Download Print this page
NAD 114 Service Manual
Hide thumbs Also See for 114:

Advertisement

Quick Links

SERVICE SAFETY PRECAUTIONS (UL)
A. Leakage test "cold":
1. Unplug the AC cord; turn power switch ON.
2. Connect one lead of High Voltage Insulation Tester to both prongs of the AC plug.
3. Touch other lead to all exposed metal parts.
4. Impedance measurement must be 0.3-5.0 Megohms.
B. Leakage test, "live" :
1. Plug unit directly into the AC outlet: do not use isolation transformer.
2. Connect one lead of the Leakage Current Tester to earth ground.
3. Touch other lead to all exposed metal parts.
4. Leakage measurement must be less than 0.5 milliamps.
SERVICE
MANUAL
114
STEREO
AMPLIFIER. _
on
bk!
m
mae
O.
=
x
114 STEREO

Advertisement

loading
Need help?

Need help?

Do you have a question about the 114 and is the answer not in the manual?

Questions and answers