FENECON Home 6, 10 & 15 assembly and
operating instructions
Version:2024.01.1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Home 6 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for fenecon Home 6

  • Page 1 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 2 2.5. Area of application — Electromagnetic compatibility (EMC)........  2.6. General information on the FENECON Home 6, 10 & 15 electrical energy storage system .... ...
  • Page 3 3.4. Technical data — FENECON parallel switch box (optional) ........
  • Page 4 7.1.2. Assembly of battery tower(s) 3 to 4 with FENECON Extension box ......
  • Page 5 13.2. FENECON Home 6, 10 & 15 inverter ....... . .
  • Page 6 18.2. Tabellenverzeichnis...............   FENECON Home 6, 10 & 15 assembly and operating instructions 5 / 138...
  • Page 7 E-mail: info@fenecon.de Internet: www.fenecon.de 1.2. Formal information on the operating instructions © FENECON GmbH, 2024 All rights reserved. Reprinting, even in part, is only permitted with the permission of FENECON GmbH. 1.3. Version/revision Version/ Revision Change Date Name 2024.06.1 Draft creation 10.06.2024...
  • Page 8 The possible consequences of ignoring the warning are, for example, crushing, burns or other serious injuries. Measures/Prohibitions Measures/prohibitions include actions that must be taken to avoid a hazard (e.g. stopping the drive) or that are prohibited to avoid a hazard. FENECON Home 6, 10 & 15 assembly and operating instructions 7 / 138 Version:2024.01.1...
  • Page 9 State of charge The available capacity in a battery, expressed as a percentage of the nominal capacity. State of Health — State of ageing German Association for Electrical, Electronic & Information Technologies e. V. Component of Online Monitoring Widget table 3. Terms and abbreviations 8 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 10 Der Betreiber bewahrt diese Betriebsanleitung bzw. relevante Teile davon griffbereit in unmittelbarer Nähe zum Produkt auf. Bei der Abgabe des Produktes an eine andere Person gibt der Betreiber diese Betriebsanleitung an diese Person weiter. FENECON Home 6, 10 & 15 assembly and operating instructions 9 / 138 Version:2024.01.1...
  • Page 11 (charging) and the provision of electrical energy (discharging). This charging and discharging process takes place via a connected FENECON Home 6, 10 & 15 inverter. All processes of the electricity storage system are monitored and controlled by the FEMS. The system may only be used in compliance with the permitted...
  • Page 12 2.5. Area of application — Electromagnetic compatibility (EMC) The low-voltage equipment is intended for use in the following areas of application: - General (public) — Use in other areas of application is not intended. FENECON Home 6, 10 & 15 assembly and operating instructions 11 / 138 Version:2024.01.1...
  • Page 13 2.6. General information on the FENECON Home 6, 10 & 15 electrical energy storage system 2.6. General information on the FENECON Home 6, 10 & 15 electrical energy storage system The product must be positioned in such a way that sufficient room for movement can be guaranteed for service and maintenance personnel in every phase of the product’s life.
  • Page 14 • Do not expose the battery modules to high voltages. • Place the battery modules on level surfaces. • Do not place any objects on the FENECON Home 6, 10 & 15 battery tower. • Do not step on the power storage system.
  • Page 15 • Keep heat and fire sources, flammable, explosive and chemical materials away from the power storage system. • Do not dispose of the FENECON Home 6, 10 & 15 battery modules in a fire due to the risk of explosion.
  • Page 16 2.6. General information on the FENECON Home 6, 10 & 15 electrical energy storage system 2.6.3. Storage • Area: Fireproof indoors/outdoors; with suitable weather protection • Air temperature: -20 °C to 40 °C • Relative humidity: max. 50 % at +40 °C. • Do not store battery modules (lithium iron phosphate batteries) with flammable or toxic objects •...
  • Page 17 ◦ After eye contact: Immediately flush eye(s) with running water for 15 minutes and seek medical advice.  Delayed treatment can cause serious damage to health. 16 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 18 1. Das Stromspeichersystem vom Netz trennen 2. Remove from the danger zone 3. Secure the danger zone 4. The responsible persons inform 5. Alert a doctor if necessary FENECON Home 6, 10 & 15 assembly and operating instructions 17 / 138 Version:2024.01.1...
