• Posi on the TRWS base on top, ensuring its threaded holes align with the holes in the flange and the Moun ng Bracket. • Secure the base plate using three M8 bolts. Tighten with a 13 mm wrench. MPS - System spol. s.r.o., Pri vinohradoch 326, 831 06, Bra slava, Slovakia, www.mps-system.sk...
Page 4
Leaves for a achment. Between six leaves, use 5 pcs of long spacers, and on both ends, use 2 short spacers each. • Ensure the flat sides of the Leaves face inward, towards the rain gauge. MPS - System spol. s.r.o., Pri vinohradoch 326, 831 06, Bra slava, Slovakia, www.mps-system.sk...
Page 5
• Fix the Ring Segments in place using M8 bolts on the ver cal arms. Tighten with a 13 mm wrench. 6. Install the Steel Cable • Thread the Steel Cable (8) through the holes at the lower ends of each Leaf (5). MPS - System spol. s.r.o., Pri vinohradoch 326, 831 06, Bra slava, Slovakia, www.mps-system.sk...
• Ensure the Leaves are evenly spaced and properly aligned for op mal wind shielding. • Make sure the stand is securely fastened and anchored to the ground to prevent the en re assembly from vibra ng in the wind. MPS - System spol. s.r.o., Pri vinohradoch 326, 831 06, Bra slava, Slovakia, www.mps-system.sk...
Need help?
Do you have a question about the TRWS 10 and is the answer not in the manual?
Questions and answers