Download Print this page
Zte ZXDU68 B201 Quick Installation Manual
Zte ZXDU68 B201 Quick Installation Manual

Zte ZXDU68 B201 Quick Installation Manual

Dc power system
Hide thumbs Also See for ZXDU68 B201:

Advertisement

Quick Links

ZXDU68 B201 (V6.0R03M01)
DC Power System
Quick Installation Guide
ZTE CORPORATION
Tel: 0755-26770800, 800-830-1118
Email: 800@zte.com.cn
Document No.: SJ-201 90518 145208-001
Website: http://support.zte.com.cn
Release Version: 2019-05-15 (R1.0)
About This Manual
This guide describes how to install the ZXDU68 B201 (V6.0R03M01) DC Power System.
Installation Instructions
To ensure personnel and equipment safety, read carefully and abide by the following
rules before installation.
Installation Environment
It is prohibited to install the equipment in acidic and corrosive environments, or in an
environment with a large amount of conductive dust.
Water, metal, and other debris are prohibited to fall into the equipment. Otherwise the
equipment may be damaged due to a short circuit.
Personnel Requirements
All personnel must be well trained, follow correct operating procedures, and observe safety
precautions during equipment installation.
Electrical Connections
Never connect or disconnect cables when the device is still powered on.
Ensure that the live wire and neutral wire are correctly connected. Ensure that the neutral
wire is properly connected, without any circuit break.
Ensure that the positive and negative poles of batteries are correctly connected.
Wear anti-static gloves and use insulated tools for electrical connection.
Ensure that screw terminals and other unnecessary bare parts are properly insulated.
Ensure that cables are reliably connected to avoid a short circuit or open circuit.
Cable Safety Requirements
The insulation layer of cables must not be damaged.
Ensure that the cross-sectional area of power cables meets the maximum load
requirements of the device.
If cables with non-standard colors are used, choose black cables and use heat shrink
tubes or insulation tapes in the corresponding color for easy identification. If the local
regulations on cable colors are different from the regulations in this manual, you must
observe the local regulations.
If a cable is bent during the routing process, you must ensure that the bending radius is
equal to or greater than 10 times of the cable diameter.
Document Acquisition
You can query and download related documents from
http://support.zte.com.cn.
If your username cannot be registered for document downloading, you can send an
email to doc@zte.com.cn.
You can add
ztedoc
in WeChat to obtain document information and propose
suggestions.
Contentions
Danger: indicates an imminently hazardous situation. Failure to comply will result in
death or serious personal injury.
Warning: indicates a potentially hazardous situation. Failure to comply can result in
death or serious personal injury.
Caution: indicates a potentially hazardous situation. Failure to comply can result in
moderate or minor personal injury.
Notice: indicates equipment or environment safety information. Failure to comply can
result in equipment damage, data loss, equipment performance degradation,
environmental contamination, or other unpredictable results.
Note: provides additional information about a topic.
Structure and Components
1
2
3
4
5
6
7
11
1. PE blots
7. DC output circuit breaker(LLVD1)
2. UIB
8. DC output circuit breaker(BLVD)
3. AC input circuit breaker
9. Battery circuit breaker
4. AC SPD
10. CSU602A
5. AC output circuit breaker(optional)
11. ZXD3000(V6.0) Rectifiers
6. Working ground GND
1. Installing the Power Subrack
 The ca binet wher e the power subrack is installe d must be gro unded pr operly.
 If th ere is a ve ntil atio n h ole near th e r ear door of the cabinet, reserve a ven tilation space
of a t least 50 mm wide beh ind the power subrack.
 If th ere is no ventilation hole near the rear door of the cabine t, reserve a ven tilation space
of a t least 80 mm wide beh ind the power subrack.
Steps
1. Fix the power subrack to the 19-inch rack on the cabinet.
It is recommended that you install the power subrack near the PE grounding bar of the cabinet,
and reserve 1U cabling space above the power subrack.
1
1
8
9
2. Connect the grounding cable between the power subrack and the cabinet.
10
ZXDU68 B201 (V6.0R03M01) DC Power System Quick Insta llati on G uide
2

Advertisement

loading
Need help?

Need help?

Do you have a question about the ZXDU68 B201 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Zte ZXDU68 B201

  • Page 1 Website: http://support.zte.com.cn Release Version: 2019-05-15 (R1.0) About This Manual This guide describes how to install the ZXDU68 B201 (V6.0R03M01) DC Power System. Installation Instructions To ensure personnel and equipment safety, read carefully and abide by the following rules before installation.
  • Page 2 ZXDU68 B201 (V6.0R03M01) DC Power System Quick Insta llati on G uide Opening the Panel 3.4 (Optional) Connecting Alarm Output Relay Cables 3.1 Connecting Communication Cables Steps Steps Loosen the screws on the panel and pull the panel out. There are eight output dry contacts on the UIB board. The components in the cabinets are Refer to the following table and connect communication cables to communication ports according connected with the output dry contact cables before delivery.
  • Page 3  The ca pacity of exte rnal AC po we r circuit br eakers must be large r than that of the AC input Red probe Switch the mu ltimeter circuit brea ke rs of the ZXDU68 B201 to a void A C power interruption due to circuit brea ke r to the buzzer mo de tripping.
  • Page 4 ZXDU68 B201 (V6.0R03M01) DC Power System Quick Insta llati on G uide 8.4 Detecting the Terminal Voltage of the Battery Pack Rectifier Installation Requirements Steps Rectifiers must be installed in the corresponding slots in a sequence from small to large.