Samsung SPH-I300 User Manual page 151

Samsung sph-i300: user guide
Hide thumbs Also See for SPH-I300:
Table of Contents

Advertisement

Event Conflicts
With the ability to define specific start and end times for any
event, it is possible to schedule events that overlap (an event
that starts before a previous event finishes).
An event conflict (time overlap) displays in the Week view as
overlapping time bars and in the Day view as overlapping
brackets to the left of the conflicting times.
Month View
The Month View displays days that events are scheduled with
dots and lines throughout the Month. The dots and lines
indicate events, repeating events, and untimed events.
Dashed Line
Dots on right side
Dots below
Section 12
148
Date Book
- Indicates a repeating event.
- Indicates a single event.
- Indicate untimed events.

Advertisement

Table of Contents
loading

Table of Contents