Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment - SMC Networks 6726AL2 - annexe 1 Installation Manual

24-port 10/100 mbps fast ethernet managed switch
Table of Contents

Advertisement

Equipment Checklist

After unpacking this switch, check the contents to be sure you have
received all the components. Then, before beginning the installation, be
sure you have all other necessary installation equipment.

Package Contents

TigerSwitch 10/100, SMC6726AL2
Four adhesive foot pads
Bracket Mounting Kit containing two brackets and eight screws for
attaching the brackets to the switch
Power Cord—either US, Continental Europe or UK
RS-232 console cable
This Installation Guide
Management Guide
SMC Warranty Registration Card—be sure to complete and return to
SMC

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following
equipment available:
Four mounting screws for each device you plan to install in a
rack—these are not included
A screwdriver (Phillips or flathead, depending on the type of screws
used)
E
C
QUIPMENT
HECKLIST
3-3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 6726AL2 - annexe 1 and is the answer not in the manual?

This manual is also suitable for:

Tigerswitch smc6726al2

Table of Contents