  • Page 19 Flammen, Feuer, offene Zündquellen und Rauchen sein können Getrennte Sammlung von Elektro- und An den Batterien Elektronikgeräten Anleitung beachten Kopfschutz benutzen Fußschutz benutzen Handschutz benutzen table 6. Pictograms 18 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 20 Access to the programming levels is not barrier-free and is accessible at different levels depending on the qualifications of the operating personnel. Safety-relevant program changes require additional verification. FENECON processes energy data of European customers exclusively on servers in Germany and these are subject to the data protection regulations applicable in this country.
  • Page 21 < 30 dB Max. Grid connection 120 A Overall system VDE 4105:2018-11 Inverter Certification/guideline TOR generator type A 1.1 UN38.3 Battery VDE 2510-50 table 7. Technische Daten — Allgemein 20 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 22 497 mm | 221 mm | 497 mm | 221 mm | 461 mm 461 mm 461 mm General Weight 23 kg 25 kg 25 kg Topology non-isolated non-isolated non-isolated table 8. Technical data — Inverter *auch im Netzparallelbetrieb FENECON Home 6, 10 & 15 assembly and operating instructions 21 / 138 Version:2024.01.1...
  • Page 23 3.2. Technical data — Inverter 3.2.1. Dimensions The dimensions are given in mm. illustration 1. Inverter — Dimensions 22 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 24 506 mm | 401 mm | 157 mm Weight 12 kg Installation stackable table 9. Technical data — FENECON EMS box 3.3.1. Dimensions The dimensions are given in mm. illustration 2. Dimensions — EMS box FENECON Home 6, 10 & 15 assembly and operating instructions 23 / 138 Version:2024.01.1...
  • Page 25 Communication to the inverter, relay outputs; digital inputs (16-pin connector) Power supply FEMS box; potential-free contacts (max. 10 A, measured) (10-pin plug) Earth connection For future applications (not assigned) table 10. Anschlussbelegung — EMS-Box 24 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 26 506 mm |401 mm |157 mm Weight 10 kg Installation stackable table 11. Technical data — Parallel switch box 3.4.1. Dimensions The dimensions are given in mm. illustration 4. Dimensions — Parallel switch box FENECON Home 6, 10 & 15 assembly and operating instructions 25 / 138 Version:2024.01.1...
  • Page 27 Communication output for parallel connection of several battery towers Communication input for parallel connection of several battery towers Battery connection for additional battery towers (MC4-Evo stor) Earthing connection table 12. Terminal assignment — Parallel switch box 26 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 28 506 mm | 401 mm | 157 mm Weight 9 kg Installation stackable table 13. Extension box (optional) — Technical data 3.5.1. Dimensions The dimensions are given in mm. illustration 6. Dimensions — Extension box FENECON Home 6, 10 & 15 assembly and operating instructions 27 / 138 Version:2024.01.1...
  • Page 29 Battery connection to EMS box in parallel (MC4-Evo stor) Communication output for parallel connection of several battery towers Communication input for parallel connection of several battery towers Earthing connection table 14. Anschlussbelegung — Extension-Box 28 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 30 Width (incl. side panel) | Depth | Height 506 mm |401 mm |143 mm Weight 13 kg Installation stackable/wall mounting table 15. Technical data — BMS box 3.6.1. Dimensions The dimensions are given in mm. illustration 8. Dimensions — BMS box FENECON Home 6, 10 & 15 assembly and operating instructions 29 / 138 Version:2024.01.1...
  • Page 31 - External charging of the battery modules to nominal voltage. This may only be carried out by the manufacturer or a company authorized by the manufacturer. 30 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 32 3.7. Technical data — FENECON battery module 3.7.1. Dimensions The dimensions are given in mm. illustration 9. Battery — Dimensions FENECON Home 6, 10 & 15 assembly and operating instructions 31 / 138 Version:2024.01.1...
  • Page 33 431.2 V ~ 554.4 V Maximum continuous 17.92 kW 20.16 kW 22.40 kW 24.64 kW charging/discharging power table 18. Electrical parameters — Number of battery modules 8S to 11S (8 to 11 modules in series) 32 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 34 548.8 V ~ 705.6 V Maximum continuous charging/discharging 26.88 kW 29.12 kW 30.00 kW power table 19. Electrical parameters — Number of battery modules 12S to 14S (12 to 14 modules in series) FENECON Home 6, 10 & 15 assembly and operating instructions 33 / 138 Version:2024.01.1...
