Summary of Contents for Antennas Direct CLEARSTREAM 1MAX
Page 1
EX: VERTICAL MOUNT Mark the Mast Base (12) position on the desired surface and drill pilot holes, 1 ½” deep, for each of the 50 mm Screws (11). Place the Sealing Pads (13) over the pilot holes, and the Mast Base (12) on top of the Sealing Pads.
Need help?
Do you have a question about the CLEARSTREAM 1MAX and is the answer not in the manual?
Questions and answers