SERVICE
MANUAL
SERVICE SAFETY PRECAUTIONS (UL)
A. Leakage test "cold":
1. Unplug the AC cord; turn power switch ON.
2. Connect one lead of High Voltage Insulation Tester to both prongs of the AC plug.
3. Touch other lead to all exposed metal parts.
4. Impedance measurement must be 0.3-5.0 Megohms.
B. Leakage test, "live" :
1. Plug unit directly into the AC outlet: do not use isolation transformer.
2. Connect one lead of the Leakage Current Tester to earth ground.
710
'TUNER
AMPLIFIER
cc
Lu
L
=
Oo.
=
<x
Need help?
Do you have a question about the 710 and is the answer not in the manual?
Questions and answers