  • Page 35 506 mm | 365 mm | 84 mm Weight 6 kg Protection specification IP55 (plugged) Installation stackable table 20. Technical data — Base 3.8.1. Dimensions The dimensions are given in mm. illustration 10. Dimensions — Base 34 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 36 4. Allgemeine Beschreibung 4. Allgemeine Beschreibung FENECON Home 6, 10 & 15 is an emergency-power-capable electrical energy storage system that can build its own household power grid. Lithium iron phosphate batteries (LiFePO4) are used in this modular system for storing electrical energy.
  • Page 37 Due to the limited power of the inverter, such loads are only possible within certain limits. The manufacturer is not responsible for the domestic installation. 36 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 38 Additional PV system Electrical energy storage PV system Inverter Load(s) (supplied with emergency power) Load(s) (not supplied with emergency power) table 22. System structure with additional PV generator FENECON Home 6, 10 & 15 assembly and operating instructions 37 / 138 Version:2024.01.1...
  • Page 39 PV inverter PV system Electrical energy storage Inverter Load(s) (supplied with emergency power) Load(s) (not supplied with emergency power) table 23. System structure as an AC system 38 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 40 Bi-directional meter Current transformer Inverter PV system Electrical energy storage Manual emergency power switch Load(s) (supplied with emergency power) table 24. System with manual emergency power changeover FENECON Home 6, 10 & 15 assembly and operating instructions 39 / 138 Version:2024.01.1...
  • Page 41 *For installing the automatic off-grid switch, use the associated assembly and operating instructions. These can be found on the FENECON website in the download center at: https://fenecon.de/files-avu/.  The automatic off-grid switch is only compatible with Home 6 and Home 10 systems. 40 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions...
  • Page 42 (per tower) table 26. System configuration — Required components illustration 17. FENECON Home 6, 10 & 15 electrical energy storage system setup with four battery towers FENECON Home 6, 10 & 15 assembly and operating instructions 41 / 138 Version:2024.01.1...
  • Page 43 5. Assembly preparation 5. Assembly preparation 5.1. Scope of delivery 5.1.1. FENECON Home 6, 10 & 15-Inverter — Variants A & B There are two variants of the inverter in circulation. The functions and technical data of the two  variants are exactly the same. The connection area of the communication lines and the current transformers differ minimally.
  • Page 44 6-pin push-in connector PE cable lug Screw with screw anchor Cover AC connection M5 screw for earthing table 27. Scope of delivery — FENECON Home 6, 10 & 15 — Inverter — Variant A FENECON Home 6, 10 & 15 assembly and operating instructions 43 / 138 Version:2024.01.1...
  • Page 45 FENECON Home 6, 10 & 15-Inverter Tools for PV and battery plugs Wall mount Split-core CT Cover communication port 2(3) MC4 plug 2(3) MC4 socket FEMS-Cable 44 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 46 6-pin push-in connector PE cable lug Screw with screw anchor Cover AC connection M5 screw for earthing table 28. Scope of delivery — FENECON Home 6, 10 & 15 — Inverter — Variant B FENECON Home 6, 10 & 15 assembly and operating instructions 45 / 138 Version:2024.01.1...
  • Page 47 Harting housing with cable gland 19-25 mm, multi-hole seal 2 x 10 & 1 x 8 mm Harting socket 10-pin Harting insert 16-pin (assembled) Jumper plug Network connector housing Filler plug, 8 mm 46 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 48 Battery cable set, 3 m Installation and service instructions (QR code) Operating instructions (for the end customer, (QR code)) Quick start guide table 29. Scope of delivery — FENECON EMS box FENECON Home 6, 10 & 15 assembly and operating instructions 47 / 138 Version:2024.01.1...
  • Page 49 5.1.4. FENECON — Extension box (optional) illustration number designation FENECON-Extension box Side panel each set of two DC cables, 2 m Communication cable, 2 m table 31. Scope of delivery — Extension box 48 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 50 Side panel (base) Wall mounting Mounting bracket (FENECON-BMS box part) Wall mounting mounting bracket (wall part) Fixing plates Screws M4 x 10 table 32. Scope of delivery — BMS module/base FENECON Home 6, 10 & 15 assembly and operating instructions 49 / 138 Version:2024.01.1...
