ASUS will only be responsible for or indemnify you for loss, damages or claims based in contract, tort or infringement under this Warranty Statement. This limit also applies to ASUS’ suppliers and its reseller. It is the maximum for which ASUS, its suppliers, and your reseller are collectively responsible.
1. Safety Precautions FOR PRODUCTS CONTAINING LASER: DANGER- Invisible laser radiation when open. AVOID DIRECT EXPOSURE TO BEAM. CAUTION- Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure. CAUTION- The use of optical instruments with this product will increase eye hazard. TO ENSURE THE CONTINUED RELIABILITY OF THIS PRODUCT, USE ONLY ORIGINAL MANUFACTURER'S REPLACEMENT PARTS, WHICH ARE LISTED WITH THEIR PART NUMBERS IN THE PARTS LIST SECTION OF THIS SERVICE MANUAL...
3. Disassembly and Assembly Procedures Disassembly SOP Preparation before disassemble 1. Clean the room for disassemble 2. Identify the area for monitor 3. Check the position that the monitors be placed and the quantity of the monitor; prepare the area for material flow; according to the actual condition plan the disassemble layout 4.
Page 7
Screw: SCRW MACH FH M4*12L NI NYL) 3.Remove Stand from Rear Case. 1. Disassemble the Rear Case from panel. 2. Take off Lens Board FFC and the LED wire from Main Board. 3. Remove AL Tape from Shielding and panel...
Page 8
1. Tear off the tapes from The Rear Case. 2. Disassemble LED Board from Rear Case. 3. Unlock 2 screws Screw Screw: SCRW TAP FH driver M3*8L B-ZN) 4. Disassemble Key Board holder from Rear Case then remove Key Board. 5.
Page 9
1. Pull off the wires from panel and Board. 2. Tear off the tape on the panel 3. Pull out the fan wire from PCBA 4. Unlock 6 screws on Screw: #SCRW TAP-P PH W/FL M3*6L B-ZN Screw driver 5. Unlock the 4 screws on Shielding Screw: #SCRW MACH PAN M3*5L NI)
Page 10
1. Disassemble Lens Board and Sensor Board from Middle Frame. 2. Pull off the FFC from Board 1. Unlock the 13 screws on Middle Frame Screw: #SCRW MACH FLATM3*0.5P*4.5L ZN 2. Unlock the 7 screws on DECO Screw: #SCRW TP-B FPH M2*4L B-ZN) 3 .Remove DECO from Middle Frame...
Page 11
4.Remove Middle Frame from panel 5. Disassemble Sensor Board & Thermometer Board from panel and pull off the FFC from Bord. 1. Unlock the 4 PCBA Screw screws on Shielding driver Screw: #SCRW PH INT/TOO M3*9TP-S C- MAIN BOARD 2. Take off LVDS FFC from Main Board 3.
Page 12
7. Remove mylar on G- Sync Module 8. Unlock the 4 screws to remove G-Sync Module from Main Board Screw : SCRW M FPH W/SP M2.5*4.0L ZN MAIN BOARD...
3.2 Assembly SOP Preparation before assemble 1. Clean the room for work 2. Identify the area for material 3. Prepare the implement, equipment and materials as bellow: 1) Working table 2) Screw-driver 3) Glove 4) Cleaning cloth 5) ESD protection After unplugging the power cord, the power Board still have power energe.
Page 14
3. Assemble transmitter Board to Shielding 4. Lock the 2 screws on Shielding Screw: SCRW TAP FPH M3*4L(6/0.8) NI) 5. Locate Main Board in the Shielding. 6. Insert the wire to Main Board and Transmitter Board. 7. Lock the 4 PCBA screws on Shielding.
Page 15
Screw Driver 1. Insert the FFC wire to the Board, then Stick the Board to panel 2. Insert LENS FFC to the Board and Insert SENSOR FFC to the Board 3. Assemble Middle Frame to panel and Clock 13 screws on Middle Frame Screw: #SCRW MACH FLATM3*0.5P*4.5L ZN)
Page 16
7. Assemble LED Board and put LED Board to Middle Frame. 8. Connect FFC in Thermometer Board 9. Put Thermometer Board in panel and fix by tapes 10. Connect FFC in Light sensor Board 11. Put Light sensor Board in Middle Frame...
Page 17
Screw 1. Insert EDP to panel driver 2. Assemble the Shielding to panel 3. Lock 4 screws on Shielding Screw: #SCRW MACH PAN M3*5L NI) 4. Assemble fan to Middle Frame. Clock 6 screws on FAN Screw : #SCRW TAP-P PH W/FL M3*6L B-ZN) 5.
Page 18
7. Stick the tapes to panel cover the screw _Red mark 8. Connect Key Board FFC in Main Board 9. Connect Light effect Board wire (Red) Fan Wire (Blue) in Main Board 10. Paste the TAPE CONDUCTIVE*2 on the Main Shielding red mark...
Page 19
1. Insert the Key Board wires to control Board Assemble control Board to Holder Screw drive 2. Connect wire in LED Board. 3. Assemble control holder to rear cover 4. Lock 2 screws Screw :SCRW TAP FH M3*8L B-ZN) 5. Stick the tape on the Rear Case 6.
Page 20
1. Assemble AL tapes to Rear Case and panel 2. Insert FFC CTRL and the LED wire to Main Board. 1. Assemble .Rear Case to panel Assemble stand and fix by screws on Rear Case. Screw: SCRW MACH FH M4*12L NI NYL) Screw drive Assemble 2 Cover...
Need help?
Do you have a question about the PG35VQ and is the answer not in the manual?
Questions and answers