK AND ROLL Note: emphasize quarter note pulse on loose hi-hat throughout.
Page 15
Fabricant : Shanghaimuxinmuyeyouxiangongsi Adresse : Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN. Importé en Australie : SIHAO PTY LTD, 1 ROKEVA STREETASTWOOD NSW 2122 Australie Importé aux États-Unis : Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main.
Page 17
Technique Assistance et certificat de garantie électronique www.vevor.com/support...
Page 18
SCHLAGZEUG BEDIENUNGSANLEITUNG MODELL: SH-002-BL, SH-002-BK We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us.
Page 19
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
Page 20
DRUM SSET ASSEMBLY INTRODUTIONS Nutzen Sie diese Anleitung als Hilfe beim Zusammenbau Ihrer neuen Union-Trommel Satz. Schlagzeug-Sets variieren, aber alle haben diese grundlegenden Einrichtungsverfahren gemeinsam. Denken Sie daran, einen großen offenen Bereich zu haben, in dem Sie sich ausbreiten können Teile, bevor Sie beginnen. Es gibt viele Teile in einem Schlagzeug, aber das ist nicht der Fall Keine Sorge, wenn Sie einmal angefangen haben, ist der Prozess sehr intuitiv und macht Spaß.
Page 21
BASSDRUM-BAUGRUPPE When installing front (logo) drum head,center logo Front of bass drum is between the top two drum lugs. determined by forward bass position of(1) drum spur leg) mounts and, (2) tom mount. Tension rod FRONT REAR Front/Logo Hoop Use the same tension rod procedure for installing the...
Page 22
Tension rod For all tom drums, Including floor tom. Follow the procedure shown when installing the drum heads. First finger-tighten alt the tension rods.Then with drum key, give each tension roll a Washers few turns until the wrinkles in the head disappear.
REAR Memory lock shown in place. Remember.When installing drums,the top of the drum Install cymbals is determined by the name tag reading upright. BOTTOM Install floor tom legs as shown and sot to desired height. ROCK'N'ROLL Note: emphasize quarter note pulse on loose hi-hat throughout.
Page 24
Hersteller: Shanghaimuxinmuyeyouxiangongsi Adresse : Shuangchenglu 803nong11hao1602A-1609shi, Baoshanqu, Shanghai 200000 CN. Importiert nach AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australien In die USA importiert: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main.
Page 26
Technisch Support- und E-Garantiezertifikat www.vevor.com/support...
SET DI BATTERIA DI ISTRUZIONI MANUALE MODELLO: SH-002-BL, SH-002-BK We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us.
Page 28
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
Page 29
DRUM SSET ASSEMBLY INTRODUTIONS Usa queste istruzioni per aiutarti nell'assemblaggio del tuo nuovo tamburo Union impostato. I set di batteria variano, ma condividono tutti queste procedure di configurazione di base. Ricordatevi di avere un ampio spazio aperto dove poter stendere il parti prima di iniziare. Ci sono molte parti su una batteria, ma non farlo preoccuparti, una volta iniziato il processo è...
Page 30
MONTAGGIO DELLA GRANCASSA When installing front (logo) drum head,center logo Front of bass drum is between the top two drum lugs. determined by forward bass position of(1) drum spur leg) mounts and, (2) tom mount. Tension rod FRONT REAR Front/Logo Hoop Use the same tension rod...
Page 31
Tension rod For all tom drums, Including floor tom. Follow the procedure shown when installing the drum heads. First finger-tighten alt the tension rods.Then with drum key, give each tension roll a Washers few turns until the wrinkles in the head disappear.
Page 32
REAR Memory lock shown in place. Remember.When installing drums,the top of the drum Install cymbals is determined by the name tag reading upright. BOTTOM Install floor tom legs as shown and sot to desired height. ROCK AND ROLL Note: emphasize quarter note pulse on loose hi-hat throughout.
Page 33
Produttore: Shanghaimuxinmuyeyouxiangongsi Indirizzo : Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Importato in AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australia Importato negli Stati Uniti: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main.
Page 35
Tecnico Supporto e certificato di garanzia elettronica www.vevor.com/support...
Page 36
BATERÍA DE INSTRUCCIONES MANUAL MODELO: SH-002-BL, SH-002-BK We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us.
Page 37
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
Page 38
DRUM SSET ASSEMBLY INTRODUTIONS Utilice estas instrucciones para ayudar en el montaje de su nuevo tambor Union colocar. Las baterías varían, pero todas comparten estos procedimientos básicos de configuración. Recuerde tener un área grande y abierta donde pueda distribuir partes antes de comenzar. Hay muchas partes en una batería, pero no Preocúpate, una vez que empieces el proceso es muy intuitivo y divertido.
Page 39
MONTAJE DEL BOMBO When installing front (logo) drum head,center logo Front of bass drum is between the top two drum lugs. determined by forward bass position of(1) drum spur leg) mounts and, (2) tom mount. Tension rod FRONT REAR Front/Logo Hoop Use the same tension rod...
Page 40
Tension rod For all tom drums, Including floor tom. Follow the procedure shown when installing the drum heads. First finger-tighten alt the tension rods.Then with drum key, give each tension roll a Washers few turns until the wrinkles in the head disappear.
Page 41
REAR Memory lock shown in place. Remember.When installing drums,the top of the drum Install cymbals is determined by the name tag reading upright. BOTTOM Install floor tom legs as shown and sot to desired height. ROCK AND ROLL Note: emphasize quarter note pulse on loose hi-hat throughout.