  • Page 51 5.1. Scope of delivery 5.1.6. FENECON battery module illustration number designation Battery module Side panel fixing plates Screws M4 x 10 table 33. Scope of delivery — Battery module 50 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 52 Wire stripper Protective gloves Torque wrench Insulation stripping knife table 34. Tools required FENECON Home 6, 10 & 15 assembly and operating instructions 51 / 138 Version:2024.01.1...
  • Page 53 All local accident prevention regulations must be observed. The following components must be installed: • Inverter • Battery tower with base, battery modules, BMS box and FENECON EMS box • Optional: ◦ Battery tower with base, battery modules, BMS box and parallel switch box •...
  • Page 54  • Wait at least 5 minutes after switching off before starting work on the inverter. • Observe the safety instructions of FENECON GmbH in chapter 2.3. • Do not touch any exposed live parts or cables. • Do not pull the terminal strip with connected DC conductors out of the slot under load.
  • Page 55 • Do not operate the system if the battery modules are deeply discharged. • If the battery modules are deeply discharged, contact Service • Only charge deeply discharged battery modules as instructed by the Service. 54 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 56 An overvoltage can damage a meter and cause voltage to be applied to the meter  housing. • Nur Messgeräte mit einem DC-Eingangsspannungsbereich bis mindestens 600 V oder höher einsetzen. FENECON Home 6, 10 & 15 assembly and operating instructions 55 / 138 Version:2024.01.1...
  • Page 57 The use of cleaning agents can damage the inverter and/or its parts.  • Den Wechselrichter und all seine Teile ausschließlich mit einem mit klarem Wasser befeuchteten Tuch reinigen. 56 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 58 6.1.2. Installation conditions and distances at the installation site Indoor or outdoor installation We recommend installing the FENECON Home 6, 10 & 15 battery towers in a well-ventilated room without external heat sources. However, the battery tower(s) can also be installed outdoors protected from the weather (e. g.
  • Page 59 6.1. Montage Wechselrichter illustration 19. Recommended distances at the installation site 58 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 60 (10 m). • The pre-installed current transformers must not be shortened or extended. • Install the inverter vertically on the wall and not rotated. FENECON Home 6, 10 & 15 assembly and operating instructions 59 / 138 Version:2024.01.1...
  • Page 61 6.1. Montage Wechselrichter 6.1.3. Assembly To install the FENECON Home 6, 10 & 15 inverter on the wall, proceed as follows: Assembly of the wall bracket Mark and drill holes for wall mount (Ø 8 mm, depth 80 mm) 2. Observe minimum distances.
  • Page 62 6.1. Montage Wechselrichter Then secure on the right-hand side using the enclosed screw. FENECON Home 6, 10 & 15 assembly and operating instructions 61 / 138 Version:2024.01.1...
  • Page 63 • The Ethernet interface of the inverter is classified as "TNV-1" and offers protection against overvoltages of up to 1.5 kV. 62 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 64 • Only carry out work on the inverter (e.g. troubleshooting, repair work) with personal protective equipment for handling hazardous substances (e.g. protective gloves, eye and face protection and respiratory protection). • Sicherstellen, dass Unbefugte keinen Zutritt zum Wechselrichter haben. FENECON Home 6, 10 & 15 assembly and operating instructions 63 / 138 Version:2024.01.1...
  • Page 65 • Note the weight of the battery modules and its center of gravity. • Wear suitable personal protective equipment for all work on the battery modules. 64 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 66 Installation  • Bei der Montage der Batteriemodule Schutzbrille, isolierende Handschuhe und Sicherheitsschuhe tragen. • Remove all conductive jewelry (e.g. watches, bracelets, rings). FENECON Home 6, 10 & 15 assembly and operating instructions 65 / 138 Version:2024.01.1...
  • Page 67 6.2.2. Conditions at the installation site Indoor or outdoor installation We recommend installing the FENECON Home 6, 10 & 15 battery tower indoors. However, the battery tower can also be installed outdoors protected from the weather (e. g. garage). 6.2.3. Installation conditions and distances at the installation site illustration 20.
