Preface Thank you for purchasing and using CUAV products. If you have any suggestions and feedback on our products or services, please let us know. Press Ctrl and click blue text or mobile phone scan the QR code below to visit CUAV feedback form.
Power Requirement Mount the antenna to the P9 before connecting power. Both the sky terminal and the ground terminal need to use an independent power supply instead of obtaining power from the controller. Please ensure that the maximum output current of the power supply is >2.5A (3~6s battery is recommended).
Page 4
Ground Station Connection Mission Planner After connecting to the P9, select the correct port in the upper-right corner of the ground station, select 57600 baud rate, and click [CONNECT] to CONNECT to the ground station. Port not recognized? After the P9 is connected, the mouse moves randomly and...
Page 5
QGroundControl After data transmission is connected, open the QGroundControl and the ground station will automatically identify and connect. If it is not identified, you can manually add it as follows. Click the icon in [QGroundControl]-[communication connection]-[add] In the following interface, enter [name] [type] [serial port] and [baud rate], and click OK.
Sometimes the P9 indicator will turn off does not work? Please make sure that the maximum current input at the power port is greater than 2.5A; Otherwise, the P9 may be stopped; It is recommended that the ground unit use - 8 -...
(connect V5 + flight control can not use independent power supply). Related Links Official Website Official Store Official AliExpress CUAV Doc Center Follow us https://www.youtube.com/channel/UCUom2xY7H5mI0LaDnj6Irdw - 9 -...
Need help?
Do you have a question about the P9 and is the answer not in the manual?
Questions and answers