Download Print this page

Advertisement

Quick Links

ENGLISH
27013 CHIGNOLO PO (PV) LOCALITA' CASOTTINA 36/B
COD. FISC. E P.IVA 01811760188 –REA N. 223311 – R.I. (PV-1999-16207)
CAPITALE SOCIALE 10.330,00 interamente versato
TEL.0039 0382-766550 FAX 0039 0382 723465
www.cmpforni.com www.argonht.com info@cmpforni.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the Argon HT Buffer 40-80 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for CMP Argon HT Buffer 40-80

  • Page 1 ENGLISH 27013 CHIGNOLO PO (PV) LOCALITA’ CASOTTINA 36/B COD. FISC. E P.IVA 01811760188 –REA N. 223311 – R.I. (PV-1999-16207) CAPITALE SOCIALE 10.330,00 interamente versato TEL.0039 0382-766550 FAX 0039 0382 723465 www.cmpforni.com www.argonht.com info@cmpforni.com...
  • Page 2 27013 CHIGNOLO PO (PV) LOCALITA’ CASOTTINA 36/B COD. FISC. E P.IVA 01811760188 –REA N. 223311 – R.I. (PV-1999-16207) CAPITALE SOCIALE 10.330,00 interamente versato TEL.0039 0382-766550 FAX 0039 0382 723465 www.cmpforni.com www.argonht.com info@cmpforni.com IDENTIFICATION PAGE Customer: Machine model: Serial number of machine: Buffer v1 pag.2 13/09/24...
  • Page 3 INDEX PLATE PART NUMBER IDENTIFICATION ....................4 SAFETY INFORMATION ..........................5 BUFFER 40-80: TECHNICAL DATA......................7 BUFFER 40-80: DIMENSIONS ........................7 BUFFER 40-20: TECHNICAL DATA......................8 BUFFER 40-20: DIMENSIONS ........................8 LOADING UNLOADING ..........................9 HANDLING ..............................9 UNPACKING..............................9 HIGHNESS ADJUSTMENT AND ALIGNMENT ..................
  • Page 4 PLATE PART NUMBER IDENTIFICATION Buffer v1 pag.4 13/09/24...
  • Page 5 SAFETY INFORMATION Skilled staff are said all the people that, according to their training, experience, preparation and knowledge of laws and dispositions on the matter, of anti-accident laws, have been authorised by person in charge of the plant safety to play the necessary activities; besides they have to be able to recognise and to avoid possible dangers (for the definition of the qualified labour, see DIN VDE 0105 O IEC 364).
  • Page 6 N.B. The content of the instruction for use and all the documentation about the product is not part of an accord, a promise or a legal relation and hase not as aim their modification SAFETY INFORMATION FOR ELECTRIC EQUIPMENT USED IN HIGH VOLTAGE INSTALLATION This informative leaf completes the instruction for use of the product and has to be observed with a particular care.
  • Page 7 BUFFER 40-80: TECHNICAL DATA PCB min. dimensions (LxH): 250x250 mm PCB max. dimensions (LxH): 710x650 mm PCB thickness: from 0,8 (rigid) to 3 mm PCB weight 1,2 kg N° single step position: N° double step position: Installed power: 0,25 kW Wiring (standard): 400 V 50/60 Hz 3ph+T+N Weight:...
  • Page 8 BUFFER 40-20: TECHNICAL DATA PCB min. dimensions (LxH): 250x250 mm PCB max. dimensions (LxH): 710x650 mm PCB thickness: from 0,8 (rigid) to 3 mm PCB weight 1,2 kg N° single step position: N° double step position: Installed power: 0,25 kW Wiring (standard): 400 V 50/60 Hz 3ph+T+N Weight:...
  • Page 9 LOADING UNLOADING The equipment may be delivered packed (wrapped up in plastic material), or in a wood cage (if requested by the customer). The packed machine has to be loaded and unloaded by a truck lift with a sufficient lifting and shifting capacities (see tab.
  • Page 10 Fig.4 1. PCB. 2. Safety barrier. 3. Frame on loading or unloading position. 4. Roller or any other equipment. Buffer v1 pag.10 13/09/24...
  • Page 11 INSTALLATION ➢ Plug in a protected socket. ➢ Turn the main switch on 1. Fig.5 AUTOMATIC ➢ Press on START button. UNLOADING LOADING ➢ Select automatic function by using cycle selector. Check if the conveyor turns in the direction indicated by the arrow AUTOMATIC, Fig.5.
  • Page 12 AUTOMATIC: With the selector on AUTOMATIC the conveyor takes a step each time a timer counting cycle ends, “pause time”(see Fig.6). Fig.6 By using the connector it is possible to connect an mechanical block signal with an equipment positioned after the buffer, in this case the timer begins to count when the contact will close between the terminals 3 and UNLOADING: With the selector on UNLOADING position the conveyor takes a each time a timer counting cycle ends, “pause time”(see Fig.6).
  • Page 13 EMERGENCIES LOADING BLOCK: Reason: ➢ During the loading phase a PCB does not enter the frame, at the following step the machine stops. Effect: ➢ The conveyor stops. ➢ RESET button blinks. Reset: ➢ Take the PCB away and press on RESET button. UNLOADING BLOCK: Reason: ➢...
  • Page 14 FRAME REPLACEMENT ATTENTION! This operation demands the function of the equipment WITHOUT PROTECTIVE CARTER, so it is necessary that a qualified staff only perform it. ➢ Take off the upper protection panels. ➢ Bring the damaged frame in the lower position shown by Fig.7. ➢...
  • Page 15 LINK REPLACEMENT ATTENTION! This operation demands the function of the equipment WITHOUT PROTECTIVE CARTER, so it is necessary that a qualified staff only perform it. ➢ Take off the upper protection panels. ➢ Bring the damaged on the position shown in Fig.7 (replacement position). ➢...
  • Page 16 MACHINE EDGE 1. Pirouetting wheels with brake. 8. Conveyor. 2. Pinion of the conveyor traction shaft. 9. Control board. 3. Conveyor pinion. 10. Electric board. 4. Conveyor movement chain. 11. Photocells entry exit. 5. Step pinion. 12. Micro safety barrier entry exit. 6.

This manual is also suitable for:

Argon ht buffer 40-20