  • Page 68 • A distance of 500 mm from a wall is recommended at the front. • The FENECON Home 6, 10 & 15 battery tower and inverter should be installed/mounted on top of each other. If there is not enough space above, the battery tower and inverter can also be installed next to each other.
  • Page 69 6.2. Montage Batterieturm 6. Mount all remaining FENECON battery modules in the same way. Between 3 and 14 battery modules can be stacked. Electric shock  Death or serious injury to the body and limbs due to electric shock. • Ensure that the circuit breaker of the BMS box is switched off before installing the BMS box.
  • Page 70 For 10 or more battery modules, two holders must be used per side. 14. Insert the side panels of the base, the battery modules, the BMS box and the EMS box. FENECON Home 6, 10 & 15 assembly and operating instructions 69 / 138 Version:2024.01.1...
  • Page 71 6.2. Montage Batterieturm illustration 22. Arrangement of the module fastening  You will find the assembly instructions for 2 or 3 battery towers in Chapter 7.1. 70 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 72 Erdungsbolzen befestigen (rot). The grounding cable requires a cross-section of at least 10 mm  The inverter and the battery towers must be grounded individually to the equipotential bonding. FENECON Home 6, 10 & 15 assembly and operating instructions 71 / 138 Version:2024.01.1...
  • Page 73 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 illustration 23. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 72 / 138 FENECON Home 6, 10 &...
  • Page 74 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 6.4.1. Connection and wiring of the AC circuit illustration 24. AC-Anschluss allgemein Item Description Bi-directional meter from energy supplier Fuse of the inverter 3-pole. (6 kW — 20 A; 10/15 kW — 32 A)* Load(s) fuse (no emergency power) with RCD type A and suitable MCBs Service switch for switching the emergency power loads to the mains (recommended) Load(s) protected by suitable MCBs and RCD type A 30 mA *...
  • Page 75 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 observed. (If an RCD is required by the grid operator, an RCD type A with a tripping current of 300 mA is recommended; at 30 mA, unwanted shutdowns may occur).
  • Page 76 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 illustration 25. Recommended maintenance switch for emergency power outlet Pos. Beschreibung Notstromverbraucher werden über Wechselrichter notstromversorgt (Normalstellung) Notstromverbraucher sind vom Wechselrichter und Netz getrennt Notstromverbraucher werden vom Netz versorgt table 36.
  • Page 77 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 illustration 26. AC connection Energy meter Item Description 2 bi-directional meter from energy supplier Fuse protection of the inverter C20/C32 3-pole Fuse the consumption (no emergency power) with RCD type A and suitable MCBs...
  • Page 78 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 2. Strip the sheath and cores 3. Make sure that the PE is slightly longer than the other cores. Section Description Dimensions outer diameter 18 mm length stripped BACKUP: 75 mm...
  • Page 79 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 A 4-pole maintenance switch is recommended. Care must be taken to ensure that no neutral  displacement can occur during switching. The correct maintenance switch must be selected by a specialist company, taking into account the conditions on site.
  • Page 80 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 6.4.2. AC connection of the FENECON EMS box An external 230-V-power-supply is required to supply the FENECON EMS box. Dies hat den Zweck, die leere Batterie nicht durch zusätzliche Verbraucher zu belasten. Das kann insbesondere im Winter, wenn keine Sonne scheint, oder wenn Schnee auf der PV-Anlage liegt, vorkommen.
  • Page 81 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 5. The other pins are for the 7. connect the plug to the integrated relay contacts. FEMS box. If these are not used, the socket can be screwed into 8.
  • Page 82 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 6.4.4. Connection and cabling of PV system The various PV strings can be connected directly to the PV inputs on the inverter. The 6 kW variant has 2 MPPTs, each with one input (red; blue).
  • Page 83 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 6.4.5. Communication between inverter and EMS box 1. Feed the enclosed communication cable (3 m network cable with open end) through one of the holes in the multi- hole seal of the communication port cover.
  • Page 84 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 4. Attach the cover to the inverter and tighten the screw connection. 5. Feed the cable through one of the four holes in the multi- hole seal.
  • Page 85 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 7. The other end with two open pins must be connected to terminal 1/2 on the Harting plug (16-pin — A). 8. Connect the white core to terminal 1.