Page 42
Fabricante: Shanghaimuxinmuyeyouxiangongsi Dirección : Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Importado a AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australia Importado a EE. UU.: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main.
Page 44
Técnico Certificado de soporte y garantía electrónica www.vevor.com/support...
ZESTAW PERKUSYJNY INSTRUKCJA OBSŁUGI MODELE: SH-002-BL, SH-002-BK We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us.
Page 46
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
Page 47
DRUM SSET ASSEMBLY INTRODUTIONS Skorzystaj z tych instrukcji, aby pomóc w montażu nowego bębna Union ustawić. Zestawy perkusyjne są różne, ale wszystkie mają wspólne podstawowe procedury konfiguracji. Pamiętaj, aby mieć dużą otwartą przestrze ń , na której możesz rozłożyć sprzęt części, zanim zaczniesz. Zestaw perkusyjny składa się...
Page 48
MONTAŻ BĘBNA BASOWEGO When installing front (logo) drum head,center logo Front of bass drum is between the top two drum lugs. determined by forward bass position of(1) drum spur leg) mounts and, (2) tom mount. Tension rod FRONT REAR Front/Logo Hoop Use the same tension rod...
Page 49
Tension rod For all tom drums, Including floor tom. Follow the procedure shown when installing the drum heads. First finger-tighten alt the tension rods.Then with drum key, give each tension roll a Washers few turns until the wrinkles in the head disappear.
Page 50
REAR Memory lock shown in place. Remember.When installing drums,the top of the drum Install cymbals is determined by the name tag reading upright. BOTTOM Install floor tom legs as shown and sot to desired height. ROCK AND ROLL Note: emphasize quarter note pulse on loose hi-hat throughout.
Page 51
Producent: Shanghaimuxinmuyeyouxiangongsi Adres : Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, szanghaj 200000 CN. Import do AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australia Import do USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main. YH CONSULTING LIMITED.
Page 53
Techniczny Certyfikat wsparcia i e-gwarancji www.vevor.com/support...
Page 54
DRUMSTEL HANDLEIDING MODELLEN: SH-002-BL, SH-002-BK We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us.
Page 55
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
Page 56
DRUM SSET ASSEMBLY INTRODUTIONS Gebruik deze instructies om u te helpen bij de montage van uw nieuwe Union-trommel set. Drumsets variëren, maar delen allemaal deze basisopstelprocedures. Vergeet niet om een grote open ruimte te hebben waar u de tuin kunt spreiden onderdelen voordat u begint. Er zitten veel onderdelen op een drumstel, maar dat is niet zo Maak je geen zorgen, als je eenmaal begonnen bent, is het proces heel intuïtief en leuk.
Page 57
BASSDRUM-ASSEMBLAGE When installing front (logo) drum head,center logo Front of bass drum is between the top two drum lugs. determined by forward bass position of(1) drum spur leg) mounts and, (2) tom mount. Tension rod FRONT REAR Front/Logo Hoop Use the same tension rod procedure for installing the...
Page 58
Tension rod For all tom drums, Including floor tom. Follow the procedure shown when installing the drum heads. First finger-tighten alt the tension rods.Then with drum key, give each tension roll a Washers few turns until the wrinkles in the head disappear.
Page 59
REAR Memory lock shown in place. Remember.When installing drums,the top of the drum Install cymbals is determined by the name tag reading upright. BOTTOM Install floor tom legs as shown and sot to desired height. ROCK-EN-ROLL Note: emphasize quarter note pulse on loose hi-hat throughout.
Page 60
Fabrikant: Shanghaimuxinmuyeyouxiangongsi Adres : Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Geïmporteerd naar AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australië Geïmporteerd naar de VS: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main.
Page 62
Technisch Ondersteuning en e-garantiecertificaat www.vevor.com/support...
Page 63
TRUMSET BRUKSANVISNING MODELL: SH-002-BL, SH-002-BK We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us.
Page 64
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
Page 65
DRUM SSET ASSEMBLY INTRODUTIONS Använd dessa instruktioner för att hjälpa dig med monteringen av din nya Union-trumma uppsättning. Trumset varierar, men alla delar dessa grundläggande installationsprocedurer. Kom ihåg att ha en stor öppen yta där du kan sprida ut delar innan du börjar. Det finns många delar på ett trumset, men gör det inte oroa dig, när du väl kommit igång är processen väldigt intuitiv och rolig.
Page 66
BASSTRUMMONTERING When installing front (logo) drum head,center logo Front of bass drum is between the top two drum lugs. determined by forward bass position of(1) drum spur leg) mounts and, (2) tom mount. Tension rod FRONT REAR Front/Logo Hoop Use the same tension rod procedure for installing the...
Page 67
Tension rod For all tom drums, Including floor tom. Follow the procedure shown when installing the drum heads. First finger-tighten alt the tension rods.Then with drum key, give each tension roll a Washers few turns until the wrinkles in the head disappear.
Page 68
REAR Memory lock shown in place. Remember.When installing drums,the top of the drum Install cymbals is determined by the name tag reading upright. BOTTOM Install floor tom legs as shown and sot to desired height. ROCK AND ROLL Note: emphasize quarter note pulse on loose hi-hat throughout.
Page 69
Tillverkare: Shanghaimuxinmuyeyouxiangongsi Adress : Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Importerad till AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australien Importerad till USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main. YH CONSULTING LIMITED.
Page 71
Teknisk Support och e-garanticertifikat www.vevor.com/support...
Need help?
Do you have a question about the SH-002-BL and is the answer not in the manual?
Questions and answers