  • Page 86 6.4. Approved grid shapes for connecting the FENECON Home 6, 10 & 15 6.4.6. Communication from a battery tower If only one battery tower is installed, the jumper plug (included) must be plugged into the PARALLEL OUT connection and locked by turning the underside.
  • Page 87 (If an RCD is required by the grid operator, an RCD type A with a tripping current of 300 mA is recommended; at 30 mA, unwanted shutdowns may occur). 86 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 88 6. Connect the split-core CTs according to the labeling on the transformers and the plugs of the enclosed communication cable. CT1-L1 CT2-L2 CT3-L3 table 39. Standard folding transformer — Variant A FENECON Home 6, 10 & 15 assembly and operating instructions 87 / 138 Version:2024.01.1...
  • Page 89 K — from the sub-distribution board L — to the grid operator’s meter (grid connection) 6. Connect the split-core CT plug to the network cable. table 40. Standard folding transformer — Variant B 88 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 90 The inner diameter of the split-core CTs is 16 mm. The transformers and the meter cannot be replaced by other types. Make sure that phase L1 is also phase L1 on the inverter. FENECON Home 6, 10 & 15 assembly and operating instructions 89 / 138 Version:2024.01.1...
  • Page 91 (If an RCD is required by the grid operator, an RCD type A with a tripping current of 300 mA is recommended; at 30 mA, unwanted shutdowns may occur). 90 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 92 A standard CAT6 network cable or installation cable with crimped-on plug can be used for the following step. 6. Feed the network cable through the cover and its multi- hole seal insert. FENECON Home 6, 10 & 15 assembly and operating instructions 91 / 138 Version:2024.01.1...
  • Page 93 The inner diameter of the split-core CT is 16 mm. The transformers and the meter cannot be replaced by other types. Make sure that phase L1 is also phase L1 on the inverter. 92 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 94 The network connector housing and the filler plug must be installed beforehand.  An IP classification is only guaranteed if the corresponding plugs are locked at all connections. FENECON Home 6, 10 & 15 assembly and operating instructions 93 / 138 Version:2024.01.1...
  • Page 95 FENECON parallel switch box instead of the FENECON EMS box. 7.1.2. Assembly of battery tower(s) 3 to 4 with FENECON Extension box If there is a third to fifth battery tower, the Extension box is attached to the third to fourth battery tower instead of the EMS box.
  • Page 96 6. To do this, connect the two cables to the first battery (EMS box) (BAT OUT) and to the second battery (parallel switch box) (BAT IN) (green). FENECON Home 6, 10 & 15 assembly and operating instructions 95 / 138 Version:2024.01.1...
  • Page 97 4 m. 2. To do this, connect the two cables between the Extension box (BAT OUT) and the parallel switch box (BAT IN). 96 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 98 3. Likewise on all other towers, always between PARALLEL OUT and PARALLEL IN. (blue/orange) 4. At the last tower, plug the jumper plug into PARALLEL OUT. (red) FENECON Home 6, 10 & 15 assembly and operating instructions 97 / 138 Version:2024.01.1...
  • Page 99 • Before commissioning the system, ensure that the battery modules are not deeply discharged. • If the battery modules are deeply discharged, contact the FENECON Service. • Only charge deeply discharged battery modules as instructed by the FENECON Service. This is indicated in the installation and service instructions: ...
  • Page 100 The inverter only starts after configuration and only then synchronizes to the grid. FENECON Home 6, 10 & 15 assembly and operating instructions 99 / 138 Version:2024.01.1...
  • Page 101 8.3. Configuration via commissioning wizard Open the FENECON homepage and click on the login for FEMS Online Monitoring "FEMS login" in the top right- hand corner. Alternatively, you can use the following QR code or link to access the page.
  • Page 102 5. Once all the necessary points have been confirmed, the account will be created automatically 6. You will be forwarded directly to the storage system configuration. 7. Click on the blue plus at the bottom. 8. Add FEMS. FENECON Home 6, 10 & 15 assembly and operating instructions 101 / 138 Version:2024.01.1...
  • Page 103 • You will receive a protocol of the complete commissioning for your records by e-mail.  • The customer also receives an e-mail with the personal access data for end customer monitoring. 102 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 104 You can choose between "Immediate start" and "Planned extension". 3. Then confirm the settings by clicking the tick button. FENECON Home 6, 10 & 15 assembly and operating instructions 103 / 138 Version:2024.01.1...
  • Page 105 7. Remove the EMS box and BMS box and place them on their sides. To do this, screw the wall bracket of the BMS box from the wall. 104 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 106 9. Proceed as described in chapter 6.2.4 from step 8. • Attach FENECON BMS box • Attach FENECON EMS box • Add fixig plates • Attach side panels FENECON Home 6, 10 & 15 assembly and operating instructions 105 / 138 Version:2024.01.1...
  • Page 107 The overall capacity can be expanded later by one or more battery towers with the same capacity. Up to four battery towers can be operated in parallel. If further battery modules are added after commissioning, follow this procedure: 106 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 108 6. Wire the communication between the battery towers as described in chapter 7.3.1. 7. Everything can then be switched on again as described in chapter 8.2.1. FENECON Home 6, 10 & 15 assembly and operating instructions 107 / 138 Version:2024.01.1...
  • Page 109 The battery towers work independently, so the flashing frequency of the different towers may vary. The SoC display of the individual towers may also differ briefly. 108 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 110 Relay 1 (230 V; 6 A) Relay 2 (230 V; 6 A) Relay 3 (230 V; 6 A) Neutral conductor connection (required for integrated meter) PE connection table 42. Connector pin assignment — Power connector FENECON Home 6, 10 & 15 assembly and operating instructions 109 / 138 Version:2024.01.1...
  • Page 111 12 V DC (12 V; GND) 4 x digital inputs Not assigned Relay 5 (24 V; 1 A) Relay 6 (24 V; 1 A) PE connection table 43. Connector pin assignment — Control connector 110 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 112  Once the components have been installed, all you still require is the app. To do so, proceed as described in Chapter 10.6. FENECON Home 6, 10 & 15 assembly and operating instructions 111 / 138 Version:2024.01.1...
  • Page 113 To do so, proceed as described in Chapter 10.6.  Manual mode is only suitable for temporary operation. For permanent operation, the external relay control must be used. 112 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 114  Once the components have been installed, all you still require is the app. To do so, proceed as described in Chapter 10.6. FENECON Home 6, 10 & 15 assembly and operating instructions 113 / 138 Version:2024.01.1...
  • Page 115  Once the components have been installed, all you still require is the app. To do so, proceed as described in Chapter 10.6. 114 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 116 (alternative color possible) is then connected to 3. 5. A terminal resistor with 120 Ω must be installed between (+) and (-) (A/B) on the last bus device. FENECON Home 6, 10 & 15 assembly and operating instructions 115 / 138 Version:2024.01.1...
  • Page 117  Once the components have been installed, all you still require is the app. To do so, proceed as described in Chapter 10.6. 116 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 118 3. Click on the three dashes at the top left. 4. Select "Settings". 5. "FEMS App Center" click. 6. Click on "Redeem license key" to open a new window. FENECON Home 6, 10 & 15 assembly and operating instructions 117 / 138 Version:2024.01.1...
  • Page 119 9. Select the app to be installed 10. You will then be redirected to the installation wizard for the respective app. 11. Make settings. 12. Then click on "Install app". 118 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 120 2. Two 6-pin plugs are required for the ripple control 5. Then confirm with OK. receiver to function. 3. The connectors are numbered consecutively. FENECON Home 6, 10 & 15 assembly and operating instructions 119 / 138 Version:2024.01.1...
  • Page 121 In the event of a curtailment to 0 %, the grid feed-in of the inverter is completely stopped, i. e.  the consumption is completely supplied from the grid. Only the battery continues to be charged. 120 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 122 0.34  of the 0.75  multi- hole 0.75  seal. recom mend recom Cauti mend on:_ feed- throu gh is alread block ed by FENECON Home 6, 10 & 15 assembly and operating instructions 121 / 138 Version:2024.01.1...
  • Page 123 1. the signal can be connected to pins 1 ( C ) and 8 ( A ) via the Harting plug (16-pin — A & C). 2. For detailed information on connecting the FNN control box, please refer to the manufacturer’s installation instructions. 122 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 124 The terms and conditions still need to be confirmed here, then the monitoring is available without restrictions. 12.1.2. Access for the installer The installer account can be created on the FENECON homepage as described in Chapter 8.3. Access is required for successful commissioning.
  • Page 125 OK, an orange exclamation mark indicates a warning (Warning) and a red exclamation mark indicates an error (Fault). 13.1.1. Fault display System status: Everything is OK System state: Warning System state: Error (Fault) 124 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 126 Under certain circumstances it can happen that the FEMS is not accessible and the adjacent error message appears. If the FEMS is offline, follow the steps displayed below the message. FENECON Home 6, 10 & 15 assembly and operating instructions 125 / 138 Version:2024.01.1...
  • Page 127 13.2. FENECON Home 6, 10 & 15 inverter 13.2.1. Fault display Faults are indicated by a red LED next to "SYSTEM". illustration 29. Fault display on the FENECON Home 6, 10 & 15 inverter 126 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions...
  • Page 128 13.2. FENECON Home 6, 10 & 15 inverter Drehfeld des Netzanschlusses • Überprüfen Sie, ob am Netzanschluss ein Rechtsdrehfeld anliegt. • Otherwise, contact the FENECON service. The contact details can be found in Chapter 12.5. The LEDs display further information on the status of the inverter. Display...
  • Page 129 13.3. Battery tower 13.3. Battery tower 13.3.1. Fault display Faults are displayed on the FENECON Home 6, 10 & 15 BMS box via a red LED. The various errors are indicated by LED codes. 128 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions...
  • Page 130   isolation error      BMS error  Blue permanently on  Blue flashing  Blue flashing quickly  Red permanently on FENECON Home 6, 10 & 15 assembly and operating instructions 129 / 138 Version:2024.01.1...
  • Page 131 13.4. Fault list 13.3.2. Troubleshooting If faults cannot be rectified or in the event of faults that are not recorded in the fault list, the FENECON service must be contacted. See Chapter 12.5. 13.4. Fault list Component Fault/error Measure Do not touch...
  • Page 132 Check the product and the cables regularly for visible external damage. If components are defective, contact FENECON service. Repairs may only be carried out by a qualified electrician. 14.2. Cleaning Reinigungsmittel: Durch die Verwendung von Reinigungsmitteln kann der Stromspeicher und seine Teile beschädigt werden.
  • Page 133 The following information must be provided to the operator: Komponente Information/Dokument Bemerkung Anlage FEMS-Nummer Anlage Login-Daten für Online-Monitoring Anlage Bedienungsanleitung table 46. Information for the operator 132 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 134 Dangerous Goods Transportation Act (GGBefG). Legal regulations The product is transported in accordance with the legal regulations of the country in which the product is transported off-site. FENECON Home 6, 10 & 15 assembly and operating instructions 133 / 138 Version:2024.01.1...
  • Page 135 • The dismantling instructions of the component manufacturers (see appendix, Other applicable documents) must be observed. • The current laws, regulations and standards must be observed when transporting the battery modules (e.g. Dangerous Goods Transportation Act - GGBefG). 134 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...
  • Page 136 17.3. Waste disposal 17.3. Waste disposal • The FENECON storage system must not be disposed of with normal household waste. • The FENECON Home 20 & 30 is RoHS- and REACH-compliant. • Disposal of the product must comply with local regulations for disposal.
  • Page 137 System with manual emergency power switchover (shown without protective device) illustration 16. Systemaufbau mit der Automatischen Verbraucher-Umschaltung (AVU) illustration 17. FENECON Home 6, 10 & 15 electrical energy storage system setup with four battery towers illustration 18. Installation conditions illustration 19.
  • Page 138 Components for AC connection (not included in the scope of delivery) table 42. Connector pin assignment — Power connector table 43. Connector pin assignment — Control connector table 44. LED status displays — Inverter table 45. Troubleshooting FENECON Home 6, 10 & 15 assembly and operating instructions 137 / 138 Version:2024.01.1...
  • Page 139 18.2. Tabellenverzeichnis table 46. Information for the operator 138 / 138 FENECON Home 6, 10 & 15 assembly and operating instructions Version:2024.01.1...

This manual is also suitable for:

Home 10Home 15